Originally Posted by OCCheetos View Post
Not necessarily. The last parts of the transitway (Tunney's) closed a year and a half ago and there was much more work to be done in that case.

The extension (South Keys and southwards) can begin construction immediately.

For the rest: the biggest parts of the Trillium Line upgrade are the grade separation at Ellwood, Gladstone station (and Walkley I suppose?) and the modifications to Bayview for the second platform. Those should definitely be doable in 16 months. Everything else is trivial, relatively speaking.
Just remember we will need new grade separations at Lester, Leitrim, Earl Armstrong, Bowesville, and Limebank Roads and Uplands Drive and a new bridge at Hunt Club Road. That is a lot of work.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.