Quote:
Originally Posted by 1487
well that pretty much tells you they dont expect a new building to be ready before that point.
|
I had that same initial reaction, but a few things to consider
1.) CITC will serve a different purpose. They may not want to throw an audit group in the middle of a floor of developers just because there was space. Also how many new hires, consultants, etc. do they plan with this new building. I forget if they've ever mentioned those figures.
2.) They still have 290,000 sq ft of space in other buildings. I am not sure of the lease terms in those buildings.
3.) 1717 Arch is an optimal building for Comcast to keep "spare" space considering how close it is to their two buildings