HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #1421  
Old Posted Mar 31, 2018, 3:29 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,850
Low cost transit? LOL

If these suburbs (Clarence-Rockland, Russell Township, Kemptville, Carleton Place...) want to have a local bus service, good on them, but OC Transpo should be the only transit agency allowed to cross the borders to provide commuter transit to the City. And for that, these municipalities should pay x amount of money to OC every year and/or charge a higher fare/monthly pass than that of those who live within the Ottawa city limits.
Reply With Quote
     
     
  #1422  
Old Posted Mar 31, 2018, 12:37 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,846
It isn't low cost for people in Russel. A transit pass is $250, compared to $116 across the street in Ottawa. The alternative is they drive to a park and ride and pay cash, which is still cheaper than buying a Russel pass and costs OCTranspo a lot more.
Reply With Quote
     
     
  #1423  
Old Posted Mar 31, 2018, 7:11 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Here is a background report.
http://www.russell.ca/UserFiles/Servers/...nsportation/FinalBackgroundReport_V2.pdf

Russell has 70-75% fare recovery right now, which is apparently the highest in Ontario
Reply With Quote
     
     
  #1424  
Old Posted Apr 1, 2018, 4:24 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by waterloowarrior View Post
Here is a background report.
http://www.russell.ca/UserFiles/Servers/...nsportation/FinalBackgroundReport_V2.pdf

Russell has 70-75% fare recovery right now, which is apparently the highest in Ontario
Doesn't surprise me.. it's a small scale service (only a few trips a day) that is able to charge a high amount ($250 a month) because it's competing against downtown parking costs. A pretty lucky combination from a fiscal point of ivew.
Reply With Quote
     
     
  #1425  
Old Posted Apr 2, 2018, 4:58 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
This is going to get particularly absurd when Stage 2 opens in Orleans and Rockland transit practically sets up a hub in Orleans, if they don't do one at Blair. If you're an Ottawa resident, you'll be paying more in taxes to give these guys seats while you stand.
You do realize we are talking about Russell transit not Rockland transit? A transfer point east of St. Laurent doesn't make any sense for busses from Russell township. As for Rockland transit, they may not get such a good deal if transfers are being made at Trim Rd.

While $8 per passenger per month might be a bit under priced (especially since the transit agency is saving money from not having to drive downtown), it doesn't cost OC Transpo all that much to provide LRT transport from St. Laurent, Tremblay, or Hurdman to downtown (it's certainly a lot cheaper than providing bus transfers or park and ride lots). While the city certainly doesn't want to encourage people to move outside of city limits, they also don't want those who do to drive and contribute to congestion. Even getting those rural buses off of city streets is of benifit to the city, so it's worthwhile cooperating with the rural transit services.
Reply With Quote
     
     
  #1426  
Old Posted Apr 2, 2018, 5:15 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
If these suburbs (Clarence-Rockland, Russell Township, Kemptville, Carleton Place...) want to have a local bus service, good on them, but OC Transpo should be the only transit agency allowed to cross the borders to provide commuter transit to the City.
I am not aware of any city in Canada that prohibits neighboring transit services from crossing the border into their city or even has the right to do so.
Reply With Quote
     
     
  #1427  
Old Posted Apr 2, 2018, 5:24 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by acottawa View Post
It isn't low cost for people in Russel. A transit pass is $250, compared to $116 across the street in Ottawa. The alternative is they drive to a park and ride and pay cash, which is still cheaper than buying a Russel pass and costs OCTranspo a lot more.
And FYI, Rockland charges $243 for an Adult monthly pass, which is similar to Russel.
Reply With Quote
     
     
  #1428  
Old Posted Apr 3, 2018, 8:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,850
Quote:
Originally Posted by roger1818 View Post
I am not aware of any city in Canada that prohibits neighboring transit services from crossing the border into their city or even has the right to do so.
It's something Ottawa would have to negotiate with the suburban communities around us.

I would go as far as proposing a TransLink type transit operator that runds the entire region's public transport network (including Gatineau) but I would be afraid that transit planning would become even more suburban-centric than it already is.
Reply With Quote
     
     
  #1429  
Old Posted Apr 3, 2018, 8:47 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
It's something Ottawa would have to negotiate with the suburban communities around us.
Given that OC Transpo is heavily unionized, and is thus much more expensive to operate than the private operators the rural communities use, the only way this would happen is if the City was willing to offer the service at a significant loss (a cost to Ottawa tax payers).

Before amalgamation, Goulbourn Township did contract express bus service from OC Transpo, but the only way they could make this affordable was by agreeing to let OC Transpo pick up passengers in Kanata before going downtown (and dropping them off on the way back). Local service within Stittsville and to Kanata was contracted to an independent company as OC Transpo couldn't offer a price competitive option. After amalgamation, tried to offer local service to Stittsville for a short period, but it was later dropped as being too expensive. Only recently has it been brought back now that Stittsville has grown to have a population of 33 thousand (2017).
Reply With Quote
     
     
  #1430  
Old Posted Apr 21, 2018, 6:20 PM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
For those more familiar with the Ottawa Region than me, does Gatineau's plans involve any of the corridors Moose wants to use?

 http://ottawacitizen.com/news/local-news...neau-lrt-city-to-ask-quebec-for-funding/
Reply With Quote
     
     
  #1431  
Old Posted Apr 21, 2018, 6:45 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Allandale25 View Post
For those more familiar with the Ottawa Region than me, does Gatineau's plans involve any of the corridors Moose wants to use?

 http://ottawacitizen.com/news/local-news...neau-lrt-city-to-ask-quebec-for-funding/
No. They're planning to build a new rail corridor towards Aylmer. There wasn't ever anything there that MOOSE was interested in.
(And by rail corridor, I mean that it'll probably be like a streetcar with rails in a road. Yet to be determined for sure.)
Reply With Quote
     
     
  #1432  
Old Posted Apr 21, 2018, 10:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
No. They're planning to build a new rail corridor towards Aylmer. There wasn't ever anything there that MOOSE was interested in.
(And by rail corridor, I mean that it'll probably be like a streetcar with rails in a road. Yet to be determined for sure.)
Agreed, though I susspect they will use the abandoned rail corridor along the river between Rue Belleau and Terrasses De La Chaudière.
Reply With Quote
     
     
  #1433  
Old Posted Apr 22, 2018, 1:51 AM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
^ Thanks
Reply With Quote
     
     
  #1434  
Old Posted Apr 22, 2018, 11:00 PM
Charles5 Charles5 is offline
Registered User
 
Join Date: Aug 2017
Posts: 238
The image linked here is from a study done about a year ago. It's one of several options proposed, and I don't believe they have completely finalized the plan, but option B1 seems to be the preferred solution at the moment (just from gossip I've heard, nothing official). However, currently it seems it would be without the final segment on the east end which crosses the bridge into Ottawa. Rather they seem to be talking about ending it at the Museum of History which is just at the North end of the Bridge.

Information on the complete study and all the scenarios considered can be found here.

A conceptual drawing from a few years ago is here, showing the train at the intersection of St-Joseph and Alexandre-Taché, going on the North side of the UQO (Scenario B vice B1), but it's just a concept drawing from a while back so don't read anything into it.

Last edited by Charles5; Apr 22, 2018 at 11:16 PM.
Reply With Quote
     
     
  #1435  
Old Posted Apr 23, 2018, 3:41 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Charles5 View Post
The image linked here is from a study done about a year ago. It's one of several options proposed, and I don't believe they have completely finalized the plan, but option B1 seems to be the preferred solution at the moment (just from gossip I've heard, nothing official). However, currently it seems it would be without the final segment on the east end which crosses the bridge into Ottawa. Rather they seem to be talking about ending it at the Museum of History which is just at the North end of the Bridge.

Information on the complete study and all the scenarios considered can be found here.

A conceptual drawing from a few years ago is here, showing the train at the intersection of St-Joseph and Alexandre-Taché, going on the North side of the UQO (Scenario B vice B1), but it's just a concept drawing from a while back so don't read anything into it.
Thanks for the links. I thought I had seen a study before. I have followed up in the Ottawa Gatineau O-Train Expansion thread.
Reply With Quote
     
     
  #1436  
Old Posted Apr 30, 2018, 2:30 PM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
Today is the deadline for the City of Ottawa to respond to the CTA. Have they already responded? Apologies if I missed it.

https://ottawa.ctvnews.ca/cta-orders-cit...ridge-train-ready-by-next-year-1.3807667

Quote:
The City now has until April 30, 2018 to either explain how it will make the Ottawa River Line and the Prince of Wales Bridge train-ready in 12 months or begin and complete the process of discontinuing the line, which involves trying to sell it and then offering it to the government if no one buys it.
Reply With Quote
     
     
  #1437  
Old Posted Apr 30, 2018, 2:44 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Allandale25 View Post
Today is the deadline for the City of Ottawa to respond to the CTA. Have they already responded? Apologies if I missed it.

https://ottawa.ctvnews.ca/cta-orders-cit...ridge-train-ready-by-next-year-1.3807667
It was posted in the Prince of Wales thread, but the deadline was extended pending the result of the city's federal appeal.

http://www.cbc.ca/news/canada/ottawa/ottawa-prince-of-wales-bridge-1.4637878?cmp=rss

Last edited by OCCheetos; Apr 30, 2018 at 2:49 PM. Reason: fixed link
Reply With Quote
     
     
  #1438  
Old Posted Apr 30, 2018, 3:22 PM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
Quote:
Originally Posted by OCCheetos View Post
It was posted in the Prince of Wales thread, but the deadline was extended pending the result of the city's federal appeal.

http://www.cbc.ca/news/canada/ottawa/ottawa-prince-of-wales-bridge-1.4637878?cmp=rss
Thanks.
Reply With Quote
     
     
  #1439  
Old Posted May 10, 2018, 4:56 PM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
I was tempted to make a new thread for the following, but decided against it as this thread should cover all aspects of rural commuter rail, and not just the MOOSE plan.

----------

Here's an idea: Perhaps the future of commuter rail in the region should be done through VIA Rail.

We know that VIA is modernizing the fleet and planning high-frequency rail in the Quebec-Windsor Corridor, but perhaps a joint vision from both sides of the river can come together with the Feds to provide a streamlined transprovincial solution to the eventual question of commuter rail in the region.

Just like how the GO Train is a thing in the GTA, a VIA subsidiary should be created for the National Capital Region. VIA already has either ownership or permission from CN and CP to run on the tracks. Other rail ROW is mostly owned by the city.

It would be nearly identical to the MOOSE plan, only operated by a VIA subsidiary and in partnership with the two provinces and cities in question. The rail is still there for a majority of the proposed lines, meaning it shouldn't take terribly long for a pilot project to be up and running.

While lines to Arnprior and Wakefield would be under study/construction, a pilot project could be implemented between Smith's Falls and the Tremblay station, and Casselman and the Tremblay Station. Alternatively, a third line could be implemented that extends as far as Buckingham, QC that terminates at Bayview.

If these pilot projects succeed, then we could see proper investment in double-tracking or even triple-tracking the main "spine" of the Trillium line between 'Mooney's Bay Station' and Bayview, similar to what the final MOOSE plan would propose. This way, the whole region gets a service which helps lower GHG emissions, reduces traffic, and provides a smooth and seamless service between two provinces. This also could help promote tourism and development in communities outside of Ottawa, which we are already seeing but in a poorly implemented way.

The point would be true commuter rail, with few stops and only at core employment, education, and transfer junctions in the cities proper. The infrastructure is there, VIA is going on a "spree," and we currently have a government that could very well jump at the showcasing opportunity and vote-buying while also claiming to look good for the environment and jobs.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #1440  
Old Posted May 10, 2018, 5:12 PM
Horus's Avatar
Horus Horus is offline
I ask because I Gatineau
 
Join Date: Jul 2013
Location: Aylmer (by way of GTA)
Posts: 1,214
Taking the land development revenues out of the MOOSE model would make a similar rail network purely dependent on ridership revenue. I'm not sure how that would be feasible in this area as there are not any large population centres near Ottawa that could or should be reasonably served by commuter rail.

I had posted this some time ago in this thread comparing the proposed MOOSE-serviced centres to some of those served by GO.

Quote:
Originally Posted by Horus View Post
Just for fun - populations of these centres (mostly from 2011 census data)
MOOSE routes
  • Wakefield, QC: 2,000 residents (La Peche municipality 7,619)
  • Arnprior, ON: 10,500
  • Montebello, QC: 978 (Papineau MRC 22,541)
  • Bristol, QC: 1,128 (Pontiac MRC 14,358)
  • Smiths Falls, ON: 8,978
  • Alexandria, ON: 10,251

GO to/from Toronto:
  • Richmond Hill: 185,540
  • Lincolnville: 37.628 (whitchurch-stouffville)
  • Milton: 84,362
  • Oshawa: 161,487 (+Whitby 122,022 + Pickering 88,721 + Ajax 109,600)
  • Hamilton: 519,950 (+ Burlington 175,780)
  • Allandale Waterfront: 128,430
  • Kitchener: 219,153 (+Waterloo 98,780)

I honestly do not see how MOOSE can have any level of justifiable ridership numbers. Only 2 of those places listed (Wakefield, Montebello) have any tourism appeal as well.

Last edited by Horus; May 10, 2018 at 6:24 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.