Quote:
Originally Posted by Metro-One
Always nice to hear some good news.
If this is ideally to open 3 hers after phase one that would essentially mean a continuos construction of the line?
Will be interesting to see where the line transitions from below grade to above grade.
|
I think they should rough in the entirety of the tunnel and the platforms of the stations to University Boulevard, but complete the line to Arbutus. That way, when the time comes, they can lay in the tracks and finish the stations from Arbutus to UBC.