Quote:
Originally Posted by acottawa
So you agree there is nothing to be gained from any of these complaints?
At worst the city screwed up the paperwork.
|
If the city were to actually abandon the PoW bridge, I'd expect MOOSE would scramble to obtain the funding necessary to buy the bridge. Whether they'd be able to do that, I don't know, but I can't see why they wouldn't try.
Basically, it forces the city to either keep it (and acknowledge that they are keeping it) or risk losing control of the bridge.
From a legal perspective, it would set a precedent. If the city is allowed to
actually discontinue a federal railway just by "screwing up" some paperwork, then that would basically make Division V of the Canadian Transportation act useless.
Quote:
|
Yes, that has been the case for 20 years - the track was overgrown long before it was removed. Nobody that owns an actual railway company wants to use the route. If there is ever funding for a trillium line extension then track can be built between the station and bridge.
|
The Canadian Transportation Act doesn't care how long it's been. The city only owns the track up to where it reaches the Quebec shoreline which means that anything beyond is no longer a "federal railway".
As you said earlier, do you expect the city to operate a 400m long railway that isn't connected to anything meaningful?