Quote:
Originally Posted by lrt's friend
We cannot just 'reward' existing riders. If that were the case, we would just keep upgrading what we have and never build to anybody else. Doesn't this limit ridership growth potential? I would say so. Orleans is not the only growth point in our city. And it is funny how we neglect riders in the city centre.
I would like to know what city is just building to existing high modal share areas.
|
Places without real political interference. If Toronto had the choice, they'd be building the DRL over the Scarborough subway as an example. The LRT corridors picked for Transit City were all based on very high ridership bus/streetcar routes.
Most cities are building to new areas not previously served by rapid transit.
Look at Montreal, Toronto, Calgary, Edmonton and Vancouver. They are all doing it. Everybody knows that to grow ridership and improve your transit system, you need to expand service broadly. There needs to be more spokes and new cross connections. Our cities are growing and there is a need for better transit connections throughout, not to one or two chosen neighbourhoods. Otherwise, Toronto would build a second Yonge subway, one block away.
Quote:
Originally Posted by lrt's friend
Sure, we need to protect the existing market and if it makes sense, we should upgrade service. But there needs to be real goals. Service needs to be improved. We don't build multi-billion dollar LRT lines to deliver the same or worse service. Furthermore, there is a saturation point. If we have already got most of those federal public servants on board. What are we going to gain? Not much.
|
How are people not getting this? We didn't build a multi-billion dollar LRT for "the same service". We built it to have > 20 000 pphpd. That is a massive increase in throughput. The city was effectively capped out on the BRT.
Quote:
Originally Posted by lrt's friend
Lower modal share is an indication that there may be pent up demand especially if existing service is slow. Of course, there are other factors such as a local job base. But is that stopping us from building out to Kanata as soon as possible?
|
The plan is a pretty straightforward conversion of the Transitway to LRT. And the corridor already has thousands of pphpd. It's perfectly sensible to convert it. What's debatable are some of the Stage 3 plans.
Quote:
Originally Posted by lrt's friend
At some point, we need to look at the gaps in service and fill those in. We shouldn't expect people to take long bus rides to LRT.
|
The majority of residents will be within 5 km of the LRT. That's about a 20 min bus ride. This is pretty much the same for most of Toronto. If you're expecting to get metro service to within a km of your house, I don't know what to tell you....
Quote:
Originally Posted by lrt's friend
That is exactly why the Green Line is being built in Calgary. Meanwhile Calgary is also building a BRT network that will create those cross connections that every bigger city transit system needs. What is Ottawa doing? Implementing a frequent service network that is no better than what existed before.
|
And yet Calgary has lower modal share than Ottawa. If their system is so great, why is nobody riding it? Their mode share would have to grow by over 27% to match Ottawa:
https://www12.statcan.gc.ca/census-recensement/2016/as-sa/98-200-x/2016029/98-200-x2016029-eng.cfm
Even on total annual ridership. They are only 5.6% ahead. During a time when our system faces massive disruption.
So please stop with the nonsense about us being so terrible at transit. I'd say they have a few lessons they could learn from us.
Quote:
Originally Posted by lrt's friend
We will see if we are back to 100 million riders anytime soon. I figure that with our student pass program, we have lost far more adult riders than the figures suggest on first glance and that spells trouble in the long run. And no sooner do we have Phase 1 open, that construction begins that will continue to delay transit, east, west and south on almost every rapid transit route. How does that grow ridership?
|
Construction doesn't start still Spring 2020. And if we launch in early 2019, that's just under a full year without construction. We'll get to see how people adjust to the LRT. I doubt we'll get over 100 million. But I think we'll see a strong uptrend. And the good part about Stage 2, is that, with the exception of the full Trillium Line closure, other riders aren't as impacted as they were in Stage 1.