Quote:
Originally Posted by CityTech
Electric would probably have a lower installation cost; as J.OT13 pointed out electric wiring is already everywhere in the stations and along the tracks, but natural gas pipelines aren't necessarily on site already. For stations like Hurdman which aren't near any development there's a good chance the nearest gas pipe would actually be rather distant, making the installation and connection cost pretty high. Then in the tunnels (downtown & St. Laurent) you'd want to avoid anything with emissions for ventilation requirements.
I'd imagine they'd have gone with electric simply to avoid all of these issues.
|
They could pipe in Natural gas, or they could have a large propane tank nearby that they fill periodically. You can't just look at installation cost, you also have to look at the 30 year life-cycle cost. I am not sure how those compare.
As for in the tunnel, they might not even need to heat the switches in it, though they may have heaters to be safe. The tunnel will be warmer and it is sheltered so it won't get nearly as much ice build up. As for fumes, there are very few switches, and when combined with lower deicing needs, the fumes would be minimal and should be easily handled by the TVS.