New Tweet from Tim Tierney with aerial photos of Blair, Cyrville, and Tremblay stations.
https://twitter.com/TimTierney/status/1013063853469466626



     
     
  #7422  
Old Posted Jul 1, 2018, 5:19 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
     
     
  #7423  
Old Posted Jul 1, 2018, 9:52 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,894
Quote:
Originally Posted by OCCheetos View Post
New Tweet from Tim Tierney with aerial photos of Blair, Cyrville, and Tremblay stations.
Will never understand why they didn't build Tremblay station adjacent to the actual train station. Did they forget the climate in this town?
     
     
  #7424  
Old Posted Jul 1, 2018, 10:29 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,107
Quote:
Originally Posted by Truenorth00 View Post
Will never understand why they didn't build Tremblay station adjacent to the actual train station. Did they forget the climate in this town?
http://www.ligneconfederationline.ca/media/pdf/PE_Rev7_TrainStationLink.pdf

I don't think it would have made much of a difference. If anything, the final alignment is closer to the station and requires less walking and also simplified the design of the station's entrance (requiring only one, instead of an original two: one on the VIA station side, and another on the opposite side, towards the pedestrian bridge).
     
     
  #7425  
Old Posted Jul 3, 2018, 2:37 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171

Last edited by corynv; Jul 3, 2018 at 3:40 PM. Reason: fixing link.
     
     
  #7426  
Old Posted Jul 3, 2018, 3:16 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
You accidentally put a time offset to jump to near the end of the YouTube video. Here it is from the beginning:

Video Link
     
     
  #7427  
Old Posted Jul 3, 2018, 3:41 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by roger1818 View Post
You accidentally put a time offset to jump to near the end of the YouTube video.

Oh shoot, my bad (i've gone and fixed it). Thanks for the heads up.
     
     
  #7428  
Old Posted Jul 3, 2018, 3:47 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,025
Quote:
Originally Posted by eltodesukane View Post
This sign is quite underwhelming, compared to what is possible, and compared to what I have seen elsewhere.
My car has a much higher resolution LCD Colorful Display Radio In Dash Touch Screen.
How does that LCD screen perform, to the human eye observing it, when it has direct sunlight on it?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #7429  
Old Posted Jul 3, 2018, 3:51 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,025
Quote:
Originally Posted by Truenorth00 View Post
Will never understand why they didn't build Tremblay station adjacent to the actual train station. Did they forget the climate in this town?
Yes, they did.

These are the same people, remember, who do not think that shade is a thing that needs to be designed for.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #7430  
Old Posted Jul 3, 2018, 4:48 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

Keith Egli has put up the July FEDCO update (pdf , 14 pg.) :

http://keithegli.ca/wp-content/uploads/2018/07/FEDCO-3July18_FINAL_Email-English.pdf

According to CBC and Citizen articles put up after today's FEDCO update, the August committee meeting has been cancelled, but Manconi said his department will be issuing a written memo.

http://ottawacitizen.com/news/local-news...ick-in-predicting-november-lrt-readiness

https://www.cbc.ca/news/canada/ottawa/lrt-ottawa-deadline-1.4731870

He has repeated that the rail signalling and automation safety and testing signoffs remain critical, and added that Rideau station is / has become critical.

EnJoy!
     
     
  #7431  
Old Posted Jul 3, 2018, 4:52 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,555
Rideau station becomes critical measuring stick in predicting November LRT readiness

Jon Willing, Ottawa Citizen
Updated: July 3, 2018


The City of Ottawa and OC Transpo are entering a critical period in the run-up to the launch of the Confederation Line, with the head of transportation still not making any promises about whether the $2.1-billion LRT line will make the November handover deadline.

It’s likely that under the schedule first contemplated by the city, the LRT line would have opened by now, or at some point shortly after Canada Day, if the May 24 handover happened as initially planned.

John Manconi, the city’s general manager of transportation, told council’s finance and economic development committee on Tuesday that he has seen signs of optimism lately that the city will take ownership of the 12.5-kilometre LRT system by Nov. 2, which is the revised handover date.

“It’s day by day, week by week. As we progress through the testing and commissioning of the summer months, we’ll have a better idea,” Manconi said after his presentation to the committee.

“I know everybody would like me to say it’s guaranteed we’re going to hit Nov. 2. I can’t do that. We need to carefully monitor all these things and I remind everybody that everyone on the city side and RTG (Rideau Transit Group) knows safety trumps everything, so we need to get through all those safety systems testing procedures even if we finish all the other work.”

Every day between now and Nov. 2 matters in constructing, testing and certifying the LRT system. RTG believes it will deliver the system by the new handover deadline and Manconi seems satisfied by how the contractor is prioritizing the work.

If it doesn’t look like RTG will meet the Nov. 2 handover, council should know by the start of fall.

“I know I’m not going to walk in here Nov. 1 if there is something to announce,” Manconi said outside the committee room at city hall. “Later this summer we’ll know exactly where we are and we’ll update accordingly.”

The key stations to watch are Rideau and Tunney’s Pasture, but especially Rideau.

Of course, it’s hard for anyone to track the progress of construction in the underground station at Rideau, so councillors will have to count on updates from city staff. Construction delays in the tunnel at Rideau, which is the deepest of the three underground stations, are chalked up to the June 2016 sinkhole.

The communication-based control system is also on Manconi’s watch list of key infrastructure. It’s the nerve centre of the LRT system, making sure the trains are talking to the track signals. Manconi has some reasons to be optimistic, with one train set now fully automated and in testing on the eastern stretch of track.

While one train has been brought through the tunnel and rests near Tunney’s Pasture, RTG has not yet tested the entire line, end to end.

When the city knows for sure when the LRT line will launch, residents can expect a marketing onslaught from OC Transpo.

Suburban councillors like Knoxdale-Merivale’s Keith Egli are starting to get questions from constituents about how riders will transfer between trains and buses.

Blair station is poised to be the first with an occupancy permit. When that happens, Transpo plans to shoot a video to show riders how an LRT station will work, particularly one at a major bus transfer.

There was no update on the financial negotiations between the city and RTG. Manconi said those talks continue. Councillors have learned the bus detours cost $1.9 million each month. The projected ridership increase at mid-year would have brought in $1.83 million in extra revenue.

If the finance and economic development committee scraps its August meeting to favour the summer break, council might receive the monthly update by memo, rather than receiving the progress report during a public meeting.

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news...ick-in-predicting-november-lrt-readiness
     
     
  #7432  
Old Posted Jul 4, 2018, 3:12 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:42 AM.
     
     
  #7433  
Old Posted Jul 4, 2018, 5:58 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,025
Quote:
Originally Posted by Reecemartin View Post
They can perform fine if adequate consideration is given to screen coating and panel type.
That's just the thing: OC Transpo doesn't have a very good record of considering such things. Half the old Telidon-type screens were useless on a bright day, being positioned and angled for maximum glare and minimum legibility.

The new type screens I've seen so far mostly seem to avoid such problems, but there have been one or two (forget where) that didn't seem to have as much thought put into their placement, and so user-utility suffered.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #7434  
Old Posted Jul 4, 2018, 6:27 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,107
Quote:
Originally Posted by Uhuniau View Post
That's just the thing: OC Transpo doesn't have a very good record of considering such things. Half the old Telidon-type screens were useless on a bright day, being positioned and angled for maximum glare and minimum legibility.

The new type screens I've seen so far mostly seem to avoid such problems, but there have been one or two (forget where) that didn't seem to have as much thought put into their placement, and so user-utility suffered.
I believe the displays were installed by an external contractor.
Edit: The new ones, that is.

Last edited by OCCheetos; Jul 4, 2018 at 6:37 PM.
     
     
  #7435  
Old Posted Jul 4, 2018, 9:32 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:42 AM.
     
     
  #7436  
Old Posted Jul 5, 2018, 6:05 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,400
Quote:
Originally Posted by OCCheetos View Post
I believe the displays were installed by an external contractor.
Edit: The new ones, that is.
Solotech had the contract for installation, but unlike the test screens at Greenboro that were managed by Pattison OneStop, the new screens belong to and are managed by OC. Poor location could be a legitimate oversight, but it can also be other restricting factors like access to power.

The colour screens are very recent - the trial screens at Greenboro were installed in spring 2014, over a year after the contract was signed for the LRT.
     
     
  #7437  
Old Posted Jul 5, 2018, 1:17 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,025
Quote:
Originally Posted by OCCheetos View Post
I believe the displays were installed by an external contractor.
Edit: The new ones, that is.
Just as OC Transpo doesn't pour its own concrete, sure, I guess.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #7438  
Old Posted Jul 6, 2018, 9:12 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,107
Interesting detail I noticed today.. The tracks across the Lees bridge use concrete guard rails instead of normal ones.

     
     
  #7439  
Old Posted Jul 6, 2018, 10:37 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 12:42 AM.
     
     
  #7440  
Old Posted Jul 8, 2018, 3:15 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
From Confederation Line website.






http://www.ligneconfederationline.ca/news/construction-update-181/

I get why Rideau and maybe Parliament are a little behind with the sinkholes, the flooding and the stop work orders, but what's the excuse for the above ground stations.

Even the trains. Technically, they're late. Not Bombardier late, but late. They should have been complete and all assembled months before the original May deadline for full system hand over.

Here's another from Twitter.


https://twitter.com/rail613/status/1014953962867437568
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:54 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.