HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 26, 2018, 7:14 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,814
Quote:
Originally Posted by OCCheetos View Post
That would probably be too expensive. The simplest solution is as described above: connect Belfast yard to the Via tracks and then route trains via Walkley Yard and then the Trillium Line.
Why is this too expensive? A single short connector track at Bayview is expensive? As it stands, we still need a connector to the VIA Rail line and another at Bayview and the trains will not be able operate under their own power to reach Bayview.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:03 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.