  #3361  
Old Posted Dec 24, 2018, 7:32 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
Quote:
Originally Posted by fredinno View Post
Exactly, the requirement is much more strategic than profit-based. Same as the George Massey.
Not really, it's actual profit if you can sell the power for much more than the typical spot price.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #3362  
Old Posted Dec 24, 2018, 8:28 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Alex Mackinnon View Post
Not really, it's actual profit if you can sell the power for much more than the typical spot price.
3.5x?
Reply With Quote
     
     
  #3363  
Old Posted Dec 24, 2018, 2:25 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
Quote:
Originally Posted by fredinno View Post
Exactly, the requirement is much more strategic than profit-based. Same as the George Massey.
Not really my point. My point is that Site C will produce power for the domestic market at a reasonable cost relative to what we pay today. And we'll need a ton more supply to facilitate a transition to electricity from fossil fuels.

Site C has an ROI in pure $. GMB might have over it's lifetime with tolls, but not now..
Reply With Quote
     
     
  #3364  
Old Posted Dec 24, 2018, 9:13 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
Quote:
Originally Posted by fredinno View Post
3.5x?
I'm not going to predict the power futures market. Intermittent production and load swings has produced everything from periodic negative power prices to prices well over $1,000/MWh. BC Hydro basically gets to play arbitrage with power prices whenever it suits them.

Quote:
Originally Posted by WarrenC12 View Post
Not really my point. My point is that Site C will produce power for the domestic market at a reasonable cost relative to what we pay today. And we'll need a ton more supply to facilitate a transition to electricity from fossil fuels.

Site C has an ROI in pure $. GMB might have over it's lifetime with tolls, but not now..
On that note, you can't really compare the cost of an existing depreciated asset to new production, especially if you're looking at any of the Columbia River dams.

The Americans paid us a lot of money to build that infrastructure. They paid for the dams, they pay us to store flood water, and they pay us for the extra power generated downstream thanks to the seasonal storage. BC Hydro essentially only had to pay for the generating stations and distribution.

I'd bet that Revelstoke and Mica Dam would have been very expensive projects if undertaken today.

For GMT, the benefits are all in time saved and economic activity fostered. A much hard concept to measure, but equally as valuable to society. The real discourse should be focused of maximizing this benefit vs. other options; not weather or not tolls will pay for the damned thing.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #3365  
Old Posted Dec 24, 2018, 10:37 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Quote:
Originally Posted by WarrenC12 View Post
We will need all of Site C and more if the CleanBC plan proceeds and we electrify transportation and heating in this province. It's in a prime spot to sell power to LNG plants so they don't burn NG for their massive energy requirements, and sell clean electricity to Alberta if they ever see the light of climate change.
Right, we're talking about enough maximum power for 50-100 years' worth of growth and tech advancements; solar's useless up north, geothermal causes earthquakes, and nuclear everybody seems to be allergic to, so that means hydro.

Though I still say the Libs should've gone with the three smaller dams instead.
Reply With Quote
     
     
  #3366  
Old Posted Dec 25, 2018, 9:19 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by Migrant_Coconut View Post
Right, we're talking about enough maximum power for 50-100 years' worth of growth and tech advancements; solar's useless up north, geothermal causes earthquakes, and nuclear everybody seems to be allergic to, so that means hydro.

Though I still say the Libs should've gone with the three smaller dams instead.
That's not enough power for 50-100 years. Site C has a net annual generation capacity of 5100 GWH. If we electrified our entire petroleum consumption, the total BC Hydro Generation Capacity would increase from 56000 GWH to 161560 GWH. https://www.huffingtonpost.ca/blair-king/bc-energy-site-c-dam-hydro_b_7969110.html

It's a drop in the bucket. Geothermal is the best choice right now, considering it's basically fracking for renewable energy (tons of experienced people nearby, and knowledge how to deal with NIMBYs), and prime spots fairly near to the consumer are still untapped (Pemberton and the Gaglardi Range).

No renewable energy source is going to be completely free from environmentalist-NIMBY overruns.

The Libs going with smaller dams would basically mean going with more IPPs, which creates a whole new set of issues and concerns.
Reply With Quote
     
     
  #3367  
Old Posted Dec 25, 2018, 5:00 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
Quote:
Originally Posted by fredinno View Post
That's not enough power for 50-100 years. Site C has a net annual generation capacity of 5100 GWH. If we electrified our entire petroleum consumption, the total BC Hydro Generation Capacity would increase from 56000 GWH to 161560 GWH. https://www.huffingtonpost.ca/blair-king/bc-energy-site-c-dam-hydro_b_7969110.html

It's a drop in the bucket. Geothermal is the best choice right now, considering it's basically fracking for renewable energy (tons of experienced people nearby, and knowledge how to deal with NIMBYs), and prime spots fairly near to the consumer are still untapped (Pemberton and the Gaglardi Range).

No renewable energy source is going to be completely free from environmentalist-NIMBY overruns.

The Libs going with smaller dams would basically mean going with more IPPs, which creates a whole new set of issues and concerns.
To be fair, Blair makes his money working for natural gas companies.

Certainly BC will require more electricity, but that leaves how much more efficient electricity is, certainly for transportation. Fossil fuel engines are still very inefficient, despite the gains we've made in over a century with the internal combustion engine. It really speaks to how energy dense crude oil is.

Other clean sources of heat will be required, like renewable natural gas, corn based ethanol, biomass fired heat systems, etc. We also have a long ways to go on efficiency and conservation measures, so much less energy is required to maintain building comfort and get to where we need to go.

BC Hydro keeps forecasting increasing demand, yet despite the influx of population, and our electronic lifestyles, actual usage has remained relatively flat for years. Hydro can further curb demand with time of use charges, escalating rates, etc.

We will need Site C of course, and perhaps another large project, although the Green party thinks we can make do with a lot of smaller, clean generation.
Reply With Quote
     
     
  #3368  
Old Posted Dec 25, 2018, 9:38 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Quote:
Originally Posted by fredinno View Post
Geothermal is the best choice right now, considering it's basically fracking for renewable energy (tons of experienced people nearby, and knowledge how to deal with NIMBYs), and prime spots fairly near to the consumer are still untapped (Pemberton and the Gaglardi Range).
Again, earthquakes.
Reply With Quote
     
     
  #3369  
Old Posted Dec 25, 2018, 9:58 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
the fact of the matter is this:

no matter how the power is generated, there is an anti-environmental aspect to it.
  • wind turbines - take a lot of land, kills birds, the sound they make, and needing batteries to store it.
  • solar - takes a lot of space, cooks birds as the fly over, manufacturing of the mirrors isn't good using lots of resources such as toxic chemicals and water, also needs batteries to store it.
  • tidal - coastal erosion, impact to marine habitats from space and sounds from turbines, very expensive
  • geothermal - still some greenhouse gas emissions, earthquakes, expensive and if it is sustainable such as removing energy from earth faster than it is replaced.
  • hydroelectric - takes up a lot of space for the reservoir, animal habitat changes such as fish having problems getting to spawning grounds

there are other types, but no matter what the type is. they all have environmental impacts. the key is to look at each type specific to BC and see what is the best value for rate payers to create the cheapest power, longest lasting system, as well as environmental impact.

my personal view is that hydro-power is the best for BC. there is a lot of experience with the technology, it is very proven in BC, and it is known to create fairly cheap power with low maintenance costs. we have basically the lowest power rates in North America along with Quebec, both of us using lots of hydro-power.

the other types are more experimental, and even the own governments report about Site C said the other types most likely wouldn't be any cheaper and possibly more expensive.

i would rather stick with proven, tried and true to BC, which BC Hydro knows what to do with.

i know many people say Site C isn't needed, but with everything wanting to go electric, we are going to need the power one day. better to have it for the future than need it ASAP and it takes 10yrs to build.
Reply With Quote
     
     
  #3370  
Old Posted Dec 25, 2018, 10:14 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
Quote:
Originally Posted by VancouverOfTheFuture View Post
the fact of the matter is this:

no matter how the power is generated, there is an anti-environmental aspect to it.
  • wind turbines - take a lot of land, kills birds, the sound they make, and needing batteries to store it.
  • solar - takes a lot of space, cooks birds as the fly over, manufacturing of the mirrors isn't good using lots of resources such as toxic chemicals and water, also needs batteries to store it.
  • tidal - coastal erosion, impact to marine habitats from space and sounds from turbines, very expensive
  • geothermal - still some greenhouse gas emissions, earthquakes, expensive and if it is sustainable such as removing energy from earth faster than it is replaced.
  • hydroelectric - takes up a lot of space for the reservoir, animal habitat changes such as fish having problems getting to spawning grounds

there are other types, but no matter what the type is. they all have environmental impacts. the key is to look at each type specific to BC and see what is the best value for rate payers to create the cheapest power, longest lasting system, as well as environmental impact.

my personal view is that hydro-power is the best for BC. there is a lot of experience with the technology, it is very proven in BC, and it is known to create fairly cheap power with low maintenance costs. we have basically the lowest power rates in North America along with Quebec, both of us using lots of hydro-power.

the other types are more experimental, and even the own governments report about Site C said the other types most likely wouldn't be any cheaper and possibly more expensive.

i would rather stick with proven, tried and true to BC, which BC Hydro knows what to do with.

i know many people say Site C isn't needed, but with everything wanting to go electric, we are going to need the power one day. better to have it for the future than need it ASAP and it takes 10yrs to build.
How about nuclear?
Reply With Quote
     
     
  #3371  
Old Posted Dec 25, 2018, 10:32 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Quote:
Originally Posted by cganuelas1995 View Post
How about nuclear?
Not as long as the poster child of the industry is this guy:



Seriously, there's too many environmentalists in BC - with way too much misinformation - for any kind of nuclear to ever get off the ground. Which is a shame, because there's a sizeable chunk of thorium under Prince Rupert.
Reply With Quote
     
     
  #3372  
Old Posted Dec 25, 2018, 11:28 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by cganuelas1995 View Post
How about nuclear?
i am anti-nuclear myself. we don't need it, it is risky, and this is a very active earthquake zone.

but it also has negatives as the waste caused needs to be stored forever, they are expensive, and they require tons of water to cool them, such as a river. and if anything were too happen, .

we just don't need it here, so to me it isn't worth the risks.
Reply With Quote
     
     
  #3373  
Old Posted Dec 26, 2018, 4:06 AM
misher's Avatar
misher misher is offline
BANNED
 
Join Date: Jul 2018
Posts: 4,537
Quote:
Originally Posted by VancouverOfTheFuture View Post
i am anti-nuclear myself. we don't need it, it is risky, and this is a very active earthquake zone.

but it also has negatives as the waste caused needs to be stored forever, they are expensive, and they require tons of water to cool them, such as a river. and if anything were too happen, .

we just don't need it here, so to me it isn't worth the risks.
The breeder reactor allows waste to be reduced dramatically (99% after 100 years) and fuel used to be reduced 99%. It’s just more expensive as uranium is cheap.

But yes we have tons of resources here that allow us to use hydro dams and possibly harness sea waves instead of nuclear here.

Last edited by misher; Dec 26, 2018 at 4:44 AM.
Reply With Quote
     
     
  #3374  
Old Posted Dec 26, 2018, 6:31 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
Nuclear is no longer cost effective due to the waste created and excessive safety requirements. Look at the cost of the recent failed projects in the US. It makes Site C look like chump change, and they didn't even operate(!).
Reply With Quote
     
     
  #3375  
Old Posted Dec 26, 2018, 6:33 AM
dharper dharper is offline
Registered User
 
Join Date: Jun 2010
Location: North Surrey
Posts: 293
Seeing as we are getting way off topic:

Directions for: Shortbread Cookies
INGREDIENTS
Shortbread Cookies
1 cup unsalted butter at room temperature

½ cup plus 2 Tbsp icing sugar

¼ cup cornstarch or rice flour

1 ½ cup all purpose flour

½ tsp salt

1 tsp vanilla extract

Chocolate Nougat Shortbread
Chocolate nougat candy

DIRECTIONS
Shortbread Cookies
1. Preheat oven to 350 °F. Beat butter until light and fluffy. Sift in icing sugar and beat again until fluffy, scraping down sides of the bowl often. Sift in cornstarch or rice flour and blend in. Sift in all purpose flour and salt and mix until dough comes together (it will be soft). Stir in vanilla.

2. Spoon large teaspoonfuls of cookie dough (or use a small ice cream scoop) onto an un-greased cookie sheet, leaving 2 inches between cookies and bake for 18 to 20 minutes, until bottoms brown lightly. Remove from cookie sheet to cool.

Chocolate Nougat Shortbread
1. Prepare shortbread recipe as above and spoon onto an ungreased baking sheet. Press a triangle piece of chocolate nougat candy into the center of each cookie and bake for 18 to 20 minutes, until bottoms brown lightly.


from foodnetwork.ca
Reply With Quote
     
     
  #3376  
Old Posted Dec 26, 2018, 8:25 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by VancouverOfTheFuture View Post
the fact of the matter is this:

no matter how the power is generated, there is an anti-environmental aspect to it.
  • wind turbines - take a lot of land, kills birds, the sound they make, and needing batteries to store it.
  • solar - takes a lot of space, cooks birds as the fly over, manufacturing of the mirrors isn't good using lots of resources such as toxic chemicals and water, also needs batteries to store it.
  • tidal - coastal erosion, impact to marine habitats from space and sounds from turbines, very expensive
  • geothermal - still some greenhouse gas emissions, earthquakes, expensive and if it is sustainable such as removing energy from earth faster than it is replaced.
  • hydroelectric - takes up a lot of space for the reservoir, animal habitat changes such as fish having problems getting to spawning grounds

there are other types, but no matter what the type is. they all have environmental impacts. the key is to look at each type specific to BC and see what is the best value for rate payers to create the cheapest power, longest lasting system, as well as environmental impact.

my personal view is that hydro-power is the best for BC. there is a lot of experience with the technology, it is very proven in BC, and it is known to create fairly cheap power with low maintenance costs. we have basically the lowest power rates in North America along with Quebec, both of us using lots of hydro-power.

the other types are more experimental, and even the own governments report about Site C said the other types most likely wouldn't be any cheaper and possibly more expensive.

i would rather stick with proven, tried and true to BC, which BC Hydro knows what to do with.

i know many people say Site C isn't needed, but with everything wanting to go electric, we are going to need the power one day. better to have it for the future than need it ASAP and it takes 10yrs to build.
I agree, except that building more hydro basically means buying run-of-river power from IPPs, since the BC Clean Energy Act prevented BC from building large dams in any other sites proposed other than Site C.

Run-of-River is seasonal, and the large dams are multi-purposed as batteries, so geothermal could provide more base capacity. Also, Run-of-River itself is limited due to environmental reasons.

Also, IPPs are like P3 contracting in that the costs are spread out long-term, and often would cost more on the long term. Also, how much energy run-of-river can realistically provide is another question.

If we need to double our power production due to electrification, we need more than just run-of-river, due to storage capacity limitations, if nothing else.

Quote:
Originally Posted by Migrant_Coconut View Post
4.5 on the Ritcher Scale is comparable to a very fat man walking though town...

But seriously, they're probably not going to even build it near Pemberton itself. Meager Creek is near Pemberton. https://dogwoodbc.ca/news/south_meager_geothermal_project/
Fracking also causes minor earthquakes, it's not as big of a deal as the flooding new hydro dams entail.

Run-of-River has the potential to destroy fish stocks without strict regulations on location and how much water can be taken out of the system.
Reply With Quote
     
     
  #3377  
Old Posted Dec 26, 2018, 9:01 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by fredinno View Post
I agree, except that building more hydro basically means buying run-of-river power from IPPs, since the BC Clean Energy Act prevented BC from building large dams in any other sites proposed other than Site C.
that can always be changed, takes a stroke of a pen in the Legislature.

no need to rely on IPP's; we didn't used to, and we don't need to. that was just 1 governments idea, that doesn't mean it cant/wont be changed. i don't see us needing another huge power project in the near future anyways. many of our dams can still be upgraded and expanded without a ton of work. on-top of that, there is constantly new technology that is taking more power out of existing capacity by replacing the equipment at the end of its life with new equipment.

in the end, the issues of IPP is easy to change, and with Site C, i don't see us needing a large capital project in the future. the NDP i am sure will be pro BC Hydro vs outsourcing such as with IPPs.

i am not arguing large dams are the best thing, but, if you want a power grid such as what BC has built, then i say stick with what we know, stick with the proven technology, and don't reinvent the wheel. upgrade the dams we have as much as possible, then maybe look at the other sites BC Hydro has on the books. there are more than Site C that were original identified.



but, we probably really should get back on topic with the bridge.


i say lets not touch it. i don't like the idea of ruining tons of ALR land and keeping the tunnel. it'll be so convoluted and environmentally harsh. we should do it once, and get it done right so we don't have to do it for 125 years. instead of this "oh its been 50yrs, due to shortsighted plans we need to fix it." time to fix the record before it goes around again.
Reply With Quote
     
     
  #3378  
Old Posted Dec 26, 2018, 9:11 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
Quote:
Originally Posted by officedweller View Post
But did you see what the report says is sufficient for the Steveston Hwy interchange?

Would a 3+1 configuration be strange? 3 Vancouver Lanes + 1 Stevston Lane?

I agree with the report that with a 8 lane bridge, a massive interchange structure would be out of place. With a 10 lane bridge and collector lanes, the impact of a backup on the interchange would be significantly reduced on the through lanes.

I'm sure we have numerous examples of this phenomenon on the Port Mann bridge over the past few years.
Reply With Quote
     
     
  #3379  
Old Posted Dec 26, 2018, 9:41 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by VancouverOfTheFuture View Post
i am not arguing large dams are the best thing, but, if you want a power grid such as what BC has built, then i say stick with what we know, stick with the proven technology, and don't reinvent the wheel. upgrade the dams we have as much as possible, then maybe look at the other sites BC Hydro has on the books. there are more than Site C that were original identified.
I just said that they can't. Technically, the Clean Power Act could be modified to allow for them, but it'd almost certainly be an unpopular move to 'unprotect' those rivers, and I doubt the political will exists.
Reply With Quote
     
     
  #3380  
Old Posted Dec 26, 2018, 2:51 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 483
Quote:
Originally Posted by Bobert View Post
Would a 3+1 configuration be strange? 3 Vancouver Lanes + 1 Stevston Lane?

I agree with the report that with a 8 lane bridge, a massive interchange structure would be out of place. With a 10 lane bridge and collector lanes, the impact of a backup on the interchange would be significantly reduced on the through lanes.

I'm sure we have numerous examples of this phenomenon on the Port Mann bridge over the past few years.
I think a true C/D system like the PMB would be ideal. 2 lanes for Richmond up until the airport exit or even BC91 and then 2+HOV lanes for Vancouver
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.