Quote:
Originally Posted by acottawa
LGV Sud Europe Atlantique is under construction and not yet operating a high speed service. The plan is to build a parallel high speed line.
|
Yes, as I said, the existing line handles TGV trains going 220 as well as slower regional trains. The new line will carry TGV trains going 300. The slower, older line has speeds not far off of the Ontario proposal.
Quote:
Originally Posted by acottawa
Acela is 4 tracked most of the way so the Acela trains can go around commuter and regional trains. In places where they share tracks, the Acela trains do not go at high speed.
|
The part of the Acela service that goes 240 in Massachusetts and Rhode Island is mostly 2 tracks and also carries MBTA commuter trains. There's some triple tracking in those sections like at some of the commuter stations.
Another example is the
Nuremberg-Munich line, which carries express trains at 300, regional express trains at 200, and regional trains at 140.
Quote:
Originally Posted by acottawa
Berlin to Hanover only runs at high speed between Staaken and Oebisfelde, where again there is a high speed line runs parallel to the old line that is used for other services.
|
Yes, this is what I said.
Quote:
Originally Posted by acottawa
To my knowledge, nobody is proposing building a parallel high speed line between Toronto and Kitchener (although scenario A has a few small segments of new track that could presumably be used for higher speeds than the shared track would allow).
I have also not seen any indication that GO is going to upgrade their fleet with high speed rolling stock (electrification does not necessarily mean high speed - most electric trains run at conventional speeds). There are no high speed commuter trains in North America, so it would have to be a custom order which would be extraordinarily complicated and expensive. GO trains often have standing passengers - not sure if a high speed service would even be allowed.
|
We won't know how much new track will be built until the environmental assessment is done. And of course GO Transit isn't ordering faster trains; the high speed proposal is hardly set in stone. Even after the EA is done there's no guarantee that it'll be built, especially if a new government is elected next year. GO would be foolish to order faster trains at this point.
But if the line goes ahead, there's nothing preventing GO from buying faster trains to take advantage of the better tracks. Or they could even go the Japanese route and use high speed trains to carry commuters. There are lots of options to carry commuters at higher speeds.
What exactly are you claiming, that the Ontario proposal is impossible? That the people designing it are unaware of this? Do you know better than them?
Quote:
Originally Posted by Truenorth00
Plenty of pent up demand. We're seeing that with VIA's ridership increase despite the — service. We also know how much driving there is along these corridors. And let's not forget the nearly 100 flights a day in the Corridor.
|
It's actually more than that. Expedia shows 114 direct flights between Toronto, Ottawa and Montreal tomorrow. That's not even counting the rest of the corridor.