Quote:
Originally Posted by Truenorth00
I maybe rare on here. But I supported the cancellation. And I think the Confed Line is far better. The old plan wouldn't have done much to relieve the core. Would have had less ridership. And with no tunnel, would have been a long term disaster.
I don't get the mentality, "Well something would have gotten built." That plan would have seriously screwed up further transit development down the road. Especially in the core.
|
We lost 10 years and $100M and growing. Our alternative for the south end of the city is third rate. You are assuming that the original plan would have been the end. It was always considered to be a starting point. An east-west line would have been built more or less on the same schedule as we are building today. A downtown tunnel would have been inevitable. The original project would have proven its need. At least the south route would have been connected to downtown, which will never happen the way we are going and lower ridership is inevitable.
We did not need to choose between north-south and east-west. We could have had both. As it stands, the north-south route is simply a student train and it will remain that way.