Quote:
Originally Posted by roger1818
Agreed, but with the proposed routing, the tunnel will most likely only be used for travel east of Montreal. At some point they will need to find a better approach into Montreal (be it Central Station or a new station), but I am not sure that it be in the HFR proposal. One option for using the tunnel from the west would be to combine efforts with the REM and use their route from Dorval to Central Station, but it still isn't the most direct of routes.
That is unless they decide to not use Central Station but instead build their own station somewhere more convenient. The two things that make me wonder this are:
1. The following from page 13 of VIA Rail's 2016 – 2020 corporate plan
2. The article How VIA Rail Torpedoed its Own “High-Frequency Rail” Project and Montreal’s chance for Regional Rail.
Maybe, just maybe VIA has decided to not use Central Station anymore. They could build a new station near Gare Lucien-L'Allier, but that wouldn't be a good location for trains to the east. Another option would be to build a new, inter-modal station north of Mount Royal. One that they own but has access to the REM for those going downtown (use of the REM could be included in your ticket).
|
Good Day.
The biggest point is the liability of not having ownership of the access to the station nor the station proper. After that, yes, the Phase 1 of HFR is strictly west - Mtl, Ott, Tor - which does not use the tunnel.
BUT - Catbus' point, in my read of his blog article, which I completely agree with, is that the loss of the tunnel dictates a complete abandonment of eastward options, for ownership of your own resources, and thus primacy of operation, unless VIA builds a well-located new station, with immediate access to the central core, and a viable new eastward access, if not a westward one as well.
As almost a side bar,the Caisse is taking over with virtually no comment, let alone opposition, a public good - the tunnel. Wow!
So any HFR (or HSR, we won't go there) proposal will now -have- to include a detailed analysis of a new station location and west and east accesses, which I can easily predict will be a very long, drawn-out, highly contentious process, which could easily foreclose the Quebec City growth, if not be the death of the whole thing.
Which is possibly why TransportCanada and M.Garneau have split VIA's trains and HFR into two separate processes.