Quote:
Originally Posted by Metro-One
In all honesty I believe that the L-Line LRT would have never been cancelled if the LRT supporters didn’t push LRT onto the Fraser extension to Langley as well, especially without any public consolations. This is what really angered people I think. The sneaky nature of deciding the technology for the project. This election was the public’s chance to voice their opinion, and they chose Skytrain.
|
The LRT project was lacking support even on the L-line.
Quote:
Originally Posted by scryer
Nothing beats out skytrain to UBC. Not by a long-shot. I'm willing to bet that the Mayor's council will eventually redirect the LRT funds from Surrey to help pay for the extension out to UBC, and that Surrey will agree to this so long as the Mayor of Vancouver is willing to support Skytrain in Surrey. I already called the LRT getting scrapped, years ago and I have a feeling that the Vancouver and Surrey mayors are playing a little game of "scratch my back and I'll scratch your's".
Potential ridership is a very fragile crutch to lean on here. They speculated the same thing about the Canada Line, and look at what happened. They said rider-ship was poor on the Millennium line and it has been increasing year by year (as far as I know, someone can correct me if I'm wrong), and I'm not even going to get into how it will increase once it extends out west. The entire Skytrain model has always been about building for the future. This is a project that addresses the needs of the Lower Mainland's second largest city (by population) and it connects both of the largest cities seamlessly. Does induced demand ring any bells here?
Not only that but there is also a B-line bus (if I remember correctly) that will be introduced in 2019 that goes down Fraser Valley. So if you are looking for ridership specifically, you'll have to wait until we get the data from that new route  .
|
You can't just redirect funds; plus, the amount of money left over by a truncation in Fleetwood is not enough to extend the Broadway Extension beyond Arbutus (maybe to Macdonald St. at most), anyways. It's more likely to see that money go to a B-line on the L-line route, from Guildford, to Newton.
I honestly still prefer the RRT3 option, but the plans for RRT1 were already laid out to a high level of detail, and there's no push for RRT3, so I'm expecting it to become the Hwy 91 of SOF Transit. Oh well.
Also, where do they expect $1 billion to extend to land into their hands from? I'm all for extending to Langley, but I don't understand how they're expecting $1 Billion to fall out of thin air?
Quote:
Originally Posted by Galaxy
Some of that extra Billion may come from only having to build one OMC centre for the Millenium line extension UBC and Surrey Extensions as well as the space allocation for the new train sets that are being delivered as we speak and into the better part of 2019. Translink was going to have to build a few OMC's especially if that LRT plan went ahead. Now that the LRT is cancelled they can make the spending more efficient and that can benefit everyone. There is also an election coming and I imagine a little more money from the Feds may come online to make up for the shortfall. I wonder though if they could combine both extensions on a single RFP to see if the company that bid can give a better deal considering they would build out both extensions at the same time. There is only a little section that will be elevated in Vancouver and a lot more elevated track in Surrey so those modules could be all cast the same time to save cost. Also, purchasing tracks and cars, as well as track ties in larger volumes, could be a saving for the project.
|
The cost for the Fraser extension included a new OMC for Skytrain. There's no real savings from the initial estimates, since Translink assumed a seamless extension already for Phase 2.
Quote:
Originally Posted by Migrant_Coconut
Hopefully with all the added revenue, plus prov/fed grants, there's enough room in the budget for it and North Van simultaneously. We do NOT need another either/or pissing contest.
|
I doubt it. any Skytrain to the North Shore, despite demand, would cost a fortune (Skytrain would have to go by the deepest part of Burrard Inlet due to the layout of the Expo Line (the only realistic choice to extend into North Van- Canada is too shallow), you would likely have to move the WCE rail station to fit a new tunnel extension, and Lonsdale Quay Station would likely still be a very deep station. I remember there was a thread way back, but I can't find it.
(I wonder if they'd put it down towards Lynn Hwy instead of the B-line route towards Ambleside considering the greater density on that corridor :/)
So yes, we will likely have an either/or pissing contest, sadly.