Quote:
Originally Posted by HomeInMyShoes View Post
I'm more offended than ever with respect to Conexus.

Just so wrong in so many ways. Sure, donate to Darke Hall, but strike a partnership to preserve the park and get a break on land in the core, not on a public amenity.
And I'd they really wanted to be close to the park, they could actually take over the old Co-operators building...
     
     
  #8462  
Old Posted Aug 23, 2018, 1:41 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 590
I'm fine with the new Conexus building. That stretch of green space was never used by the public anyways. If people were truly concerned about the park, they would have been up in arms when they cut down 30 mature evergreen trees on the west side of Douglas Park because of the power lines there. But none of these folks were upset by that.

In the end, don't be angry with the U of R or Conexus, be angry with the Provincial Government for not funding the U of R enough to maintain their heritage buildings.
     
     
  #8463  
Old Posted Aug 23, 2018, 1:43 PM
DandyUnderworld's Avatar
DandyUnderworld DandyUnderworld is offline
Downtown Dweller
 
Join Date: Sep 2015
Posts: 26
I've noticed quite a bit of construction activity in the old Adecco space on Scarth...any ideas what's going on in there? Also, the new Factory Optical on Hamilton is nearly finished; there are already displays with glasses.
     
     
  #8464  
Old Posted Aug 23, 2018, 2:22 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
The whole Conexus project is terrible top to bottom. Reaks of corruption at the provincial level.

Brandt is an even worse offender.
     
     
  #8465  
Old Posted Aug 23, 2018, 2:29 PM
KTBuild KTBuild is offline
Registered User
 
Join Date: Jun 2016
Posts: 30
The Lindt store in Harbour Landing is now open. Not sure how they'll ever survive in a massive corner space for such a niche store, but its nice inside.

Starbucks also looks like it might be ready for a fall opening.
     
     
  #8466  
Old Posted Aug 23, 2018, 2:31 PM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is offline
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,387
Quote:
Originally Posted by KTBuild View Post
The Lindt store in Harbour Landing is now open. Not sure how they'll ever survive in a massive corner space for such a niche store, but its nice inside.

Starbucks also looks like it might be ready for a fall opening.
Lindt should have been in the Cornwall Centre.
     
     
  #8467  
Old Posted Aug 23, 2018, 2:38 PM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by one_brick_at_a_time View Post
Lindt should have been in the Cornwall Centre.
Laura Secord’s presence may have precluded that.
     
     
  #8468  
Old Posted Aug 23, 2018, 2:39 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,972
Quote:
Originally Posted by jigglysquishy View Post
The whole Conexus project is terrible top to bottom. Reaks of corruption at the provincial level.

Brandt is an even worse offender.
I think that is unfair. You can argue that there should be no non-government office buildings even on the Park fringes, but this was a legitimate effort to get funding for the Darke Hall restoration. No one else was prepared to pay for it. Darke Hall will once again be a real gem for our City and a wonderful venue for all sorts of entertainment.

Also Conexus is a co-operative. They have no particular ideological or other connection to party in power across the lake.
     
     
  #8469  
Old Posted Aug 23, 2018, 5:54 PM
Festivus Festivus is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,272
Quote:
Originally Posted by Nathan View Post
And I'd they really wanted to be close to the park, they could actually take over the old Co-operators building...
Exactly!
     
     
  #8470  
Old Posted Aug 23, 2018, 9:14 PM
J-Walker J-Walker is offline
Registered User
 
Join Date: Mar 2017
Posts: 52
Quote:
Originally Posted by UPP View Post
I'm fine with the new Conexus building. That stretch of green space was never used by the public anyways. If people were truly concerned about the park, they would have been up in arms when they cut down 30 mature evergreen trees on the west side of Douglas Park because of the power lines there. But none of these folks were upset by that.

In the end, don't be angry with the U of R or Conexus, be angry with the Provincial Government for not funding the U of R enough to maintain their heritage buildings.
Completely agree.... It wasn't like Conexus just weaseled their way into the Park. Dark Hall was deteriorating badly and I'm sure would have been demolished within the next decade or so if it wasn't repaired. It was the UofR that put out a tender for a partner, Conexus was just the best option that stepped up to the plate. I genuinely think the leadership at Conexus thought they were doing a good deed for the community, and they've been kind of getting shit on for it since. I'd rather see a new well-designed building in the park, than the alternative, which would have been the loss of another heritage building.

The Brandt thing though, that's a little harder to justify. I don't see the logic behind that partnership. Lots of vacant space downtown that the CNIB could have moved into.
     
     
  #8471  
Old Posted Aug 23, 2018, 11:54 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Didn't CNIB move downtown last year?
     
     
  #8472  
Old Posted Aug 24, 2018, 1:16 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
Quote:
Originally Posted by djforsberg View Post
Lee is my cousin! Anything he is involved with will be successful.
Well he's about spend a ton of money. There are so many structural issues.
     
     
  #8473  
Old Posted Aug 24, 2018, 1:28 AM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Cornwall Centre renovation

It appears that reno's are underway at the Cornwall Centre. A large section of ceiling has already been taken down over the space between SaskTel and food court. At first I thought it was due to water leakage, but there are continuous rolls of plastic attached along the perimeter of the stores that would roll down to protect the stores from dust and debris. Does anyone know what is the extent of the reno's?
     
     
  #8474  
Old Posted Aug 24, 2018, 2:06 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
Quote:
Originally Posted by UPP View Post
I'm fine with the new Conexus building. That stretch of green space was never used by the public anyways. If people were truly concerned about the park, they would have been up in arms when they cut down 30 mature evergreen trees on the west side of Douglas Park because of the power lines there. But none of these folks were upset by that.

In the end, don't be angry with the U of R or Conexus, be angry with the Provincial Government for not funding the U of R enough to maintain their heritage buildings.
That the space was not used by the public is a bizarre justification. By that logic I could highlight a ton of spaces "never used by the public" perfect for retail and office all along the park on Albert, College, Broad, etc.

Losing trees in a part is not great, but at least there's a justification with power lines.

And of course we should be angry at the U of R. They have mismanaged their money and become top heavy, just like the rest of the Canadian universities. And Conexus should be condemned for taking advantage of the situation and working behind the scenes to secure the deal.
Quote:
Originally Posted by Stormer View Post
I think that is unfair. You can argue that there should be no non-government office buildings even on the Park fringes, but this was a legitimate effort to get funding for the Darke Hall restoration. No one else was prepared to pay for it. Darke Hall will once again be a real gem for our City and a wonderful venue for all sorts of entertainment.

Also Conexus is a co-operative. They have no particular ideological or other connection to party in power across the lake.
The University hardly tried to fundraise at all for Darke Hall, they basically threw up their hands and said "development is only thing that will work". And as the news of the time states, the RFP made a great deal of talk about it needing to have artistic and cultural merit. Conexus has none of that.

And we need to cut the crap pretending that credit unions are these wonderful instutions without fault. Eric Dillion is as much in bed with the politicians as any other private interest. The decision to locate in the park primarily based on one thing: showing up Affinity. This is legacy project for Dillion and it doesn't serve the members at all.

Quote:
Originally Posted by J-Walker View Post
Completely agree.... It wasn't like Conexus just weaseled their way into the Park. Dark Hall was deteriorating badly and I'm sure would have been demolished within the next decade or so if it wasn't repaired. It was the UofR that put out a tender for a partner, Conexus was just the best option that stepped up to the plate. I genuinely think the leadership at Conexus thought they were doing a good deed for the community, and they've been kind of getting shit on for it since. I'd rather see a new well-designed building in the park, than the alternative, which would have been the loss of another heritage building.

The Brandt thing though, that's a little harder to justify. I don't see the logic behind that partnership. Lots of vacant space downtown that the CNIB could have moved into.
Conexus did weasel their way into the park. The RFP was released years after a handshake agreement was already made. Conexus had been talking to the university/province way before anything public was announced. And this is directly from senior Conexus employees. Additionally the $8M land purchase...er donation is below the market value of the land.

And again with the credit union hagiography. They're a private business exactly the same way that FCL is a ruthlessness competitor. It's a vanity project. If Conexus wanted to help save Regina buildings they could have written a cheque. Besides that, Conexus could have purchased a building downtown for half the cost of their new 80,000 SF building. Then they would have had tons of money to donate while not damaging the park.

Conexus deserves all of the shit they're getting. There is no justification for the special privilege they've been granted.

And Brandt is arguably more justifiable. It's land already in the possession of a private entity and they weren't part of an almost predetermined RFP. They simply worked to redevelop an existing building (albeit by vastly expanding). Ultimately both should be cancelled immediately as they're an affront to the park.

If I had to pick one, I'd pick Brandt over Conexus' abomination though.

Quote:
Originally Posted by jigglysquishy View Post
Didn't CNIB move downtown last year?
They took temporary leased space downtown in ancitipcation of the new building.
     
     
  #8475  
Old Posted Aug 24, 2018, 4:32 AM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 590
Quote:
Originally Posted by BrutallyDishonest2 View Post
That the space was not used by the public is a bizarre justification. By that logic I could highlight a ton of spaces "never used by the public" perfect for retail and office all along the park on Albert, College, Broad, etc.

Losing trees in a part is not great, but at least there's a justification with power lines.

And of course we should be angry at the U of R. They have mismanaged their money and become top heavy, just like the rest of the Canadian universities. And Conexus should be condemned for taking advantage of the situation and working behind the scenes to secure the deal.
The University hardly tried to fundraise at all for Darke Hall, they basically threw up their hands and said "development is only thing that will work". And as the news of the time states, the RFP made a great deal of talk about it needing to have artistic and cultural merit. Conexus has none of that.

And we need to cut the crap pretending that credit unions are these wonderful instutions without fault. Eric Dillion is as much in bed with the politicians as any other private interest. The decision to locate in the park primarily based on one thing: showing up Affinity. This is legacy project for Dillion and it doesn't serve the members at all.

Conexus did weasel their way into the park. The RFP was released years after a handshake agreement was already made. Conexus had been talking to the university/province way before anything public was announced. And this is directly from senior Conexus employees. Additionally the $8M land purchase...er donation is below the market value of the land.

And again with the credit union hagiography. They're a private business exactly the same way that FCL is a ruthlessness competitor. It's a vanity project. If Conexus wanted to help save Regina buildings they could have written a cheque. Besides that, Conexus could have purchased a building downtown for half the cost of their new 80,000 SF building. Then they would have had tons of money to donate while not damaging the park.

Conexus deserves all of the shit they're getting. There is no justification for the special privilege they've been granted.

And Brandt is arguably more justifiable. It's land already in the possession of a private entity and they weren't part of an almost predetermined RFP. They simply worked to redevelop an existing building (albeit by vastly expanding). Ultimately both should be cancelled immediately as they're an affront to the park.

If I had to pick one, I'd pick Brandt over Conexus' abomination though.

They took temporary leased space downtown in ancitipcation of the new building.
Well at least with this diatribe you live up to your online name.
     
     
  #8476  
Old Posted Aug 24, 2018, 8:54 AM
blacktrojan3921's Avatar
blacktrojan3921 blacktrojan3921 is offline
Regina rhymes with fun!
 
Join Date: Jun 2010
Location: Regina, SK
Posts: 903
Quote:
Originally Posted by UPP View Post
I'm fine with the new Conexus building. That stretch of green space was never used by the public anyways. If people were truly concerned about the park, they would have been up in arms when they cut down 30 mature evergreen trees on the west side of Douglas Park because of the power lines there. But none of these folks were upset by that.

In the end, don't be angry with the U of R or Conexus, be angry with the Provincial Government for not funding the U of R enough to maintain their heritage buildings.
Keep in mind that most people (especially those who vote) tend to be like this lol

https://www.youtube.com/watch?v=gcKqAhLeM-4
     
     
  #8477  
Old Posted Aug 24, 2018, 1:07 PM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
Quote:
Originally Posted by UPP View Post
Well at least with this diatribe you live up to your online name.
Thank you for refuting even a single thing.
     
     
  #8478  
Old Posted Aug 24, 2018, 1:42 PM
aberrant aberrant is offline
Registered User
 
Join Date: Nov 2007
Posts: 244
Quote:
Originally Posted by UPP View Post
Well at least with this diatribe you live up to your online name.
Seemed like a solid post to me.

U of R has serious problems. WCA has been broke for years, and is now a total disaster under the PCC. I don't see how this is anyone else's problem to fix.

The bottom line for me is that all of these developments go against the City OCP. There always seems to be allowable "exceptions," and I can't think of a single instance where the City has gotten in the way and stopped a development that didn't meet the OCP guidelines. Seems to suggest we might as well throw away the OCP for all that it gets used.

I talk to urban planners from other cities and they literally roll their eyes when I tell them about these things. As I keep saying lately, "you get the city you plan for." So if you are going to treat your plans as worthless... well then...
     
     
  #8479  
Old Posted Aug 24, 2018, 2:21 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 590
Quote:
Originally Posted by BrutallyDishonest2 View Post
Thank you for refuting even a single thing.
You make serious accusations against individuals, institutions and organizations without a single citation or shred of evidence.

Seriously... every Canadian university mismanages their money and is top heavy? That entire post is a complete joke.
     
     
  #8480  
Old Posted Aug 24, 2018, 3:11 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
BD2 is an asshole, but is correct on like 96% of the stuff he posts.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:11 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.