Quote:
Originally Posted by PHrenetic
Good Day...
? Are you planning a terminus at the Chateau L. , in the old tram/RR trackway ?
... or planning eventually for a southward or eastward extension from there ?
Not that I am objecting - it's a good plan, and a terminus at the C.L. makes a lot of sense to me. There is enough space for one.
I am just asking what you may see as a potential extension from there, if at all.
|
I've advocated for a terminus at the Château where the trams used to run.
The big upside is that it's low-hanging fruit - there's an existing RoW leading straight to a ready-built space for a station under a busy downtown intersection. This isn't a common occurrence.
The downside is that I don't really see how it could be extended further. Any extension would probably require the line to either come up to grade (as LRT's Friend described a few posts up), or to tunnel down. I think that the tunnel is unlikely, if only because if you're going to spend that kind of money on it, you'd may as well tunnel under the river closer to the downtown core (e.g. in the alignment of Bank Street). The surface loop is more feasible in my eyes because the infrastructure is less expensive, yet still allows to link more destinations or extensions on the line. That said, running LRT on the surface in a dense and busy area like downtown is not without its significant pitfalls; even with separate lanes, the service would likely be slow and vulnerable to frequent interruptions and delays. Since the loop would mostly serve people getting on or off downtown (as opposed to people transiting through), slower service would still be acceptable from a transportation perspective.
However, I maintain that the Château option would be the best solution, at least until Ottawa resolves to build a loop through downtown. Until then, having a terminus under Wellington is a good example of the
Pareto Principle: It will get you 80% of the benefits for 20% of the effort. And that's pretty damn good.