Translated from French about ''Le Phare'' project in Québec City :
(Original article, click here) :
https://www.journaldequebec.com/2018/11/22/dallaire-va-de-lavant-avec-son-megaprojet
Dallaire goes ahead with his ''Le Phare'' megaproject.
Despite the strong opposition expressed in recent weeks during the three nights of information and consultation on Le Phare project, Michel Dallaire said that his megaproject will go ahead.
"I did not expect a lot of people to come out and defend us tonight [Wednesday]. This is not a forum for that. It is a forum that is there to listen to people who do not agree, "said the promoter of the project.
The latter assured the same breath that polls show strong support from the people of Quebec at these four towers, including a 65-storey, Sainte-Foy.
"Big shade"
Mr. Dallaire, who was eager to attend all public meetings of the City, reiterated that the idea of building such a high tower at the entrance to Quebec City came from his Group, not from the Mayor.
"Mr. Labeaume did not call me to ask me to build a 65-storey building. Mr. Labeaume has publicly asked that Groupe Dallaire, for this site, make a significant project for the Quebec City region. There is a big nuance, "he insisted.
Minimized fear
The businessman has also minimized the fears concerning the inconvenience associated with 10 years of work.
"The inconvenient part is when you dig. But we are not 10 years in excavation. After the excavation, we work inside our site, "he assured.
According to him, the work at Le Phare and those planned in the same sector for the structuring transport network (in particular for the interchange hub) will not be mutually detrimental.
"We coordinate with the City to do the work at the same time and not to open a street twice," he said.
Michel Dallaire hopes that the work of Le Phare will begin in the spring of 2019. The proponent will have to obtain the municipal permits required for each phase of construction of the megaproject.