Quote:
Originally Posted by CoryB
The old rail line was purchased with the intent for it to be a BRT corridor. <full stop>.
Further, the community consultations on the greenway were clear and upfront on what the plans were. Nothing hidden here at all.
|
Long time residents of the area are aware of this but that was over a decade ago and any appetite for BRT in this city is now much reduced after the realization that Winnipeggers were sold a bill of goods regarding the SW Transitway. Perhaps it is time to hold a referendum on future expansion of BRT.
People are aware that the cost, which is north of a half a billion dollars for an 11 km (8 mile) roadway, has not been justified. The first leg has resulted in no significant investment in TOD and nor is there any evidence that ridership has increased in the areas served by it. Meanwhile, routes along Portage, Henderson, St. Mary's and Main often run over capacity. What we have now is a corridor where only one station is utilized and that one unfortunately is covered in pigeon poop. The others lie almost unused; desolate and windswept. The second leg, the so called "dog leg", will run through areas where there are very few people, and where there are people, they are most certainly not the transit using demographic. The "B" in BRT is increasingly standing for boondoggle rather than bus.
I am virtually certain that any candidate for council in NK who is in favour of converting a portion of the Greenway to a high speed bus road has no chance of winning election. The current councillor would be vehemently opposed to such a project. There is no need to built a RT line to serve a large supermarket, a strip mall and Gateway rec centre. The density and ridership are adjacent to Henderson Hwy. not to the Greenway, and furthermore, residents near Gateway do not want clusters of apartment towers in their area! Any such plan will be vigorously opposed.
Finish the SW BRT as too much has already been invested in it. There must be a moratorium on all future BRT expansion and a rail based system planned and built expediently to serve areas which already have significant population density and ridership. Build it for the people who use it, as opposed to build it and they might ride. Remember, the city and environs are pushing towards a million even faster than anticipated. We have already outgrown BRT. If the choice was BRT or nothing then I would think it better to have no RT system and utilize the funds for increased frequencies on heavily-used routes (so we could achieve better route rationalization) and a more comfortable system for the user, such as properly heated shelters and increased safety.
(Just for a joke, check out the routing of the 16 Osborne-Island Lakes, it is tantamount to torture for those poor riders who use it).