Quote:
Originally Posted by fredinno
I agree, except that building more hydro basically means buying run-of-river power from IPPs, since the BC Clean Energy Act prevented BC from building large dams in any other sites proposed other than Site C. 
|
that can always be changed, takes a stroke of a pen in the Legislature.
no need to rely on IPP's; we didn't used to, and we don't need to. that was just 1 governments idea, that doesn't mean it cant/wont be changed. i don't see us needing another huge power project in the near future anyways. many of our dams can still be upgraded and expanded without a ton of work. on-top of that, there is constantly new technology that is taking more power out of existing capacity by replacing the equipment at the end of its life with new equipment.
in the end, the issues of IPP is easy to change, and with Site C, i don't see us needing a large capital project in the future. the NDP i am sure will be pro BC Hydro vs outsourcing such as with IPPs.
i am not arguing large dams are the best thing, but, if you want a power grid such as what BC has built, then i say stick with what we know, stick with the proven technology, and don't reinvent the wheel. upgrade the dams we have as much as possible, then maybe look at the other sites BC Hydro has on the books. there are more than Site C that were original identified.
but, we probably really should get back on topic with the bridge.
i say lets not touch it. i don't like the idea of ruining tons of ALR land and keeping the tunnel. it'll be so convoluted and environmentally harsh. we should do it once, and get it done right so we don't have to do it for 125 years. instead of this "oh its been 50yrs, due to shortsighted plans we need to fix it." time to fix the record before it goes around again.