HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7841  
Old Posted Apr 5, 2017, 5:38 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by retro_orange View Post
Last year. I don't have time to go through thread history to quote you on it.
I've never said that the M-Line isn't needed. I've been saying for years it's urgently needed and also that it should go all the way to UBC...

And the Canada Line is operating under capacity. It has a potential of 15,000pphpd with additional rolling stock and higher frequencies. It's nowhere near that today.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7842  
Old Posted Apr 5, 2017, 5:43 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,109
Quote:
Originally Posted by retro_orange View Post
Last year. I don't have time to go through thread history to quote you on it.
Pretty sure you're confusing Jebby with libtard.
     
     
  #7843  
Old Posted Apr 5, 2017, 6:43 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
What I'm hearing from you guys is the opposite of what I wanted to hear lol.

When this project was proposed the first thing I imagined was a grand broadway-cityhall station linking up the two lines beautifully.

Seeing people cross an intersection to transfer would be extremely tacky. At least it'll get a scrambled intersection going, I hope?
     
     
  #7844  
Old Posted Apr 5, 2017, 8:24 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Bobert View Post
At least it'll get a scrambled intersection going, I hope?
unlikely. odds are there will be underground connections though.
     
     
  #7845  
Old Posted Apr 5, 2017, 9:32 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Chances are it will be a proper underground connection without leaving the fare paid zone, especially since the Canada Line Broadway Station has been pre-designed for this.

That said, I wouldn't be surprised if the city forced some stupid social engineering aspect (such as all activities must be on the surface) or some penny pinching occurred to stop this from happening.

The single station entrances and the lack of a proper underground connection at Granville to the Expo Line on the Canada Line were not just the result of value engineering, they were also done at the will of the cities (the idea that single entrances are safer and the idea that underground connections kill street pedestrian life....)
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7846  
Old Posted Apr 5, 2017, 1:15 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
  #7847  
Old Posted Apr 5, 2017, 2:29 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by Metro-One View Post
The single station entrances and the lack of a proper underground connection at Granville to the Expo Line on the Canada Line were not just the result of value engineering, they were also done at the will of the cities (the idea that single entrances are safer and the idea that underground connections kill street pedestrian life....)
All it's really done is to guarantee a steady stream of people passing through The Bay.
     
     
  #7848  
Old Posted Apr 5, 2017, 2:35 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,503
Quote:
Originally Posted by Bobert View Post
At least it'll get a scrambled intersection going, I hope?
I hope not. That's a very wide intersection, and has some of the most lazy-assed, entitled pedestrians taking their sweet time to cross. As a frequent pedestrian in that area, it's embarrassing to watch.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #7849  
Old Posted Apr 5, 2017, 3:19 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,599
Quote:
Originally Posted by s211 View Post
I hope not. That's a very wide intersection, and has some of the most lazy-assed, entitled pedestrians taking their sweet time to cross. As a frequent pedestrian in that area, it's embarrassing to watch.
Yes, pushing that traffic underground will help. The more people that can get to their desired corner without crossing at street level, the better.

And of course the connection to the Millennium line will mean less people coming up to grab a bus, etc.
     
     
  #7850  
Old Posted Apr 5, 2017, 4:04 PM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
a quick update on the drilling

I got a bit of backroom gossip on the recent drilling for core samples on Broadway.

If the soil samples are suitable then the plan is for a TBM to bore all the way to Arbutus along Broadway.

If the soils are not suitable for a TBM then the plan is a cut and cover along 8th.

Amazing that this late into the procedure, they still are not sure.
     
     
  #7851  
Old Posted Apr 5, 2017, 4:43 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:26 AM.
     
     
  #7852  
Old Posted Apr 5, 2017, 5:02 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by Hooknose View Post
I got a bit of backroom gossip on the recent drilling for core samples on Broadway.

If the soil samples are suitable then the plan is for a TBM to bore all the way to Arbutus along Broadway.

If the soils are not suitable for a TBM then the plan is a cut and cover along 8th.

Amazing that this late into the procedure, they still are not sure.
The ground is always the fun unknown factor in tunnelling. It dictates what's a safe method and all the equipment for excavation.

Unless things break like they did on the Seattle SR99 tunnel, the bulk of problems in tunnelling are generally caused by ground conditions.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7853  
Old Posted Apr 5, 2017, 5:06 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by Reecemartin View Post
Curious, do we expect them to remove the TBMs at Arbutus or will they leave them and use them to continue further along?
They would probably either bury them permanently or remove them. Maintenance would need to be done after driving the tunnel to Arbutus. Nobody would want to start excavating a second phase of a tunnel drive using a machine that hasn't been significantly rebuilt since the first phase.

The cost/benefit of removing a $10M machine versus having the potential for a breakdown later is generally in favour of using fully rebuilt or new machines.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7854  
Old Posted Apr 5, 2017, 6:14 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by Alex Mackinnon View Post
They would probably either bury them permanently or remove them. Maintenance would need to be done after driving the tunnel to Arbutus. Nobody would want to start excavating a second phase of a tunnel drive using a machine that hasn't been significantly rebuilt since the first phase.
Yeah, it's still challenging for me to wrap my mind around the idea that such a complex, expensive machine has basically the same status as wooden forms for pouring concrete - you make them, use them, and then throw them away.
     
     
  #7855  
Old Posted Apr 5, 2017, 6:32 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,599
Quote:
Originally Posted by Hooknose View Post
I got a bit of backroom gossip on the recent drilling for core samples on Broadway.

If the soil samples are suitable then the plan is for a TBM to bore all the way to Arbutus along Broadway.

If the soils are not suitable for a TBM then the plan is a cut and cover along 8th.

Amazing that this late into the procedure, they still are not sure.
Cool thanks for the update.

Wouldn't those options mean significant differences in price and schedule?
     
     
  #7856  
Old Posted Apr 5, 2017, 6:51 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by aberdeen5698 View Post
Yeah, it's still challenging for me to wrap my mind around the idea that such a complex, expensive machine has basically the same status as wooden forms for pouring concrete - you make them, use them, and then throw them away.
I think a drill bit would be a more relevant comparison.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7857  
Old Posted Apr 5, 2017, 7:55 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,503
Quote:
Originally Posted by Hooknose View Post
I got a bit of backroom gossip on the recent drilling for core samples on Broadway.

If the soil samples are suitable then the plan is for a TBM to bore all the way to Arbutus along Broadway.

If the soils are not suitable for a TBM then the plan is a cut and cover along 8th.
Amazing that this late into the procedure, they still are not sure.
Wait, what? Is that a late April Fool joke? Cut and cover along 8th?
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #7858  
Old Posted Apr 5, 2017, 10:09 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by s211 View Post
Wait, what? Is that a late April Fool joke? Cut and cover along 8th?
10th ave being the busiest E/W route for bikes?
     
     
  #7859  
Old Posted Apr 5, 2017, 11:07 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Cut and Cover under 8th Ave doesn't make sense.
There's a GVRD Trunk Sewer under 8th Ave. along Central Broadway - it's called the "Eighth Ave. Interceptor".


http://www.google.ca/url?sa=t&rct=j&q=&e...kzM0ZGcSOqndQ42Eg&bvm=bv.151426398,d.cGc

That's why 10th Ave. is the favourite for cut and cover.

Here is a map of the GVRD Trunk Sewers in the area:


http://www.metrovancouver.org/services/l...tions/2015LWMPBiennialReport-Summary.pdf


http://www.google.ca/url?sa=t&rct=j&q=&e...Kg0u1rxiJ-6qAMJXQ&bvm=bv.151426398,d.cGc

Last edited by officedweller; Apr 5, 2017 at 11:23 PM.
     
     
  #7860  
Old Posted Apr 5, 2017, 11:19 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by aberdeen5698 View Post
Yeah, it's still challenging for me to wrap my mind around the idea that such a complex, expensive machine has basically the same status as wooden forms for pouring concrete - you make them, use them, and then throw them away.
TBMs are rarely "thrown away" after a project because they are expensive to build.

They are usually dismantled at the extraction pit and shipped to a local storage yard where the owner has all the parts inspected, and where necessary repaired or reconditioned before the TBM is containerized and shipped off to the next project on its schedule.

It's next project may be across the city, across the province, across the country, across the continent, or across the ocean.

Scheduled projects for these machines can be assigned years in the future, and are constantly being adjusted as future projects arise (or flounder) with the changing political winds.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:03 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.