Quote:
Originally Posted by J.OT13 View Post
Ah cm'on!! You're freakin' kidding. Why the hell would they waste our time and money on studying corridors 5 and 13!? We're not going to build a proper rapid transit system for the 200,000 who live in the 8 square kilometers downtown, but hey, let's blow our money to serve the 30,000 who live in sprawling, car-dependent Stittville or maybe the Kanata North parking lots and wetlands.
Quote:
Originally Posted by AndyMEng View Post
I don't understand why the lines can't have multiple endings? Stockholm, London, other major cities have LRT lines that split into several final destinations. It makes so much more sense to have less service at the ends (split into 1/3rd of the trains) and more in the core?

Why can't we have a part of all those options:
1. Go up March road, end at Dunrobin road with a park'n'ride.
2. Follow the trans canada trail, pick up Bells Corners, and extend to Stittsville Main (and then maybe 'gasp' Carleton Place??)
3. Go down the highway to Tanger so people can get their crappy shopping on.

Bayshore or 'sigh' Moodie... becomes the hub of all three lines.

Same with East, why can't we have one line down the highway to Trim, one line partially down Innes, and one line that splits to Montreal Road East?

All surface routes on large suburban streets/bush that can be built for the minimum cost compared to our downtown construction. In 100 years the densification will account for the construction now.

I'd like to know why we're sending this to the CTC, at all, especially in light of the Sens probable move to LeBreton. Kanata's biggest problem is that someone (Teron?) long ago had the not-so-bright idea to try to make a "town centre" straddling a freeway. We've been wedded to this absurd idea ever since. I doubt it will ever work.

Kanata's second major problem is that having put a few facts-on-the-ground to match their absurd town centre straddling a freeway plan, they nevertheless didn't really try to make a go of it. So instead of concentrating all development along the freeway corridor, they went both north and south along the edge of the Greenbelt. Note that very little of Kanata's employment, and less still of its tech employment, is located along the Queensway (there's a bit in the Terry Fox-Palladium area, but that's about it). An LRT line to the CTC along the Queensway would see very little reverse flow transit use. In contrast, bus routes like the #101 (or whatever it is now) do actually see a fair bit of use.

At this point, I think they should just abandon the entire town centre straddling a freeway thing. Accordingly, don't send LRT down the freeway. In general, putting light rail down expressways and freeways, while oh-so-tempting to transportation engineers, doesn't do much to support development intensification because you're working with an inherently hostile environment with lots of land that is effectively sterilized from urban development.

Instead of one LRT corridor, they should have two: one going northwest, roughly following the old Renfrew Sub (and I mean the multiuser path, to bring it closer to DND) to Kanata North, then once past Teron head northwest along either March or Legget (with the removal of a few buildings on Carling). If Legget, it can transition to March near Terry Fox and carry on northwestwards indefinitely. There's so much asphalt in this area that redevelopment over the coming decades becomes quite plausible.

The other corridor can head along the old CPR Carleton Place Sub/TransCanada Trail past Bells Corners at least as far as Robertson Rd, and then continue southwest along either Robertson or the old railway corridor to Stittsville and beyond. Building would be easier in the latter with more opportunities for TOD just east and south of Stittsville.

I think what aggrieves me most about all these studies though is the fact that they keep on planning these routes as fully grade-separated. We're out in the suburbs now. The entire rationale for *light rail* and not light metro was that we'd get cheaper construction once outside the Greenbelt. But no, we're getting light metro with all the extra costs. If they shelved the grade separation requirements, we could get two LRT corridors heading into Kanata.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:44 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.