HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Feb 8, 2019, 11:45 PM
ST1 ST1 is offline
Registered User
 
Join Date: Jan 2008
Posts: 1,415
The most recent update on SRC is from a week ago, showing about half the pit excavated, so it must be getting close to a full level of excavation.

Quote:
Originally Posted by suburbia View Post
August, by Avi Urban, has been ramping up their advertising. How far along is that construction? I suspect still very early. Looks decent

REF: https://www.aviurban.com/august/

They do have a couple 2 BR + Flex (IE 3 BR) units in the at 1,088 sf and 1,145 sf that could make family living a possibility. I think that's smart. Their A1.3 design is odd though, because the walk-in closet is literally directly across the toilet IE you'd have to step over knees depending on timing. And particularly bad timing could be a sensory nightmare!
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.