Quote:
Originally Posted by kmcamp View Post
Since we have such large grates, they should have done something like this:


https://www.planetizen.com/node/52065?amp
Except you can't really walk on those very easily.
     
     
  #7342  
Old Posted Jun 6, 2018, 7:50 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by roger1818 View Post
I took a picture of an updated route map at the Doors Open. Unfortunately the image quality is poor, but it is the best I have.

https://i.imgur.com/PCZJF0a.jpg
There seems to show a significant service reduction along Orleans Blvd in Orleans.

Currently that street is served by all-day route 134 between Renaud and Place d'Orleans, and peak route 34.

The map seems to show that the all-day route 134 is eliminated, but route 34 still shows as peak-only service.

That said, I do like the style of the new map, it appears to be clean and easy to read. The Frequent routes should be drawn with lines that are a bit thicker to make them stand out more.
     
     
  #7343  
Old Posted Jun 7, 2018, 12:48 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
1122 (the LRV that's been parked at Tunney's for a while now) has been moved, or was at least moving at some point today.

https://www.reddit.com/r/ottawa/comments/8p5s7m/otrain_testing_at_tunneys/
     
     
  #7344  
Old Posted Jun 7, 2018, 2:07 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by OCCheetos View Post
1122 (the LRV that's been parked at Tunney's for a while now) has been moved, or was at least moving at some point today.

https://www.reddit.com/r/ottawa/comments/8p5s7m/otrain_testing_at_tunneys/
Looks like it's driving pretty fast. At least faster than I used to see them running tests in the east.
     
     
  #7345  
Old Posted Jun 7, 2018, 2:19 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
I don't think operating speed has been mentioned recently, but I was at the simulator facility on Saturday during doors open and the operator who was in the LRV cab mentioned that the top operational speed of the line will be 80km/h in certain places.

I took a video from in the cab while the train was going between Campus and Tremblay station and the rough outline of the speed of the train will be something like this:

Departing Campus: 45km/h
Between Campus and Lees: 80km/h
Departing Lees: 45km/h
Across the river: 35km/h (He said there was a speed restriction across the bridge, although I don't know if that was just one of the random variables in the simulation)
The curve into Hurdman: 45km/h
Departing Hurdman: 45km/h

Wasn't able to catch the rest on video, but it's good that the trains will be able to pick up some speed on the straightaways.
     
     
  #7346  
Old Posted Jun 7, 2018, 2:36 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
I actually timed the travel in the simulation. It was 9 minutes from Tunney's to Rideau and then 6 minutes from Rideau to Hurdman; didn't watch past Hurdman. What impressed me was how fast the braking was; at many spots the train didn't even start slowing down until it was pretty much in the station.

The simulation used 18 seconds dwell time for every station; that's apparently the average expected dwell time at peak but it will vary, with it approaching 30 seconds at Lyon and Tunney's (at peak), and less than 10 seconds at stations like Cyrville and Tremblay. I asked if it would be lower off peak and they said yes but didn't have numbers.
     
     
  #7347  
Old Posted Jun 7, 2018, 3:09 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by 1overcosc View Post
The simulation used 18 seconds dwell time for every station; that's apparently the average expected dwell time at peak but it will vary, with it approaching 30 seconds at Lyon and Tunney's (at peak), and less than 10 seconds at stations like Cyrville and Tremblay. I asked if it would be lower off peak and they said yes but didn't have numbers.
Doesn't the driver indicate when to close the doors? No point waiting if no one else is waiting to get on or off if the track is clear. OTOH, if more than the normal number of people are wanting to get on or off, it is best to watt a bit longer than normal. That is one advantage of having someone on the train, though it could also be done remotely via camera.

The only reason to have a fixed dwell time for a given station is to have the train keep to a schedule, but the reality is a fixed schedule for the entire line is not really necessary. Only at the first station at each end of the line (to keep the spacing consistent) and maybe at a couple key transfer stations (especially off peak) should the schedule be fixed.

For the demo, they probably stuck to a consistent 18 seconds, to make it more interesting to watch.
     
     
  #7348  
Old Posted Jun 7, 2018, 3:14 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by roger1818 View Post
Doesn't the driver indicate when to close the doors? No point waiting if no one else is waiting to get on or off if the track is clear. OTOH, if more than the normal number of people are wanting to get on or off, it is best to watt a bit longer than normal. That is one advantage of having someone on the train, though it could also be done remotely via camera.

The only reason to have a fixed dwell time for a given station is to have the train keep to a schedule, but the reality is a fixed schedule for the entire line is not really necessary. Only at the first station at each end of the line (to keep the spacing consistent) and maybe at a couple key transfer stations (especially off peak) should the schedule be fixed.

For the demo, they probably stuck to a consistent 18 seconds, to make it more interesting to watch.
Doors open automatically, but the operator closes them manually.
When I was there the dwell time at Hurdman was 30 seconds. Fixed dwell times could be used in part to keep trains spaced apart to allow for a consistent frequency of trains.
     
     
  #7349  
Old Posted Jun 7, 2018, 3:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
Doors open automatically, but the operator closes them manually.
When I was there the dwell time at Hurdman was 30 seconds. Fixed dwell times could be used in part to keep trains spaced apart to allow for a consistent frequency of trains.
They could, but as long as each train leaves the first station of each run (Blair and Tunnies for Stage 1), the frequency of trains should remain relatively consistent. A sudden crush of people could delay a train slightly, but the trains load pretty quickly and once the train is full, the driver would close the doors even if people are still on the platform. I can't imagine a train getting more than a minute behind "schedule" (barring some type of emergency) and even that would be unusual.
     
     
  #7350  
Old Posted Jun 7, 2018, 4:42 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by 1overcosc View Post
What impressed me was how fast the braking was; at many spots the train didn't even start slowing down until it was pretty much in the station.
I noticed that too.
     
     
  #7351  
Old Posted Jun 7, 2018, 4:49 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by OCCheetos View Post
Doors open automatically, but the operator closes them manually.
When I was there the dwell time at Hurdman was 30 seconds. Fixed dwell times could be used in part to keep trains spaced apart to allow for a consistent frequency of trains.
Interesting! When I was watching it was a fixed 18s at every station I saw (which was Tunney's through Hurdman, I left just before it arrived at Tremblay). Changed settings throughout the day perhaps?
     
     
  #7352  
Old Posted Jun 7, 2018, 4:51 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by roger1818 View Post
They could, but as long as each train leaves the first station of each run (Blair and Tunnies for Stage 1), the frequency of trains should remain relatively consistent. A sudden crush of people could delay a train slightly, but the trains load pretty quickly and once the train is full, the driver would close the doors even if people are still on the platform. I can't imagine a train getting more than a minute behind "schedule" (barring some type of emergency) and even that would be unusual.
I imagine the doors make some sort of warning sound telling people they're about to close.

In other cities people trying to jam the doors open when they're closing is a problem. Even in high frequencies; people do this on the Yonge subway in Toronto all the time even though the frequency is never worse than 4 minutes.
     
     
  #7353  
Old Posted Jun 7, 2018, 5:22 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by 1overcosc View Post
I imagine the doors make some sort of warning sound telling people they're about to close.
I would imagine so. Every system I have been on does that.

Quote:
In other cities people trying to jam the doors open when they're closing is a problem. Even in high frequencies; people do this on the Yonge subway in Toronto all the time even though the frequency is never worse than 4 minutes.
True. There isn't much you can do about that though, other than keep trying while announcing that (in both languages) that there will be another train in 3 minutes.
     
     
  #7354  
Old Posted Jun 10, 2018, 3:53 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by J.OT13 View Post
Good Day.

..... also a 2018 Q1 accomplishments and forecast summary memo to council May 10 (7 pg.) :

http://keithegli.ca/wp-content/uploads/2...tion-Line-Q1-2018-Memo._FINAL_EN-002.pdf

EnJoy.
     
     
  #7355  
Old Posted Jun 10, 2018, 6:40 PM
harls's Avatar
harls harls is online now
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,456
Bayview Station - 2 june 2018

Snapped a few pics last week..















     
     
  #7356  
Old Posted Jun 11, 2018, 3:19 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,654
Quote:
Love this shot! Can't wait until things are built up along the LRT at Lebreton. Gonna be such a cool neighbourhood! (someday)
     
     
  #7357  
Old Posted Jun 11, 2018, 8:34 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
That bik— er, multi-use underpass at Bayview is a death trap.
     
     
  #7358  
Old Posted Jun 12, 2018, 1:46 AM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
Quote:
Originally Posted by Uhuniau View Post
That bik— er, multi-use underpass at Bayview is a death trap.
Everything about bayview right now is garbage for bikes, and transfers. Hope they learn some lessons from it for stations during phase 2
     
     
  #7359  
Old Posted Jun 12, 2018, 12:33 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
I think Bayview and uOttawa where the entrances are dependent on busy shared pathways are really poorly designed. Add to the fact that the pathways have relatively steep grades and curving sightlines, there are accidents just waiting to happen.

There should have been a wider segregated use tunnel at Bayview as it is the only way to get to the westbound platform from the street. The way it is now, people have to cross oncoming traffic twice to get from the sidewalk to the entrance on the other side.

It also boggles me that at uOttawa there isn't another way to access the eastbound platform other than through that narrow tunnel already overused to access the Corktown Bridge. How hard is it to have included another entrance in the middle of the station? Pimisi on the other hand has elaborate below track entrances/exits to the aqueduct and some alleyway on the other side.

Last edited by Kitchissippi; Jun 12, 2018 at 3:57 PM.
     
     
  #7360  
Old Posted Jun 12, 2018, 3:37 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by silvergate View Post
Everything about bayview right now is garbage for bikes, and transfers. Hope they learn some lessons from it for stations during phase 2
It's not biker safety I am getting at about Bayview; it's the jerk-as cyclists who I see nearly running people down - either others, or me - almost every time I have the misfortune of having to go through that damn thing.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:44 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.