HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #1181  
Old Posted Sep 22, 2017, 1:16 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Quote:
Originally Posted by Vorkuta View Post
I know it's been a long time in the works. I'm happy for the people of Westbrook Circle. IIRC, this could only be put in after all the CN stuff further downstream was taken care of, right?
Indeed. This problem required multiple steps to fix. Hopefully this works.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1182  
Old Posted Sep 22, 2017, 1:33 PM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
Quote:
Originally Posted by MonctonRad View Post
Indeed. This problem required multiple steps to fix. Hopefully this works.
this is approx 4 times the size of the culvert they had there before, and the houses down the street flooded at least twice before this was replaced.

I'm glad it's been replaced finally.

Edit: The Brook seems to be running passed without any problems, and is no longer as high as it was with the old culvert.

Last edited by Scarface; Sep 25, 2017 at 8:40 PM.
Reply With Quote
     
     
  #1183  
Old Posted Oct 3, 2017, 12:42 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
According to Mayor Dawn Arnold's FB page, the city has a new lessee for the lands at the Wharf Village Shops at Magnetic Hill. The post did not indicate what the new venture will be, but did state that things should be "operational" by Mother's Day.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1184  
Old Posted Oct 3, 2017, 5:49 AM
micks5477's Avatar
micks5477 micks5477 is offline
Registered User
 
Join Date: Mar 2013
Location: Moncton
Posts: 371
Quote:
Originally Posted by MonctonRad View Post
According to Mayor Dawn Arnold's FB page, the city has a new lessee for the lands at the Wharf Village Shops at Magnetic Hill. The post did not indicate what the new venture will be, but did state that things should be "operational" by Mother's Day.
The new owners plan on keeping it as is. The buildings will be renovated and work with a local engineer and get that structurally back up and running

http://919thebend.ca/news/898118998/magn...age-gets-new-lease-life-under-new-owners
Reply With Quote
     
     
  #1185  
Old Posted Oct 3, 2017, 12:51 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
CBC article about the rejuvenation of the Wharf Village


New owners say Wharf Village to be afloat again by spring
Councillor Greg Turner congratulates new owners on taking care of his 'pet peeve'
By Tori Weldon, CBC News Posted: Oct 03, 2017 8:00 AM AT| Last Updated: Oct 03, 2017 8:00 AM AT
http://www.cbc.ca/news/canada/new-brunsw...magnetic-hill-zoo-wharf-owners-1.4317726
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1186  
Old Posted Oct 4, 2017, 9:33 AM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
all the best to the new Owners.

Hopefully it is implemented correctly, and that what happen last time does not happen again.

Unfortunately for the new owners it will be a major undertaking since the Warf structure, and buildings had not been well maintained. Means a lot of Structural work will need to be done, and in a timely manner if they want to be open by Mothers day.
Reply With Quote
     
     
  #1187  
Old Posted Oct 4, 2017, 3:34 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
They are now working on the 6th and final floor at the new Holiday Inn and Suites on Mapleton at the TCH.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1188  
Old Posted Oct 8, 2017, 12:14 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Holiday Inn and Suites on Mapleton, now topped out at six floors.

__________________
Go 'Cats Go
Reply With Quote
     
     
  #1189  
Old Posted Oct 14, 2017, 1:06 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Wineries of Lutes Mountain:

Pioneer Mountain Estates (same people who own Pumphouse Brewery)

The vineyards are up and running. They plan to build a Bavarian style winery & restaurant on site in the next five years.

Here are a couple of renders from the T&T:





Magnetic Hill Estates Winery



Photo from mmmatt's construction photo tour from earlier this year. The new winery building is now topped out (three levels with a loft) and will be enclosed before the snow flies. The building is very large and will also feature a restaurant, patio and wine tasting space.

Who would ever have thought that Moncton would become a "Terroir" for wines.
__________________
Go 'Cats Go

Last edited by MonctonRad; Oct 15, 2017 at 3:28 AM.
Reply With Quote
     
     
  #1190  
Old Posted Oct 23, 2017, 6:58 PM
Good2go Good2go is offline
Registered User
 
Join Date: Sep 2011
Location: The Rural Community of Miramichi River Valley
Posts: 370
I see a section of Nordia's parking lot on Edinburgh Drive is fenced off and the asphalt removed?
Reply With Quote
     
     
  #1191  
Old Posted Oct 27, 2017, 7:55 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Tomar the tiger statue unveiled at Moncton zoo
A bronze sculpture of Moncton's beloved Amur tiger playing with a pumpkin is final piece in big cat exhibit
By Vanessa Blanch, CBC News Posted: Oct 27, 2017 3:53 PM AT Last Updated: Oct 27, 2017 3:53 PM AT
http://www.cbc.ca/news/canada/new-brunswick/tomar-tiger-magnetic-hill-zoo-moncton-1.4374787



Quote:
A bronze statue of Tomar the tiger was unveiled at Moncton's Magnetic Hill Zoo on Friday afternoon.

Manager Bruce Dougan said the life-sized sculpture commemorates the life of Tomar, an Amur or Siberian tiger, who lived at the zoo for a decade.

"Tomar was a very iconic animal at the Magnetic Hill Zoo and this whole area … the Amur area of the zoo, was built in his memory," Dougan told Information Morning Moncton.

The statue depicts Tomar as a cub, playing with one of his favourite things, a pumpkin.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1192  
Old Posted Nov 2, 2017, 12:29 PM
tmacdougall tmacdougall is offline
Registered User
 
Join Date: Jun 2014
Posts: 246
Nordic Spa progress.

[img]https://flic.kr/p/214PnuZ
Reply With Quote
     
     
  #1193  
Old Posted Nov 2, 2017, 12:36 PM
tmacdougall tmacdougall is offline
Registered User
 
Join Date: Jun 2014
Posts: 246
Not sure why the image isn't appearing here?!?

Quote:
Originally Posted by tmacdougall View Post
Nordic Spa progress.

[img]https://flic.kr/p/214PnuZ
Reply With Quote
     
     
  #1194  
Old Posted Nov 2, 2017, 12:45 PM
Ammn_guy Ammn_guy is offline
Registered User
 
Join Date: Jun 2012
Posts: 192
Quote:
Originally Posted by tmacdougall View Post
Not sure why the image isn't appearing here?!?
you cut off the img tags.. make sure you get the end [/url] or end [/img] when you copy and paste

here:

NORDIC Spa Monckton, NB by Trevor MacDougall
Reply With Quote
     
     
  #1195  
Old Posted Nov 2, 2017, 12:50 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152


Indeed, you almost got it right.

In BBCode format, to post an image you begin the link with [img]. You finish the link with [/img]. You just didn't include the [/img] at the end of your photo's address.

You'll get the hang of it.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1196  
Old Posted Nov 14, 2017, 4:22 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Interesting photo of the Magnetic Hill Winery vineyards overlooking Casino NB


from their Facebook page
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1197  
Old Posted Nov 14, 2017, 2:55 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
As noted in the main Moncton thread, there is a plan to put in a roundabout at the Evergreen/Ryan intersection, with construction perhaps beginning in 2019.

With the existing roundabout at the Ryan/Horsman intersection, this will effectively bracket Ecole le Sommet, similar to the two new roundabouts on Dieppe Blvd on either side of the new francophone school there.

I wonder if part of the plan is for these roundabouts to act as traffic calming features to limit speeding around these two schools.......
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1198  
Old Posted Nov 18, 2017, 4:47 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
In the T&T today that the fabled North End Community Centre has been put off for yet another year (this is about the fifth time the centre has been put off for a year, and this is after years of lobbying effort before that!!)

The reason ostensibly is that the city and the YMCA (who will be operating the facility as a satellite of the YMCA on Vaughan Harvey) still haven't come to an agreement, although the city spokesman was confident that an agreement will be reached very shortly.

Still, we are distressingly early in the process. Without an operating agreement, the YMCA will not come up with a final plan of what will be included in the centre (some basics have however been decided like community meeting space, community gardens, indoor walking track, indoor splash pad). Without knowing what services will ultimately be included, plans and renders can't be drawn up. Without the renders, the cost of the centre cannot be estimated. Without cost estimates, the city can't make requests to the other levels of government for funding. Without funding in place, actual construction plans cannot be developed. As such, even if things progress optimally, I'm willing to bet it'll be at least five years before the centre opens.

In addition to the centre itself, a lot of supportive infrastructure has to be built. Although the centre was originally to have been built in behind Evergreen Park School, the plan is now to build the centre on Twin Oaks next to Ecole le Sommet. The ostensible reasons being that Twin Oaks will be a main street in the neighbourhood, and that the seven acre site gives lots of room for growth. It should be noted however that this section of Twin Oaks has yet to be built, and yet to be connected to the Ryan/Horsman roundabout. There will need to be millions of dollars of work here to even get to the point where the community centre could be built.

There are still many things that could go wrong in this process........
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1199  
Old Posted Nov 18, 2017, 6:50 PM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
Quote:
Originally Posted by MonctonRad View Post
In the T&T today that the fabled North End Community Centre has been put off for yet another year (this is about the fifth time the centre has been put off for a year, and this is after years of lobbying effort before that!!)

The reason ostensibly is that the city and the YMCA (who will be operating the facility as a satellite of the YMCA on Vaughan Harvey) still haven't come to an agreement, although the city spokesman was confident that an agreement will be reached very shortly.

Still, we are distressingly early in the process. Without an operating agreement, the YMCA will not come up with a final plan of what will be included in the centre (some basics have however been decided like community meeting space, community gardens, indoor walking track, indoor splash pad). Without knowing what services will ultimately be included, plans and renders can't be drawn up. Without the renders, the cost of the centre cannot be estimated. Without cost estimates, the city can't make requests to the other levels of government for funding. Without funding in place, actual construction plans cannot be developed. As such, even if things progress optimally, I'm willing to bet it'll be at least five years before the centre opens.

In addition to the centre itself, a lot of supportive infrastructure has to be built. Although the centre was originally to have been built in behind Evergreen Park School, the plan is now to build the centre on Twin Oaks next to Ecole le Sommet. The ostensible reasons being that Twin Oaks will be a main street in the neighbourhood, and that the seven acre site gives lots of room for growth. It should be noted however that this section of Twin Oaks has yet to be built, and yet to be connected to the Ryan/Horsman roundabout. There will need to be millions of dollars of work here to even get to the point where the community centre could be built.

There are still many things that could go wrong in this process........
Would it be the North West Corner of Twin Oaks, and Holland?

Last plans I had seen for the area was before École Le Sommet was built, and had Holland Road Extended to Samson Street, and Twin Oaks extended to the round about where the school entrance curently is with 2 Buildings on Ryan backing onto a street that conected Holland, and turnd left conecting to Twin oaks with a Court like street from Holland on the North East of the development. The plans looked to be Semi Detached, and fully detached homes with the 2 larger buildings looking from above like they would have matched the 2 apartment buildings just past Pebble Creek Way. Along with the school, and another lot behind it. that would be potentially 7 Acres.
Reply With Quote
     
     
  #1200  
Old Posted Nov 18, 2017, 8:52 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,152
Quote:
Originally Posted by Scarface View Post
Would it be the North West Corner of Twin Oaks, and Holland?

Last plans I had seen for the area was before École Le Sommet was built, and had Holland Road Extended to Samson Street, and Twin Oaks extended to the round about where the school entrance curently is with 2 Buildings on Ryan backing onto a street that conected Holland, and turnd left conecting to Twin oaks with a Court like street from Holland on the North East of the development. The plans looked to be Semi Detached, and fully detached homes with the 2 larger buildings looking from above like they would have matched the 2 apartment buildings just past Pebble Creek Way. Along with the school, and another lot behind it. that would be potentially 7 Acres.
Speculative at this point, but I imagine that you are right. This parcel of land makes the most sense.

__________________
Go 'Cats Go
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 8:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.