View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #9201  
Old Posted Aug 16, 2018, 6:15 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Quote:
Originally Posted by Bdawe View Post
Could they dump spoil into rail cars for disposal from GN Way?
They normally would have a long conveyor belt to the original entrance (i.e. GNW) where spoil is loaded onto dump trucks. That operation would - presumably - prevent finishing of the tunnel and stations with tracks, communications, etc. so long as the conveyor is operating.
If however, you move that exit point (i.e. to Arbutus for tunnel west of there), the unnecessary conveyor (east of Arbutus) could be dismantled and that part of the tunnel finished.

The issue is further complicated if its a twin bore with consecutive parallel passes. (i.e. for Canada Line the TBM entered at OV and was removed at Waterfront, and reassembled at OV for the 2nd parallel tunnel to Waterfront).
     
     
  #9202  
Old Posted Aug 17, 2018, 8:16 PM
AMTDGT AMTDGT is offline
Registered User
 
Join Date: Jul 2009
Posts: 133
Quote:
Originally Posted by M00dy View Post
I bet that can be dealt with somehow. If they start from Great Northern Way moving west towards an intermediate receiving pit at Arbutus, they could then install a second launching structure at Arbutus to continue towards UBC.

There would be a bit of a process to bore past the Arbutus receiving pit, remove sacrificial rings, install the launch structure against the in-place rings, and then continue on.

Would allow tunnel fit-out & track to progress on phase 1.
Why not just tunnel and line to the first station of Phase 2 (Mac Donald???) and pull the TBM there if there isn't the $ to go all the way. In this case you would only finish the tunnel, (lights rails, etc) to Arbutus. I'm not an expert but doing that may add 3 months to the drilling (and maybe $50million), but would not delay much the finishing of Phase 1. On the C Line they were building stations while running spoil trains through them. They would just bridge over the hole while it was waiting for the phase 2 start up

When the go ahead for phase 2 happens, the tunnelling, extraction etc would not impact the already running phase 1 section, except maybe for a weekend when they connect Phase 2 rails to the Arbutus station rails. It would also speed up the phase 2 start up and the box would eventually because MacDonald station. In reality they could even run trains to UBC while finishing the MacDonald station.

I could even imagine running a supply/spoil train from phase 2 to the Finning lands and back once an hour with little impact on service and minimal manual block control.
     
     
  #9203  
Old Posted Aug 17, 2018, 9:46 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,594
Quote:
Originally Posted by AMTDGT View Post
Why not just tunnel and line to the first station of Phase 2 (Mac Donald???) and pull the TBM there if there isn't the $ to go all the way. In this case you would only finish the tunnel, (lights rails, etc) to Arbutus. I'm not an expert but doing that may add 3 months to the drilling (and maybe $50million), but would not delay much the finishing of Phase 1. On the C Line they were building stations while running spoil trains through them. They would just bridge over the hole while it was waiting for the phase 2 start up
I seriously doubt they would only tunnel to Arbutus and then abruptly stop - for starters there would need to be space for tail track. I think we can agree that having to single track to Arbutus station would be terrible compromise until Phase 2 is open. So they'll tunnel for some distance beyond for proper train running and so there wouldn't be a disruption when they continue to Phase 2.
     
     
  #9204  
Old Posted Aug 17, 2018, 9:53 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
Quote:
Originally Posted by AMTDGT View Post
Why not just tunnel and line to the first station of Phase 2 (Mac Donald???) and pull the TBM there if there isn't the $ to go all the way. In this case you would only finish the tunnel, (lights rails, etc) to Arbutus. I'm not an expert but doing that may add 3 months to the drilling (and maybe $50million), but would not delay much the finishing of Phase 1. On the C Line they were building stations while running spoil trains through them. They would just bridge over the hole while it was waiting for the phase 2 start up

When the go ahead for phase 2 happens, the tunnelling, extraction etc would not impact the already running phase 1 section, except maybe for a weekend when they connect Phase 2 rails to the Arbutus station rails. It would also speed up the phase 2 start up and the box would eventually because MacDonald station. In reality they could even run trains to UBC while finishing the MacDonald station.

I could even imagine running a supply/spoil train from phase 2 to the Finning lands and back once an hour with little impact on service and minimal manual block control.
Could the spoil possibly be used for an infill project?
     
     
  #9205  
Old Posted Aug 17, 2018, 10:25 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,594
Quote:
Originally Posted by cganuelas1995 View Post
Could the spoil possibly be used for an infill project?
You mean like Lego bricks? I suppose it's possible they could be used for loading like they do in Richmond. It's all a question of is it as durable as the concrete bricks they use now, and the cost (just because they'd be using waste material doesn't automatically mean it would be cheaper).
     
     
  #9206  
Old Posted Aug 17, 2018, 10:31 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,659
Quote:
Originally Posted by Sheba View Post
I seriously doubt they would only tunnel to Arbutus and then abruptly stop - for starters there would need to be space for tail track. I think we can agree that having to single track to Arbutus station would be terrible compromise until Phase 2 is open. So they'll tunnel for some distance beyond for proper train running and so there wouldn't be a disruption when they continue to Phase 2.
Yeah west of Arbutus station, there should be space for a scissor crossover and tail tracks that can fit the longest train.
     
     
  #9207  
Old Posted Aug 19, 2018, 10:10 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by AMTDGT View Post
Why not just tunnel and line to the first station of Phase 2 (Mac Donald???) and pull the TBM there if there isn't the $ to go all the way. In this case you would only finish the tunnel, (lights rails, etc) to Arbutus. I'm not an expert but doing that may add 3 months to the drilling (and maybe $50million), but would not delay much the finishing of Phase 1. On the C Line they were building stations while running spoil trains through them. They would just bridge over the hole while it was waiting for the phase 2 start up

When the go ahead for phase 2 happens, the tunnelling, extraction etc would not impact the already running phase 1 section, except maybe for a weekend when they connect Phase 2 rails to the Arbutus station rails. It would also speed up the phase 2 start up and the box would eventually because MacDonald station. In reality they could even run trains to UBC while finishing the MacDonald station.

I could even imagine running a supply/spoil train from phase 2 to the Finning lands and back once an hour with little impact on service and minimal manual block control.
that's 7/10 of a mile of tracks and tunnels heading to an unbuilt station - and not earning money. perhaps they may build tunnels for a block or so west of Arbutus to lay-up a few trains between the rush-hours or overnight (so they don't need to dead-head trains from Edmonds or Falcon to start the service day, or dead-head them back again after the end of service)

the nytimes recently had an story trying to figure out why ny subways cost over $1 billion/mile to build when the rest of the world can build subways for $150 million/mile. using their estimate, this excess tunnel might cost $105 million or more. as we've seen in the past, when the bids come in & they are (not surprisingly) over the budget expected by translink, 'unneeded' parts of phase I will be chopped to get back under the budgeted amount. any non-revenue, non-safety items like this excess 7/10 mile of unfinished 'tunnels to no-where' that a passenger won't miss will be discarded.

Last edited by jsbertram; Aug 20, 2018 at 1:50 AM.
     
     
  #9208  
Old Posted Aug 19, 2018, 10:28 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Sheba View Post
I seriously doubt they would only tunnel to Arbutus and then abruptly stop - for starters there would need to be space for tail track. I think we can agree that having to single track to Arbutus station would be terrible compromise until Phase 2 is open. So they'll tunnel for some distance beyond for proper train running and so there wouldn't be a disruption when they continue to Phase 2.
i'm not clear why they would only build a single track to Arbutus, knowing that phase II is coming soon. there was no issue with building both TBM tracks to Waterfront.

Last edited by jsbertram; Aug 19, 2018 at 10:45 PM.
     
     
  #9209  
Old Posted Aug 20, 2018, 1:14 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,167
Quote:
Originally Posted by jsbertram View Post
i'm not clear why they would only build a single track to Arbutus, knowing that phase II is coming soon. there was no issue with building both TBM tracks to Waterfront.
Same reason Brighouse has only one track. Pennypinching is about short-term financial savings, not common sense.
     
     
  #9210  
Old Posted Aug 20, 2018, 1:36 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by jsbertram View Post
i'm not clear why they would only build a single track to Arbutus, knowing that phase II is coming soon. there was no issue with building both TBM tracks to Waterfront.
they wouldn't do that. I'm 99% sure they would never build a single track to Arbutus, no matter how cheap they are, they wouldn't do that.

they did that in Richmond and YVR because they knew it would 99% never be extended.

i am just wondering if it will be 1 tunnel bore, Evergreen-Extension, or 2 tunnel bore, Canada-Line.
     
     
  #9211  
Old Posted Aug 20, 2018, 1:54 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,167
Quote:
Originally Posted by VancouverOfTheFuture View Post
i am just wondering if it will be 1 tunnel bore, Evergreen-Extension, or 2 tunnel bore, Canada-Line.
Handy reference - bottom line, single bore is cheaper and less disruptive, but much harder to build a station around. So they like to stick with double bore unless there's engineering issues (e.g. Burnaby Mountain).
     
     
  #9212  
Old Posted Aug 20, 2018, 1:55 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by VancouverOfTheFuture View Post
they wouldn't do that. I'm 99% sure they would never build a single track to Arbutus, no matter how cheap they are, they wouldn't do that.

they did that in Richmond and YVR because they knew it would 99% never be extended.

i am just wondering if it will be 1 tunnel bore, Evergreen-Extension, or 2 tunnel bore, Canada-Line.
extend past YVR? next stop Parksville?

i'd be very surprised if Richmond never extends their spur further south
     
     
  #9213  
Old Posted Aug 20, 2018, 2:21 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Migrant_Coconut View Post
Handy reference - bottom line, single bore is cheaper and less disruptive, but much harder to build a station around. So they like to stick with double bore unless there's engineering issues (e.g. Burnaby Mountain).
didn't the contractor for evergreen choose single bore because it was supposed to be cheaper and faster to build?

in the end neither was true, causing the entire extension to go over budget and open about 6 months late. the builder even trucked a test train to the completed tracks east of the tunnel (because the tunnel was still being built) to try and get the project back on schedule
     
     
  #9214  
Old Posted Aug 20, 2018, 2:39 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,167
Quote:
Originally Posted by jsbertram View Post
didn't the contractor for evergreen choose single bore because it was supposed to be cheaper and faster to build?

in the end neither was true, causing the entire extension to go over budget and open about 6 months late. the builder even trucked a test train to the completed tracks east of the tunnel (because the tunnel was still being built) to try and get the project back on schedule
Could be, but I was led to believe that they chose it because Burnaby Mountain is hard granite and it would be less of a headache to only drill through it once.
     
     
  #9215  
Old Posted Aug 20, 2018, 3:45 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by jsbertram View Post
extend past YVR? next stop Parksville?

i'd be very surprised if Richmond never extends their spur further south
I would be shocked if the line got extended further south into Richmond in my lifetime. Very soon after Richmond-Brighouse it becomes a quiet suburban area. No chance in hell that will allowed to be changed with an overhead SkyTrain line running through those neighbourhoods. It'll also be a very long time until those areas get anywhere close to the density that'd be needed for that.
     
     
  #9216  
Old Posted Aug 20, 2018, 3:54 AM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 382
Quote:
Originally Posted by GlassCity View Post
I would be shocked if the line got extended further south into Richmond in my lifetime. Very soon after Richmond-Brighouse it becomes a quiet suburban area. No chance in hell that will allowed to be changed with an overhead SkyTrain line running through those neighbourhoods. It'll also be a very long time until those areas get anywhere close to the density that'd be needed for that.
I don't think I would call it a "quiet" suburban area. Even south of Brighouse No.3 road is a major arterial and has a number of different commercial businesses along the next four major blocks. Most of the homes are also mid density town homes. I don't think an extension through to Ladner, Tsawwassen and the Ferry Terminal in about 50 years time from now is that unreasonable. But anyways, we digress, this topic is about the Millennium Line rather than the Canada Line.
     
     
  #9217  
Old Posted Aug 20, 2018, 5:17 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i would personally prefer a double bore tunnel. i am a fan of centre platforms. i cant say i like how on the Canada-Line you need to go down into the station, then down under the tracks, then back up to the platform on the other side.
     
     
  #9218  
Old Posted Aug 20, 2018, 6:56 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by VancouverOfTheFuture View Post
i would personally prefer a double bore tunnel. i am a fan of centre platforms. i cant say i like how on the Canada-Line you need to go down into the station, then down under the tracks, then back up to the platform on the other side.
Granville and Burrard stations have stacked platforms because they were retrofitted in an existing tunnel, which was originally used for double-decked freights. I can understand that excuse, but the Canada Line was cheaped out. (Let’s just follow waves’ word and move on.)

Double-boring would put an extra strain on TransLink’s budget, which needs to be used on other projects, including Surrey’s glory tram . But it won’t be as dreaded as boring through Burnaby Mountain, or if the contractor is The Boring Company.
     
     
  #9219  
Old Posted Aug 20, 2018, 3:08 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,792
Quote:
Originally Posted by Firebrand View Post
...But it won’t be as dreaded as boring through Burnaby Mountain, or if the contractor is The Boring Company.
What's the deal with the Boring Company, anyhow? I get Tesla's innovation - reduce battery costs to make electric cars feasible. And SpaceX is reducing launch costs through reusability and more assembly-line like rocket manufacturing. But what technology is the Boring Company using that's supposed to revolutionize the tunneling industry?
     
     
  #9220  
Old Posted Aug 20, 2018, 5:28 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,167
Quote:
Originally Posted by aberdeen5698 View Post
What's the deal with the Boring Company, anyhow? I get Tesla's innovation - reduce battery costs to make electric cars feasible. And SpaceX is reducing launch costs through reusability and more assembly-line like rocket manufacturing. But what technology is the Boring Company using that's supposed to revolutionize the tunneling industry?
According to the FAQ on the official site:
- Smaller tunnels
- Faster/automated/more powerful electric TBMs
- Converting excavation dirt into bricks into tunnel supports

Whether any of it will actually work, only time will tell.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:32 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.