View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #8321  
Old Posted Oct 19, 2017, 6:57 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Quote:
Originally Posted by dpogue View Post
They tried to restrict access to Stadium station to solely from the Expo boulevard side, but it was so crowded that staff had trouble even getting to the Beatty street side to lower the grilles.
Aren't they able to turn off the Compass gates and lower the station gates from the control center?
     
     
  #8322  
Old Posted Oct 19, 2017, 7:49 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,794
Well the downtown stations have those weird connections to Sinclair Centre etc.

I doubt Translink has the budget to say install entrances on all four corners of Broadway and ongoing maintenance.. even if they wanted to do it.
     
     
  #8323  
Old Posted Oct 19, 2017, 10:51 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,670
Quote:
Originally Posted by jollyburger View Post
Well the downtown stations have those weird connections to Sinclair Centre etc.

I doubt Translink has the budget to say install entrances on all four corners of Broadway and ongoing maintenance.. even if they wanted to do it.
Couldn't they have smaller entrances like NYC subway style entrances, all going down to the concourse?
     
     
  #8324  
Old Posted Oct 19, 2017, 2:30 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,217
Quote:
Originally Posted by aberdeen5698 View Post
Umm.... isn't it better to have more and bigger exits in the event of a fire?
I'm mostly saying you can't just build them to the same standard underground. Fire exits for underground station need to have their own ventilation, and are built to be mostly isolated from the rest of the structure.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #8325  
Old Posted Oct 19, 2017, 4:20 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,730
Quote:
Originally Posted by GeeCee View Post
Aren't they able to turn off the Compass gates and lower the station gates from the control center?
They do but staff needs to be on hand to make sure the gates can actually be lowered. Hard to do if there's a large crowd there.
     
     
  #8326  
Old Posted Oct 20, 2017, 12:20 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
The Buzzer Blog - Get involved in the environmental and socio-economic reviews for both rapid transit projects

Quote:
Today, we are launching the Environmental and Socio-Economic Review process for both the Vancouver and Surrey rapid transit projects.

To get involved, please review the technical summaries for each project. Next, fill out the online surveys until November 6 for the Millennium Line Broadway Extension and Surrey–Newton–Guildford LRT projects.
     
     
  #8327  
Old Posted Oct 20, 2017, 7:01 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 769
Quote:
Originally Posted by GeeCee View Post
Aren't they able to turn off the Compass gates and lower the station gates from the control center?
In theory the Gate Monitoring Centre could set gates to exit-only mode, but I think someone at the station needs to call up and provide them the gate ID numbers.

Station grilles can be raised remotely (and usually are in the morning) but I think they have to be lowered using a key at the actual station. Would be a huge mess of paperwork if they lowered a grille remotely and ended up trapping someone inside the station.
     
     
  #8328  
Old Posted Oct 21, 2017, 6:00 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Funding the new rail systems

A Translink article said that they expect to get final commitment on the Arbutus Line and the Surrey LRT in 2018.

Does any one know if they mean January 2018 or December 2018.
     
     
  #8329  
Old Posted Oct 21, 2017, 6:02 AM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,730
Quote:
Originally Posted by Hooknose View Post
A Translink article said that they expect to get final commitment on the Arbutus Line and the Surrey LRT in 2018.

Does any one know if they mean January 2018 or December 2018.
From this story:

Quote:
When it comes to Phase 2 funding, Buda said the goal is to get a funding agreement in place with the province by the end of this year or early next year.
     
     
  #8330  
Old Posted Oct 21, 2017, 4:05 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by Hooknose View Post
A Translink article said that they expect to get final commitment on the Arbutus Line and the Surrey LRT in 2018.
Just to be clear, it's the "Broadway Line" that goes to Arbutus, not the "Arbutus Line".

An "Arbutus Line" would be one that follows the Arbutus corridor from Broadway southbound.

And sorry, but I have no idea when in 2018 they expect to get under way.
     
     
  #8331  
Old Posted Oct 21, 2017, 4:20 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by aberdeen5698 View Post
Just to be clear, it's the "Broadway Line" that goes to Arbutus, not the "Arbutus Line".

An "Arbutus Line" would be one that follows the Arbutus corridor from Broadway southbound.

And sorry, but I have no idea when in 2018 they expect to get under way.
After the funding is approved, it'll be who knows how long to put an RFQ together, RFQ Process, shortlist bidders, RFP process, and finally select a contractor.

Construction is still years away...
     
     
  #8332  
Old Posted Oct 21, 2017, 4:39 PM
casper's Avatar
casper casper is offline
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 12,975
Quote:
Originally Posted by M00dy View Post
After the funding is approved, it'll be who knows how long to put an RFQ together, RFQ Process, shortlist bidders, RFP process, and finally select a contractor.

Construction is still years away...
I would assume translink can get started on other aspects of the projects in parallel to the RFP.

They need to acquire land for stations, negotiate agreements with interconnected properties, probably another layer of environment and soil assessment etc. Start to think about what they do with the arbutus station to allow integration with a future arbutus line.
     
     
  #8333  
Old Posted Oct 21, 2017, 4:44 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by casper View Post
I would assume translink can get started on other aspects of the projects in parallel to the RFP.

They need to acquire land for stations, negotiate agreements with interconnected properties, probably another layer of environment and soil assessment etc. Start to think about what they do with the arbutus station to allow integration with a future arbutus line.
True. I hope some of that is already in progress.
     
     
  #8334  
Old Posted Oct 23, 2017, 6:00 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,123
Cool

Quote:
Originally Posted by VancouverOfTheFuture View Post
probably wont happen with Translink wanting everyone to go through 1 entrance/exit. hell that underground walkway at Stadium is still full of sand and gravel.
What is this underground walkway you speak of? I'm intrigued. Any images?
     
     
  #8335  
Old Posted Oct 23, 2017, 8:58 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by twoNeurons View Post
What is this underground walkway you speak of? I'm intrigued. Any images?
From Wiki:
The station was originally constructed with a passageway under Beatty Street to the west in anticipation of future development. When the Amec Building built across Beatty Street did not link to the underground passage, the passage was closed and is currently occupied by the Lost Property Office. The staircase on the west side of Beatty was filled with sand and topped with a concrete sidewalk, so that the passage could be reopened in the future.

From a Vancouver Council Report:
The pedestrian connection to SkyTrain under Beatty Street was kept open until about 1992, and then closed because of security concerns. The isolated location and corner blind spots in the connection were considered to be a problem because of low pedestrian volumes, even after additional security measures including cameras and enhanced lighting were added. The closure did not impair station access as there is a convenient surface route across Beatty Street using the signal at Dunsmuir Street. The surface route is direct and has a slightly shorter walking distance than the underground connection, but lacks the protection from weather and traffic that the connection offers. Wheelchair access was not affected by the closure as the connection has no ramps.
     
     
  #8336  
Old Posted Oct 24, 2017, 1:30 AM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,554
Looks like it's for real this time

I went down to City Hall today to see if there would be a model of 33 Cordova (Blood Alley), as the project was before the Heritage Commission today. No dice on the model, but in the Townhall room COV staff were giving a presentation to Broadway Corridor business owners. I didn't have a chance to pop into the meeting as it was closed to the public, but I thought worth posting to show the wheels really are motion.
     
     
  #8337  
Old Posted Oct 24, 2017, 2:23 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,025
Good to hear, thanks for the tip.

With recent highway project cancellations and the Surrey LRT becoming worse in design and capacity at every turn this is essentially the only major project I am excited for in our region (The Pattullo is also exciting but the planned 4 lane opening is anti-climatic and has resulted in some terribly planned merge points, all taking away from the excitement in that project).

I hope they don't drop the ball on this as well.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #8338  
Old Posted Oct 24, 2017, 4:37 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,180
Quote:
Originally Posted by Feathered Friend View Post
I've heard from several sources that a Broadway Corridor rezoning plan will start next year, so hopefully it won't be a long wait/process.
This will be a tough one for the Cov. Will they be willing to rezone the walk-ups along the corridor? Up to now the City has left affordable walk-ups alone. Then there are all the detached homes on the west side.

Somethings gotta give, otherwise there's not much opportunity to up zone except along Broadway itself.
     
     
  #8339  
Old Posted Oct 24, 2017, 4:51 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,179
Say, any ideas on where they're going to put the Main or Granville stations? There isn't much room left on either street...
     
     
  #8340  
Old Posted Oct 24, 2017, 4:58 AM
a very long weekend's Avatar
a very long weekend a very long weekend is offline
dazzle me
 
Join Date: Jan 2014
Location: 94109
Posts: 824
@ logan: the city won't do anything but the province could upzone the broadway corridor (or anything else it wanted). there's a great misapprehension among almost everyone, including many on this very board, that the vancouver charter or some imaginary constitution precludes that sort of action, but it doesn't. people are imputing american constitutional norms to canada. in fact (and, of course, at law), the city is a creation of the province and the legislature could do anything it desires, as vancouverites saw with how the province replaced the school board. that includes upzoning the city of vancouver at will. so, if the city situation looks hopeless because the NIMBYs and city property value mafia command the politicians' attention, there's still a path forward: the province. but even there, it's not all that likely, since the NDP won pretty much the entire broadway corridor.
__________________
"Yes, we destroyed the planet. But in one brief, beautiful moment, we created tremendous value for shareholders."
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:56 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.