Quote:
Originally Posted by scryer
Hmm... WCE has always been a bit of a puzzle in how it fits with the metro area transit vision for me.
And perhaps I'm moving into transit fantasy territory, and perhaps I'm beating a dead horse, but with all of those stats in mind (in the quoted post) it seems that the WCE is going to need a significant change in the future if we still want to keep the service.
|
If there is any change the WCE needs, it's more trains. That thing is packed every day leaving Waterfront. I haven't really been on the early trains, but the 5, 5:30 and 6:20 trains usually leave with every seat taken.
Not only is the WCE faster for a lot of downtown to suburb trips (especially if you are going to Port Coquitlam and beyond), but the level of comfort is unmatched on the rest of Translink. It's a premium service that attracts premium riders: people who have more than enough money to drive, and wouldn't be caught dead on Skytrain.
Quote:
Originally Posted by fredinno
That's why I said maybe; there might be enough space for one extra track. It wouldn't exactly be easy though, it's not like the spacious ROW in Abbotsford.
And I have to remind people that Squamish has a population comparable to Walnut Grove. Nothing except buses are going to go there anytime soon, and by the time Squamish and Whistler actually need it, we'll most likely have some sort of transit tunnel to the other end of Burrard Inlet.
|
Walnut Grove does have a giant park and ride, with Express bus service direct to Lougheed station on HOV lanes with dedicated, direct exits. Pretty sweet.
It's funny how when we talk about Skytrain we are obsessed with TOD, but why not pair TOD and commuter/intercity rail as a conversation?
The long term promise of the Evergreen line might have encouraged planners in the Tri Cities to zone for high density, but without the WCE people would not have been as willing to buy into it.
People usually aren't interested sacrificing years of their lives on the hopes that promises will be fulfilled and they will have reliable transit. The WCE was an attractive service that allowed for TOD style development around WCE stations and planned Evergreen line stations for decades.
As great as the upgrades to the Sea to Sky are, it is still an unreliable road that can't handle much more traffic volume if there were a population boom in Squamish.
Squamish has a lot of developable land and is well situated to be a vibrant exurb/suburb of the lower Mainland. There is a decent local economy, and the proximity to winter sporting venues could make it an attractive location for University satellite campuses.
But you can't really start dropping thousands more people there without infrastructure. Further upgrading the highway could cost billions. Whereas decent speed intercity/commuter rail could be quite affordable.
If the service was extended to Whistler, then trains travelling regularly in both directions would serve commuters travelling to the city, Whistler workers living in Squamish, and tourists looking for an easy way to visit Sea to Sky.
In my opinion, waiting for there to be a problem before fixing it is the same as planning on people making poor decisions.
If we want more places for people to live in the region (like Squamish) then we have do things to encourage it, not hope people make a bad personal decision then reward their mistakes decades later with the infrastructure they always needed.
If we don't want to encourage and help people to live in places like Squamish, then the alternative is ever skyrocketing real estate prices or the consumption of more ALR lands.