Quote:
Originally Posted by Mister F
Whether or not a 33% reduction to Kitchener is worth it is debatable
|
At least we agree on something.
Quote:
Originally Posted by Mister F
RER is under construction. It's a gradual upgrade on all lines and the next service upgrade will be the introduction of midday and evening trains on the Stouffville line later this month. Double tracking is happening in phases along with lots of grade separations and and signal upgrades. Service will be significantly upgraded by the time HSR might be in operation.
|
Yes construction projects are underway, but touted objective of RER (15 or 30 minute all day service on key lines) is nowhere near implementation, nor is electrification (which is supposed to speed up service).
This (and the other transportation project I mentioned) are vital for any sort of high speed service (whether this project tor something else) to make any dent in car ridership (which is the apparent objective of the project).
While there has been some progress in recent years (notably google), downtown Kitchener has none of Waterloo Region's major employers (which are mostly in Waterloo or the 401 corridor) and few residents. London is similar (although it has more employers). Nobody is going to notice a 24 minute savings compared to GO or a 26 minute savings compared to driving (47 for London) if they have to deal with lousy local transit, or have to drive/park downtown or uber/cab to get a train.
In many ways, the HSR is actually worse than RER because it cuts off numerous access points to the regional transportation system (park and ride facilities, many GO Bus routes, several rapid transit routes) leading to higher door-to-door travel times. Not to mention, in most implementations high speed services cost more and require advance purchase, which could further disadvantage it compared to GO.
Quote:
Originally Posted by Mister F
As for your point about Kitchener being the principal destination being a reason not to build HSR, you're really grasping at straws. There are HSR lines that are shorter than the distance from Toronto to Kitchener or London. Every problem you bring up has been dealt with in other places.
|
Name one example where the two largest cities serviced by a high speed rail line are less than 100 km apart and this is intended to be the longer-term situation (i.e. not a phase under construction).
Rome and Milan are 600 km apart, New York and Washington are 350km apart, Tokyo and Osaka are 500 km apart, Madrid and Barcelona are 600 km apart, Paris and Lyon are 450 km apart, LA and SF are 600 km apart. London and Birmingham are 200 km apart.
In these cases, the time savings was (or will be) measured in hours, so extra public transportation time was still worth it. On Toronto-Windsor the proposed savings are pretty significant, but it is hard to see that route having a lot of ridership.