Of course, that diagram was produced as ‘marketing hype’; the actual tunnel is likely deeper than the revised depths presented.
Take a look at the west portal of that diagram; it is on the surface, with the tunnel entering the face of the cliff. If you had walked over to the West Portal to view it while it was being dug you might have noticed that the tunnel invert, at Commissioner, is probably about 10 metres below grade. It turned out that the Federal Government would not allow the City to close Commissioner, since it is the sole access to their heating plant; but the LRT line had to be separated from road crossings – thus the need to go under Commissioner. So, the tunnel might not be as deep as once planned, but it is certainly deeper than what we were led to believe by the marketing.
Unfortunately, the City has not seen fit to publish much information about the technical aspects of the tunnel – including its profile – so the actual depths along the tunnel are speculation.
It wasn’t the public utilities that forced the original plan to be so deep; it was the building foundations (and underground parking structures). Recall that the plan was to use a “Cross-Country” routing which did not follow the street grid. The “Cross-Country” alignment was suggested by the UK tunneling firm Halcrow, when they were here as consultants for the project, in response to the City’s desire to include a stop near the By Ward Market. Since, historically, the tunnel had been placed under Albert & Slater, Halcrow reasoned that to make a detour to the Market would require an unrestrained path. By taking the tunnel deeper, it could be bored in any direction, without restriction. Also recall that the plan at that time was to bore the tunnel tubes using two TBMs; and it doesn’t make much difference to a TBM boring through rock whether it is 10 metres underground or 50 metres.
In order to save money and keep the cost within the $1.8B estimate, the project was Value Engineered. The new, current, alignment moved the tunnel north so that it could follow the street grid and avoid passing under deep building foundations. As pointed out above by kmcamp, this is the reason that the tunnel could be dug less deep; and, thus, save money on the station costs. Remember, the stations are simply underground ‘buildings’ that need to be built as high as the tunnel is deep. The pitch was that a 5-story station is less expensive to build than a 13-story one. Despite the savings found, the cost of the project was adjusted up to $2.14B; but the Federal and Provincial Governments still kept their funding caps at $600M each – which was ⅓ of the original estimate of $1.8B. (I assume that the City has learned that it should never submit a Class ‘D’ estimate when applying for funding – unless, of course, it adds a large ‘Fudge-Factor’.)
|