  #921  
Old Posted Apr 7, 2017, 2:45 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,893
Yes, that building.
Reply With Quote
     
     
  #922  
Old Posted Apr 7, 2017, 3:44 PM
AndyMEng AndyMEng is offline
Registered User
 
Join Date: Jun 2015
Posts: 393
Quote:
Originally Posted by eltodesukane View Post
I remember reading that this was built by a guy from Montreal who was thinking "If we build it, they will come" and then nobody came.
Reply With Quote
     
     
  #923  
Old Posted Apr 7, 2017, 8:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Don't remember the timeline exactly, but wasn't this around the time that Morguard started on Performance Court and the Feds had millions of square feet of office space built in the region while simultaneously slicing thousands of jobs (that they had created in the first place over the two previous years)?
Reply With Quote
     
     
  #924  
Old Posted Apr 7, 2017, 8:33 PM
TMA-1's Avatar
TMA-1 TMA-1 is offline
Registered User
 
Join Date: Jul 2006
Location: Ontario
Posts: 298
I can't find my shot of the hole in the ground, poor keywording, but I do have Vanier at the ground floor Oct 20 2012. Was there an SSP thread for it? To keep things legal in Icon's thread this is an overall shot of both building locations (ahem). Vanier building is in the far lower left. Tribeca was mostly done with its second floor at the same time so I suppose Vanier has been slow. I posted something somewhere comparing Vanier excavation to Tribeca because they were both quite large in their own way. Where I do not know.



icon not icon
by Chuck Clark, on Flickr




Quote:
Originally Posted by eltodesukane View Post
Reply With Quote
     
     
  #925  
Old Posted Apr 7, 2017, 8:43 PM
TMA-1's Avatar
TMA-1 TMA-1 is offline
Registered User
 
Join Date: Jul 2006
Location: Ontario
Posts: 298
From the Oct 20 2012 tour: Central 2, Tribeca, 150 Elgin, 90 Elgin, Plaza 3, Work south side of Wellington, Merit, UFO work near the sports field, SOBA, Landsdowne, Gotham, Maplewood and I'm tired of looking. Plenty of projects under construction in 2012.
***********************************************************

Quote:
Originally Posted by J.OT13 View Post
Don't remember the timeline exactly, but wasn't this around the time that Morguard started on Performance Court and the Feds had millions of square feet of office space built in the region while simultaneously slicing thousands of jobs (that they had created in the first place over the two previous years)?
Reply With Quote
     
     
  #926  
Old Posted Apr 19, 2017, 4:15 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
That is still an impressive hole in the ground that has yet to make an impact on the hole in the skyline. Surely they must be getting the subterranean levels done soon...
Reply With Quote
     
     
  #927  
Old Posted Apr 19, 2017, 7:20 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,825
Went back looking at the thread and it seems like they started digging around Feb 2015... So it's been over 2 years now and they haven't even completed a what, 9-story underground parking structure?

60+ story towers go up faster than that in Toronto or around the world...
Reply With Quote
     
     
  #928  
Old Posted Apr 19, 2017, 11:42 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Quote:
Originally Posted by OTSkyline View Post
Went back looking at the thread and it seems like they started digging around Feb 2015... So it's been over 2 years now and they haven't even completed a what, 9-story underground parking structure?

60+ story towers go up faster than that in Toronto or around the world...
The Chinese could have built half of modern Bejing in the same time...or at least several 100+ storey buildings
Reply With Quote
     
     
  #929  
Old Posted Apr 20, 2017, 12:06 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
Quote:
Originally Posted by Davis137 View Post
The Chinese could have built half of modern Bejing in the same time...or at least several 100+ storey buildings
How many would have died in the process though? Site has been shut down all winter due to the ice or potential of ice. It's about a month per parking level which means they will be at street level in the fall and after that it's game on and a week per floor going up the rest of the way.
Reply With Quote
     
     
  #930  
Old Posted May 3, 2017, 4:33 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Yeah, I know what you mean, and I am sure there are places in the world where there is an acceptable amount of collateral damage in most projects. I am happy that this building IS still going to get built, and it's going to look amazing when viewed from the south end of Dows lake, especially at dusk or dawn...
Reply With Quote
     
     
  #931  
Old Posted May 4, 2017, 3:35 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Quote:
Originally Posted by ServiceGuy View Post
Workers have returned to the site. Question I have is how will they take the crane down when finished with it? I can't see a mobile crane being able to reach that high which is typically what's done for the 25~27 story type building.
It's a longer process when they get that tall. You work in reverse of the process to raise them. You use the crane to remove sections from itself and lower them to the ground until you get down far enough to finish the job with a mobile crane. On very tall ones this process can take several days.
Reply With Quote
     
     
  #932  
Old Posted May 20, 2017, 6:03 PM
mtcross mtcross is offline
Registered User
 
Join Date: Dec 2014
Posts: 34
Cool Progress?





Reply With Quote
     
     
  #933  
Old Posted May 21, 2017, 12:57 AM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
I think that's some progress from two months ago

Great to see another update, I was hoping someone would hop over to the site sometime.
__________________
"Living life on the edge"
Reply With Quote
     
     
  #934  
Old Posted May 21, 2017, 2:16 AM
Hamada Hamada is offline
Registered User
 
Join Date: Sep 2016
Posts: 46
Looks like they are almost halfway to street level.
Reply With Quote
     
     
  #935  
Old Posted May 21, 2017, 10:19 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Cool to see them actually building up towards street level. Like most other projects, I guess this one will really take off once above grade, and the podium portion of the building being done...
Reply With Quote
     
     
  #936  
Old Posted May 23, 2017, 7:33 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
It never ceases to astonish me how deep and narrow the hole is...
Reply With Quote
     
     
  #937  
Old Posted May 25, 2017, 3:58 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
In point of fact, I too am astonished how small the site is for a building of this scale and height...will it be going from lot line to lot line?
Reply With Quote
     
     
  #938  
Old Posted Jun 2, 2017, 12:43 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
Update: I work near this site and pass it every day. I estimate Four sub floors are completed. As the floor plates slope upward for the parking garage, the 5 to 6 sub floor concrete pour is 2/3 done. If I am off then it would be 5 sub floors.
Reply With Quote
     
     
  #939  
Old Posted Jun 7, 2017, 3:38 PM
YOWflier's Avatar
YOWflier YOWflier is offline
Melissa: fabulous.
 
Join Date: Apr 2005
Location: YOW/CYOW/CUUP
Posts: 3,193
Today:

Reply With Quote
     
     
  #940  
Old Posted Jun 7, 2017, 8:04 PM
Soi-Fon's Avatar
Soi-Fon Soi-Fon is offline
Registered User
 
Join Date: Dec 2016
Posts: 135
Quote:
Originally Posted by ac888yow View Post
Today:


At last, almost street level !
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 10:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.