Quote:
Originally Posted by Aroundtheworld
Even 2% is generous. For fully-laden cars carrying mineral ore, the maximum grade is 0.5%. (I used to work as a rail engineer)
|
Assuming the tunnel (or as suggested, new rail bridge with a lifting span) has a 25 m clearance (the George Massey Tunnel is 22m deep, and Port Mann is 42m clearance for comparison), the 5 km leadway would start @90 Av for the Surrey South Spur.
Definitely possible without making a spiral staircase- though probably best to make it a tunnel to avoid blighting the surrounding area.
Full 42m clearance is probably impossible economically, though, since the tunnel would start beyond the Alex Fraser- at that point, you're tunneling a quarter of the entire rail system.
Maybe we could have two tunnels, one for higher-grade traffic, and keep the old bridge for lower-grade traffic?
Quote:
Originally Posted by Firebrand
Is there a railway thread in this sub-forum? It seems that we’ve deviated so far it’s no longer related to the main topic of this thread.
|
There's a commuter Rail Thread.