HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #6641  
Old Posted Mar 27, 2018, 6:01 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
The outdoor sculpture at Bayview Station arrived on the north side of the site on Monday, all wrapped up in plastic. Jeff Leiper mentioned on twitter that it will also be a bench. Here's how it was described in the announcement:
Quote:
Cascades by Toronto artist Pierre Poussin, celebrates Chaudière Falls as an an important spiritual, cultural and trading hub for indigenous peoples.
http://www.cbc.ca/news/canada/ottawa/lrt-ottawa-confederation-line-1.4220157
     
     
  #6642  
Old Posted Mar 27, 2018, 6:19 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by roger1818 View Post
Upper middle class who work in the private sector. That is a large portion of the western suburbs.
I think you're right that that is the core "Harper Yes, Ford No" demographic. I'm not sure that demographic is that numerous outside of Kanata.


Quote:
Originally Posted by 1overcosc View Post
Willing to vote for Harper in 2011 and not willing to vote for Ford in 2018 is actually probably your typical Ottawan.
Ford is polling in the high 40s (unclear that will last though). At that polling level, a lot of Ottawans could be expected to vote that way.

Ford's core demographic is people who make too much to benefit from the various means tested programs Wynne has announced but are not affluent enough that they don't notice their bills. I think that is a lot of people in the Ottawa suburbs.
     
     
  #6643  
Old Posted Mar 27, 2018, 7:20 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Quote:
Originally Posted by McC View Post
The outdoor sculpture at Bayview Station arrived on the north side of the site on Monday, all wrapped up in plastic. Jeff Leiper mentioned on twitter that it will also be a bench. Here's how it was described in the announcement:

http://www.cbc.ca/news/canada/ottawa/lrt-ottawa-confederation-line-1.4220157
Cascades?


http://www.pierrepoussin.com/cascades-2018
     
     
  #6644  
Old Posted Mar 27, 2018, 7:26 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: SSP Graveyard
Posts: 72,949
Quote:
Originally Posted by acottawa View Post
I think you're right that that is the core "Harper Yes, Ford No" demographic. I'm not sure that demographic is that numerous outside of Kanata.




Ford is polling in the high 40s (unclear that will last though). At that polling level, a lot of Ottawans could be expected to vote that way.

Ford's core demographic is people who make too much to benefit from the various means tested programs Wynne has announced but are not affluent enough that they don't notice their bills. I think that is a lot of people in the Ottawa suburbs.
How did Mike Harris do in Ottawa? Ford seems to be that type of Tory leader, so Harris' showing might be a good indicator.
__________________
Gone... but never forgotten.
     
     
  #6645  
Old Posted Mar 27, 2018, 7:48 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Quote:
Originally Posted by Acajack View Post
How did Mike Harris do in Ottawa? Ford seems to be that type of Tory leader, so Harris' showing might be a good indicator.
Highway 416 would an example of an infrastructure project that was partly built during that timeframe. They definitely look for savings and such but overall got it done.

Election wise:

https://en.wikipedia.org/wiki/Ontario_general_election,_1995

PC's actually did better in Ottawa in 1999:

https://en.wikipedia.org/wiki/Ontario_general_election,_1999
     
     
  #6646  
Old Posted Mar 27, 2018, 8:49 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by acottawa View Post
I'm not sure I follow. Bids haven't even been submitted and the contract isn't scheduled to be awarded until 4-6 months after the election.
Cutting it pretty close. And who's to say that the three proponents wouldn't bring the City to court if it was canceled. They're not going to kill a project this close to realization (and yes, I know Harris killed a project in TO that was under construction, but nowadays, it would be political suicide).

Conceptual projects like the Civic however, will be first on the chopping block.
     
     
  #6647  
Old Posted Mar 27, 2018, 8:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by zzptichka View Post
Two of them? One would have been interesting, but two is too much.
     
     
  #6648  
Old Posted Mar 27, 2018, 9:28 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,698
It's kind of like, what we wanted was this:



but got this:



     
     
  #6649  
Old Posted Mar 27, 2018, 9:59 PM
Vixx Vixx is offline
Registered User
 
Join Date: Sep 2017
Location: Wild Rose Country/Worst Case Ontario
Posts: 398
Quote:
Originally Posted by 1overcosc View Post
My main worry is that Ottawa will find itself politically useless in this election cycle.

Ford heralds a populist shift in PC tone that will resonate well with blue collar workers and the low income which could give them the GTA breakthrough needed to win the election.. But Ottawa doesn't really have those demographics and the unpopularity of Ford among the middle class white collar groups that dominate Ottawa will lead to poor PC potential here. The NDP have limited traction here. So all 3 parties may well write Ottawa off as a Liberal hold. I could easily see a scenario where the Liberals continue to hold most of Ottawa even if they fall to 3rd place in the legislature. Thats not good for us. We just have to look back to McGuinty to see how neglected Ottawa can be when we're not politically important.
Ottawa has its obvious Liberal strongholds but I think the PC's will garner more seats then people think. People all across the province despise Wynne like no one else and I think the June results will show, even in Ottawa.

With that said I do believe that Ottawa in general will be sort of 'forgotten' once the PC's win (quite frankly it would be if any other party forms government, even the Liberals) just because the mandate will be to reverse a ton of god awful Liberal policies implemented over the years. As well as focusing on GTA issues for obvious reasons. We'll likely be on the back burner for awhile.
     
     
  #6650  
Old Posted Mar 27, 2018, 10:03 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by J.OT13 View Post
Cutting it pretty close. And who's to say that the three proponents wouldn't bring the City to court if it was canceled. They're not going to kill a project this close to realization (and yes, I know Harris killed a project in TO that was under construction, but nowadays, it would be political suicide).

Conceptual projects like the Civic however, will be first on the chopping block.
I am not sure an RFP is a legally binding contract.

Conceptual projects are pretty easy to keep, the spending will not occur for years.

I think a lot it depends on where the bids come in.
     
     
  #6651  
Old Posted Mar 27, 2018, 10:22 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by acottawa View Post
Ford's core demographic is people who make too much to benefit from the various means tested programs Wynne has announced but are not affluent enough that they don't notice their bills. I think that is a lot of people in the Ottawa suburbs.
It's actually lower than that.. it's the working poor that Ford is popular among, which is new territory for the PCs.

As for Phase 2, the federal and municipal contributions are obviously secure, so the worst thing that could happen is losing a third of it.
     
     
  #6652  
Old Posted Mar 27, 2018, 11:24 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by 1overcosc View Post
It's actually lower than that.. it's the working poor that Ford is popular among, which is new territory for the PCs.
I think that is the mistake the Liberals have made (and is causing them to mistarget their efforts). His ward in Etobicoke is a pretty typical middle class ward. In the mayor election, he won Etobicoke and Scarborough wards of various demographics.

I think part of the problem is that Liberal elites are so convinced that they are "middle class" (such as the "middle class" tax cut that only applied to those earning more than double the median income) that they think people that are actually in the middle are poor.
     
     
  #6653  
Old Posted Mar 28, 2018, 12:45 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by acottawa View Post
I am not sure an RFP is a legally binding contract.

Conceptual projects are pretty easy to keep, the spending will not occur for years.

I think a lot it depends on where the bids come in.
RFPs are legal contracts, but they usually have clauses allowing the client to cancel the procurement process. Often there are honorariums given in the case it is cancelled to compensate the bidders for their costs...usually that's included in the RFP language. I'm not sure about what is the case for stage 2 lrt.

Look at BC - just cancelled last year the Massey Tunnel Replacement project after ~1 year of bidding & all bids being submitted.
     
     
  #6654  
Old Posted Mar 28, 2018, 12:54 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by M00dy View Post
Look at BC - just cancelled last year the Massey Tunnel Replacement project after ~1 year of bidding & all bids being submitted.
In that case, it was very clear in the NDP's platform that they would cancel the project. Also, I am not sure what the funding model was for it, but I am quite sure it was a provincial project so they had full control of it.
     
     
  #6655  
Old Posted Mar 28, 2018, 1:19 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by roger1818 View Post
In that case, it was very clear in the NDP's platform that they would cancel the project. Also, I am not sure what the funding model was for it, but I am quite sure it was a provincial project so they had full control of it.
Ehhh they never came out & 100% said it before the election, but reading between the lines it was pretty clear what their intention was. I believe the statement was "we would tend to defer to the mayor's council judgement" and the mayor's council was not in support.

Edit: By that I mean cancelling the project wasn't part of the official party platform they had published before the election.

Doesn't change the fact it was an ongoing RFP process & cancelled on political basis. I think the payouts to each bidder were on the order of ~$2m
     
     
  #6656  
Old Posted Mar 28, 2018, 1:29 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
This is for the Hurontario LRT, but I assume other RFPs use similar boilerplate language. Emphasis added.

10.1 General Rights of the Sponsors
(1) The Sponsors may, in their sole discretion:
(a) reject any or all of the Proposals;
(b) reject the Key Individuals proposed in a Proposal and, if not satisfactorily substituted, reject
the Proposal;
(c) accept any Proposal;
(d) if only one Proposal is received, elect to accept or reject it or enter into negotiations with the
Proponent;
(e) elect to discontinue the RFP Process at any time before the end of the RFP Process, including
after the identification of a Preferred Proponent but before Commercial Close;

(f) alter the Timetable, the RFP Process or any other aspect of this RFP, which for greater certainty,
includes the right to schedule Financial Close on the day after Commercial Close;
and
(g) cancel this RFP Process and subsequently advertise or call for new submissions for the same
or different subject matter of these RFP Documents with the same or different participants.
     
     
  #6657  
Old Posted Mar 29, 2018, 3:39 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Looks like the gantry crane on Queen at Kent is gone. Could have sworn it was there Tuesday.

EDIT: Nope, gantry crane is still there. Just had a bad angle from the office.

In other news, another accident. Refreshingly, it was ON Rideau Street, not under.

http://ottawasun.com/news/local-news/two...wcm/84606633-d2e0-4ba8-a963-1e892ec4019c

EDIT 2: Nope, underground.

Last edited by J.OT13; Mar 30, 2018 at 12:19 PM.
     
     
  #6658  
Old Posted Mar 30, 2018, 2:56 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,689
Two men suffer minor injuries after collision at LRT construction site

Devyn Barri, Ottawa Citizen
Published on: March 29, 2018 | Last Updated: March 29, 2018 5:14 PM EDT


Work on a section of the Rideau Street section of the LRT project has been put on hold after two workers were hospitalized with minor injuries after an incident Wednesday night.

Police said the workers were injured when two transportation devices crashed shortly after 11 p.m.

The injured workers were last reported to be in stable condition.

Provincial Ministry of Labour spokeswoman Janet Deline said in an email investigators had issued one order to ensure the scene is not disturbed and another order for supervisors to provide relevant documentation.

Two orders were also issued to ensure that workers on the site have access to two-way radios at all times.

A stop work order remained in place Thursday morning.

The ministry’s investigation is continuing.

http://ottawacitizen.com/news/local-news...after-collision-at-lrt-construction-site
     
     
  #6659  
Old Posted Mar 30, 2018, 4:58 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Watson just tweeted that 31 of the trains are now completed with only 3 more to be assembled.

So it seems that train assembly was on track to meet the original handover date. It was just the tunnel that's late.
     
     
  #6660  
Old Posted Mar 30, 2018, 5:34 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by 1overcosc View Post
Watson just tweeted that 31 of the trains are now completed with only 3 more to be assembled.

So it seems that train assembly was on track to meet the original handover date. It was just the tunnel that's late.
Good Day.

Think they'll pause a bit to finish building more storage space (a month or two) or just keep trucking onto the Phase 2's 38 LRVs ?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.