HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #5941  
Old Posted Feb 17, 2017, 4:28 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by swimmer_spe View Post
The plan isn't bad, but I till don't see how someone who wants LRT to the Glebe would be a fan of this. It doesn't go any closer.

Funny thing, if you convert the Transitways, you will get something like this plan.
The plan IS exactly the current plan with MOOSE.
Reply With Quote
     
     
  #5942  
Old Posted Feb 17, 2017, 6:53 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Quote:
Originally Posted by acottawa View Post
Also, the confederation line (because it is grade-separated) offers hope that a shorter overall trip. The tram was going to run on downtown streets and be held up by traffic lights, buses, etc.
Core-to-core trips will be LONGER, time-wise, with the route-stubbing.

Right now, going from, say, Beechwood Avenue to the Glebe, you can do it in one bus-boarding: take the 1 or the 7.

Post-LRT there will be a forced transfer thanks to the route-splitting fetishists. The bus trip time will be the same. There will be a forced transfer wait, which can vary from seconds to many minutes, depending on time of day/week, ambient weather or traffic conditions, or any of the other billion excuses OC Transpo has for current lousy service on core routes. Those factors will not change with LRT. And the LRT itself will not be a useful portion of any such Beechwood-Glebe trajectory.

This calculus is the same for almost every other within-the-core trip.

LRT will result in WORSE service between inner-city neighbourhoods.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5943  
Old Posted Feb 17, 2017, 7:01 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Still no station at Jasmine.

Goes to show you who this city council thinks are their priorities. Low-income, transit-dependent communities can get stuffed: 🞵🞵🞵🞵 LRT is for the suburbs.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5944  
Old Posted Feb 17, 2017, 7:17 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by Uhuniau View Post
Core-to-core trips will be LONGER, time-wise, with the route-stubbing.

Right now, going from, say, Beechwood Avenue to the Glebe, you can do it in one bus-boarding: take the 1 or the 7.

Post-LRT there will be a forced transfer thanks to the route-splitting fetishists. The bus trip time will be the same. There will be a forced transfer wait, which can vary from seconds to many minutes, depending on time of day/week, ambient weather or traffic conditions, or any of the other billion excuses OC Transpo has for current lousy service on core routes. Those factors will not change with LRT. And the LRT itself will not be a useful portion of any such Beechwood-Glebe trajectory.

This calculus is the same for almost every other within-the-core trip.

LRT will result in WORSE service between inner-city neighbourhoods.
Which is true if you live in an area served by multiple routes: Rideau Street, a small segment of St Laurent, a small segment of Beachwood, etc. Everyone else has always had to transfer, unless their origin and destination happened to be on the same route.
Reply With Quote
     
     
  #5945  
Old Posted Feb 17, 2017, 7:45 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Quote:
Originally Posted by acottawa View Post
Which is true if you live in an area served by multiple routes: Rideau Street, a small segment of St Laurent, a small segment of Beachwood, etc. Everyone else has always had to transfer, unless their origin and destination happened to be on the same route.
Until OC Transpo started truncating routes, there were many inner neighbourhood pairs that had single-bus ways of getting from A to B.

Post-LRT there will be almost none, other than those that are along the same axis but before the split point (e.g., OOS, Glebe, and Centretown on Bank; Centretown and the Burgs on Somerwellingmond; etc.) There will be no more single-bus trips possible past an LRT station or across the canal.

This is monumentally dumb.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5946  
Old Posted Feb 17, 2017, 7:50 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by Uhuniau View Post
Until OC Transpo started truncating routes, there were many inner neighbourhood pairs that had single-bus ways of getting from A to B.

Post-LRT there will be almost none, other than those that are along the same axis but before the split point (e.g., OOS, Glebe, and Centretown on Bank; Centretown and the Burgs on Somerwellingmond; etc.) There will be no more single-bus trips possible past an LRT station or across the canal.

This is monumentally dumb.
Yes, but unless someone lives near a stop served by multiple routes (which I assume you do), there is a pretty low chance that their local route would line up with their destination (i.e. that someone who lived on Montreal Rd. happened to want to go to Somerset/Richmond and not to Elgin, Bank, Bronson, Preston, Main, etc.)
Reply With Quote
     
     
  #5947  
Old Posted Feb 17, 2017, 7:54 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by Uhuniau View Post
Until OC Transpo started truncating routes, there were many inner neighbourhood pairs that had single-bus ways of getting from A to B.

Post-LRT there will be almost none, other than those that are along the same axis but before the split point (e.g., OOS, Glebe, and Centretown on Bank; Centretown and the Burgs on Somerwellingmond; etc.) There will be no more single-bus trips possible past an LRT station or across the canal.

This is monumentally dumb.
Not only are we focusing our transit increasingly on downtown, while our city is decentralizing, but when you go downtown, we are designing everything on the assumption that your destination is the Rideau Centre.

I am not sure how this really supports a transit culture, when you may want to use transit to go to your dentist, go out for an evening of entertainment, or go out for dinner. Let me check, but there are not many good restaurants in the Rideau Centre, not too many dentists, not too many entertainment locations in the mall either.
Reply With Quote
     
     
  #5948  
Old Posted Feb 17, 2017, 8:10 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Quote:
Originally Posted by acottawa View Post
Yes, but unless someone lives near a stop served by multiple routes (which I assume you do), there is a pretty low chance that their local route would line up with their destination (i.e. that someone who lived on Montreal Rd. happened to want to go to Somerset/Richmond and not to Elgin, Bank, Bronson, Preston, Main, etc.)
Most of the inner neighbourhoods and their main streets present multiple local routes as things stand now.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5949  
Old Posted Feb 17, 2017, 8:13 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Quote:
Originally Posted by lrt's friend View Post
Not only are we focusing our transit increasingly on downtown,
We are?

The line and stations currently under construction are it for LRT downtown, and that project is short one downtown station that should have been built but was scrapped because Jim Watson is a cheapskate who panders to the cheapskate suburbs.

The closest thing to any additional downtown service now on the books will be the one new station at Gladstone. That is it.

Every other inch of line and every other new station will be in not-downtown, and the city is systematically making local bus service in the core as useless, uncomfortable, impractical, and time-ineffecient as humanly possible.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5950  
Old Posted Feb 17, 2017, 8:25 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by Uhuniau View Post
Most of the inner neighbourhoods and their main streets present multiple local routes as things stand now.
Just Bank, Rideau and a small segments of Beechwood and Elgin.

Bronson, Somerset, Preston, Holland, Parkdale, Montreal, Gladstone, Main, St Patrick, Scott (normally) and Laurier are mostly served by a single route (or no routes), as are the local routes in neighbourhoods such as Sandy Hill, Carlington, Vanier, Overbrook, OOS, OOE, the Glebe.
Reply With Quote
     
     
  #5951  
Old Posted Feb 17, 2017, 10:33 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by Uhuniau View Post
Core-to-core trips will be LONGER, time-wise, with the route-stubbing.

Right now, going from, say, Beechwood Avenue to the Glebe, you can do it in one bus-boarding: take the 1 or the 7.

Post-LRT there will be a forced transfer thanks to the route-splitting fetishists. The bus trip time will be the same. There will be a forced transfer wait, which can vary from seconds to many minutes, depending on time of day/week, ambient weather or traffic conditions, or any of the other billion excuses OC Transpo has for current lousy service on core routes. Those factors will not change with LRT. And the LRT itself will not be a useful portion of any such Beechwood-Glebe trajectory.

This calculus is the same for almost every other within-the-core trip.

LRT will result in WORSE service between inner-city neighbourhoods.
I don't see these kind of core to core trips being very common. There is very little employment in either location. The cost of running such a service is prohibitive.
Reply With Quote
     
     
  #5952  
Old Posted Feb 17, 2017, 11:05 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,098
Quote:
Originally Posted by YOWetal View Post
I don't see these kind of core to core trips being very common. There is very little employment in either location. The cost of running such a service is prohibitive.
Many of those current routes break even at the farebox, or come closer to it than any others.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #5953  
Old Posted Feb 17, 2017, 11:21 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by Uhuniau View Post
We are?

The line and stations currently under construction are it for LRT downtown, and that project is short one downtown station that should have been built but was scrapped because Jim Watson is a cheapskate who panders to the cheapskate suburbs.

The closest thing to any additional downtown service now on the books will be the one new station at Gladstone. That is it.

Every other inch of line and every other new station will be in not-downtown, and the city is systematically making local bus service in the core as useless, uncomfortable, impractical, and time-ineffecient as humanly possible.
I knew you would misinterpret my comment. Focused on downtown in that we are consumed with getting people to and from downtown, ie commuter service.
Reply With Quote
     
     
  #5954  
Old Posted Feb 17, 2017, 11:23 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by YOWetal View Post
I don't see these kind of core to core trips being very common. There is very little employment in either location. The cost of running such a service is prohibitive.
I think the point here is making it easier in moving around various points in central neighbourhoods in general.

This is what the old streetcar network permitted and it also made it much easier to live without a car back in those years.

I think that should be our goal for the future to permit more people to live without a car especially if you choose to live in more central areas.
Reply With Quote
     
     
  #5955  
Old Posted Feb 18, 2017, 1:52 AM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by Uhuniau View Post
Still no station at Jasmine.

Goes to show you who this city council thinks are their priorities. Low-income, transit-dependent communities can get stuffed: 🞵🞵🞵🞵 LRT is for the suburbs.
I live near Jasmine. This is really 🞵🞵🞵🞵🞵🞵🞵 me off. We need a new councillor. He was pretty useless on this issue.

Last edited by Capital Shaun; Feb 18, 2017 at 1:53 AM. Reason: typo
Reply With Quote
     
     
  #5956  
Old Posted Feb 18, 2017, 2:39 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by Capital Shaun View Post
I live near Jasmine. This is really 🞵🞵🞵🞵🞵🞵🞵 me off. We need a new councillor. He was pretty useless on this issue.
We are really seeing who are the effective councillors and who are not. The councillors in Orleans have had a lot pull to get the extension all the way to Trim Road and they obviously been pushing to build to Moodie Drive for all those displaced DND workers living in Orleans.

The scary thing is if an austerity government is elected the next time in Ontario. That could blow all of this out of the water.

I feel for you having gone to Gloucester High and knowing the area very well.
Reply With Quote
     
     
  #5957  
Old Posted Feb 18, 2017, 2:55 AM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by lrt's friend View Post
We are really seeing who are the effective councillors and who are not. The councillors in Orleans have had a lot pull to get the extension all the way to Trim Road and they obviously been pushing to build to Moodie Drive for all those displaced DND workers living in Orleans.

The scary thing is if an austerity government is elected the next time in Ontario. That could blow all of this out of the water.

I feel for you having gone to Gloucester High and knowing the area very well.
I don't think city councillors had much to do with it I think the route is designed to appeal to key provincial and federal ridings.

Point two seems all but certain. Shovels in the ground didn't even save the Shepard extension so this would seem to be all in jeopardy post 2018.
Reply With Quote
     
     
  #5958  
Old Posted Feb 18, 2017, 4:23 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Brown has made pro-infrastructure spending part of his pitch. He spends a lot of time criticizing the Liberals for not having built GO RER; while that does show ignorance in that it ignores the fact that projects have lead times in design and planning, it does show commitment to transit.

While I can see a future government not making new promises, I have a hard time seeing a post-2018 government scrapping things already promised.
Reply With Quote
     
     
  #5959  
Old Posted Feb 18, 2017, 4:25 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Capital Shaun View Post
I live near Jasmine. This is really 🞵🞵🞵🞵🞵🞵🞵 me off. We need a new councillor. He was pretty useless on this issue.
Thankfully, the final version of the technical report did indicate that procurement would include requiring the line to protect for a future station at Gloucester High School. It's better than nothing and it means the fight is not over.
Reply With Quote
     
     
  #5960  
Old Posted Feb 18, 2017, 5:21 AM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by 1overcosc View Post
Thankfully, the final version of the technical report did indicate that procurement would include requiring the line to protect for a future station at Gloucester High School. It's better than nothing and it means the fight is not over.
I've known about the protected area for some time but come on, just build the station. If it's not done with Phase 2 it'll take 10, 20, or even 30 years more before someone else gets to it. Seems like a no-brainer to build a station there but politicians and planners are in their own world.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.