Quote:
Originally Posted by lrt's friend
We do not have the level of supporting bus service that exists in Toronto or Montreal.
|
Nor do we have the density or ridership in most of this city that they do. But yes, I hope we move past 30 min bus service for most of the city, for most of the day eventually.
Quote:
Originally Posted by lrt's friend
You say it is not a concern to you, if people have to wait for more than one train to pass. Why is that? Because you are not directly affected?
|
Really? You have to resort to this kind of insinuation?
It's not a concern to me because transfers at Bayview work exactly the same as they do elsewhere in the world. You are acting as though this is something novel that Ottawa has discovered. And you're acting as though some dude in a basement conjured this up and there was no modelling or flow analysis involved when they planned the transfer and the network.
It's just not an issue. In real life, the arriving train has a certain discharge capacity, limited by the number of doors. 500 people don't just jump off one train and pop up on the second floor of the station instantaneously. The first of the riders to get off will get the immediate connection, the rest will catch the next train. There will also be some split of riders too. So not 100% going eastbound. And then there's room freed up from the eastbound Confederation Line by those heading south on the Trillium Line. As long as they've mapped out the capacities into the station this will be fine.
Quote:
Originally Posted by lrt's friend
Regarding the Bayview transfer, every city has different issues. I did point out that some people will be going in the opposite direction. It is reasonable to expect that once the Trillium Line is extended to serve normal commuters (as opposed to mostly students at the present time), those heading towards downtown will increase in numbers and proportionally. If the Trillium Line is to be the trunk line for the south end of the city, people heading downtown will expect efficient transfers at Bayview.
|
Quote:
Originally Posted by lrt's friend
This is exactly replicating the problems at Bloor and Yonge.
|
If you dumb it down like this then every transfer point in the world is going to be Bloor and Yonge to you and no city should ever build transfers, because according to you, clearing out riders is always going to be an issue unless you can unload a full train directly into a completely empty train. This is exactly how your viewpoint comes across.
Bloor and Yonge is a specific problem because the Bloor platform is specifically rate limited to the number of trains per minute, which limits how quickly it can clear riders arriving on the Yonge platform. Trains also arrive at Bloor relatively full, which really limits the onboarding of passengers arriving from Yonge.
This is absolutely not the case at Bayview. The ratio of trains between the Confederation Line and Trillium Line is 17:8 per hour. And each Confederation Line train has more total capacity than a Trillium Line train. I would be far more worried about transfers at Hurdman and that becoming a Yonge-Bloor scenario where a train that's pretty full after St. Laurent is arriving at a massive transfer hub.
Quote:
Originally Posted by lrt's friend
Perhaps on a smaller scale as far as numbers of people inconvenienced, but still people may be waiting multiple trains to reach their destination.
|
At most, depending on when you get off the train, you'll get up the stairs to see a train leave and wait for the next one.
Quote:
Originally Posted by lrt's friend
This also extends out travel times and affects reliability of the overall service, the supposed selling point of rail service.
|
Nobody was trying to "sell rail" in Ottawa. The Confederation Line was built to relieve bus congestion in the core. Simple as that.
Quote:
Originally Posted by lrt's friend
So you add another 4 minutes, on top of the delays caused by slow operating trains on the Trillium Line that has already added 5 minutes north of Greenboro. That is close 10 minutes extra time being added on trip times that now take 20 minutes to go from Greenboro to downtown today. If we are building very expensive rail lines, they need to provide the same speed of service at a very minimum.
|
Again, the Confederation Line was built not to provide Cadillac Service to anyone but to solve a very real overload in the core of the network. That's the design driver, not how long it takes a particular rider to get downtown. Heck, it's very possible with the bus to LRT transfer that some riders might actually see a longer ride in the east-end depending on their destination.
Next, if you expect a zero minute transfer, it's not going to happen. You're better off driving. Generally, planners budget anywhere from 5-10 minutes for a transfer based on how long it will take for people to get up the stairs and across platforms.
Lastly, I fail to see how the transfer at Bayview will be any worse than what is there today for Trillium Line riders. Do you consider Bayview to be like Bloor and Yonge today because we're discharging a full Trillium train on to a BRT clearing out on buses that carry 50-100 riders?