HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #921  
Old Posted Jan 21, 2017, 3:23 PM
poppa777 poppa777 is offline
Registered User
 
Join Date: Sep 2010
Location: Best city in the world, Calgary
Posts: 79
Mean while back at the Library ������
Reply With Quote
     
     
  #922  
Old Posted Jan 21, 2017, 4:00 PM
The Chemist's Avatar
The Chemist The Chemist is offline
恭喜发财!
 
Join Date: Aug 2001
Location: 中国上海/Shanghai
Posts: 8,875
Quote:
Originally Posted by suburbia View Post
Imaging ordering an LRT can that when it arrives in Calgary from Germany doesn't fit on the width of our track!
There's a bit of a difference. Track width is standardized worldwide (except for a few countries like Russia that use different gauge) - mistakes are far more likely with items that have custom measurements.
__________________
"Nothing is too wonderful to be true, if it be consistent with the laws of nature." - Michael Faraday (1791-1867)
Reply With Quote
     
     
  #923  
Old Posted Jan 21, 2017, 9:05 PM
Barnes's Avatar
Barnes Barnes is offline
Registered User
 
Join Date: Nov 2006
Posts: 273
Quote:
Originally Posted by suburbia View Post
Imaging ordering an LRT can that when it arrives in Calgary from Germany doesn't fit on the width of our track!
Considering Siemens Canada builds them in California, I would imagine it would go something like this....

'Where'd this German train come from?'
Reply With Quote
     
     
  #924  
Old Posted Jan 22, 2017, 12:20 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by The Chemist View Post
There's a bit of a difference. Track width is standardized worldwide (except for a few countries like Russia that use different gauge) - mistakes are far more likely with items that have custom measurements.
like a bridge LOL!
Reply With Quote
     
     
  #925  
Old Posted Jan 22, 2017, 12:22 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Suburgatory View Post
Solid finishing wood isn't cheap.
http://www.amwoodinc.com/pricelistlandv.aspx
That is not what the construction folks pay.
Reply With Quote
     
     
  #926  
Old Posted Jan 22, 2017, 3:07 AM
Suburgatory's Avatar
Suburgatory Suburgatory is offline
No man's land
 
Join Date: Feb 2016
Posts: 763
Quote:
Originally Posted by suburbia View Post
That is not what the construction folks pay.
And? Heard of wholesale and retail pricing? Trade pricing is usually in the range of 10-30% less, and up to 40% in some rare cases. Sure, there's potential for large volume pricing as well.

If you don't want to pay what a contractor is going to charge for materials, just set up your construction company, get yourself a truck and trade accounts at the dozens of places required to get all you need for the job. Then see what you get charged for hourly labour from skilled and in demand trades who can only earn on labour.

Yes, you'll get cases where full or partial discounts are passed along to the client. That's how the construction industry and many other material+labour industries work. You know when you get your car serviced, they don't actually pay that amount for those litres of oil?

Trade pricing is also about trades keeping loyalty commitments to their suppliers.
Reply With Quote
     
     
  #927  
Old Posted Jan 22, 2017, 5:33 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Suburgatory View Post
If you don't want to pay what a contractor is going to charge for materials, just set up your construction company, get yourself a truck and trade accounts at the dozens of places required to get all you need for the job. Then see what you get charged for hourly labour from skilled and in demand trades who can only earn on labour.
I think there needs to be more transparency in construction. The reality is, the labour charged and the project management overhead is already quite substantial. The fact there are kickbacks across the board make it worse. That's why often construction outfits do not get you the best product. They will go to a place that charges more for inferior product, as long as the kickback is bigger. That's why the industry is so big in Montreal.
Reply With Quote
     
     
  #928  
Old Posted Jan 22, 2017, 7:15 AM
Suburgatory's Avatar
Suburgatory Suburgatory is offline
No man's land
 
Join Date: Feb 2016
Posts: 763
Quote:
Originally Posted by suburbia View Post
I think there needs to be more transparency in construction. The reality is, the labour charged and the project management overhead is already quite substantial. The fact there are kickbacks across the board make it worse. That's why often construction outfits do not get you the best product. They will go to a place that charges more for inferior product, as long as the kickback is bigger. That's why the industry is so big in Montreal.
You really show when you're out of your element. Trade pricing is not a construction mafia "kickback".
Reply With Quote
     
     
  #929  
Old Posted Jan 22, 2017, 3:16 PM
Deepstar's Avatar
Deepstar Deepstar is offline
Registered User
 
Join Date: Mar 2007
Location: Canada
Posts: 6,291
Quote:
Originally Posted by suburbia View Post
I think there needs to be more transparency in construction. The reality is, the labour charged and the project management overhead is already quite substantial. The fact there are kickbacks across the board make it worse. That's why often construction outfits do not get you the best product. They will go to a place that charges more for inferior product, as long as the kickback is bigger. That's why the industry is so big in Montreal.
There needs to be transparency in banking where fat cats make millions upon millions.
Reply With Quote
     
     
  #930  
Old Posted Jan 22, 2017, 3:20 PM
speedog's Avatar
speedog speedog is offline
Moran supreme
 
Join Date: Sep 2010
Posts: 2,579
Quote:
Originally Posted by suburbia View Post
I think there needs to be more transparency in construction. The reality is, the labour charged and the project management overhead is already quite substantial. The fact there are kickbacks across the board make it worse. That's why often construction outfits do not get you the best product. They will go to a place that charges more for inferior product, as long as the kickback is bigger. That's why the industry is so big in Montreal.
Oh you are so out of the loop on what you speak of, it's not even worth debating the topic with you. Really, it would be nice of you to back your claims up with your own personal experiences on this topic but you either won't or can't. Oh well.
__________________
Just a wee bit below average prairie boy in Canada's third largest city and fourth largest CMA
Reply With Quote
     
     
  #931  
Old Posted Jan 22, 2017, 8:55 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Deepstar View Post
There needs to be transparency in banking where fat cats make millions upon millions.
I think the banking industry is a good parallel to construction. In banking, advisors need to be transpearant about kickbacks / fees relating to investment products they recommend. Construction is quite far behind - where the outfits do not tell clients that they receive kickbacks from suppliers, that they guide to certain suppliers in return for larger kickbacks from other suppliers, etc.
Reply With Quote
     
     
  #932  
Old Posted Jan 22, 2017, 8:56 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by speedog View Post
Oh you are so out of the loop on what you speak of, it's not even worth debating the topic with you. Really, it would be nice of you to back your claims up with your own personal experiences on this topic but you either won't or can't. Oh well.
Absolutely. Here is a great example of how the construction industry works:
http://montreal.ctvnews.ca/mr-sidewalk-alleged-mafia-middleman-speaks-at-quebec-inquiry-1.1160241
Reply With Quote
     
     
  #933  
Old Posted Jan 22, 2017, 9:02 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Suburgatory View Post
You really show when you're out of your element. Trade pricing is not a construction mafia "kickback".
Same essence with different terminology.

Customer talks to renovation outfit for doing a basement. High quality basement quoted at $50,000, broken out as follows:

- $25,000 suppliers
- $15,000 labour
- $10,000 (20%) management fee / claimed profit

The supplies are $25,000, but 30% goes back to the outfit, a total of an extra $7,500. The labour quoted at $15,000 based on outsourcing, but the outfit hires direct at half the rate, so another extra $7,500 back to the outfit. So not $10,000 profit, but $25,000 profit - a fully 100% on top of actual costs. But here is the additional backstory. The supplies, had for $17,500 (charged $25,000) could have been had for $15,000, but because the alternate supplier only kicked back 20%, which would only be $3,000 in the pocket of the construction mafia, the outfit will never go there, and you will never be told.

Back to the library please.
Reply With Quote
     
     
  #934  
Old Posted Jan 22, 2017, 9:38 PM
speedog's Avatar
speedog speedog is offline
Moran supreme
 
Join Date: Sep 2010
Posts: 2,579
Quote:
Originally Posted by suburbia View Post
Absolutely. Here is a great example of how the construction industry works:
http://montreal.ctvnews.ca/mr-sidewalk-alleged-mafia-middleman-speaks-at-quebec-inquiry-1.1160241
So you now believe because something happens in Quebec, that the construction industry as a whole across Canada is just as corrupt? Wow.
__________________
Just a wee bit below average prairie boy in Canada's third largest city and fourth largest CMA
Reply With Quote
     
     
  #935  
Old Posted Jan 22, 2017, 10:07 PM
Suburgatory's Avatar
Suburgatory Suburgatory is offline
No man's land
 
Join Date: Feb 2016
Posts: 763
Quote:
Originally Posted by speedog View Post
So you now believe because something happens in Quebec, that the construction industry as a whole across Canada is just as corrupt? Wow.
It's amazing. I think I have to put to rest suburbiapage.com.
Reply With Quote
     
     
  #936  
Old Posted Jan 22, 2017, 10:57 PM
Rollerstud98 Rollerstud98 is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,820
Quote:
Originally Posted by suburbia View Post
Same essence with different terminology.

Customer talks to renovation outfit for doing a basement. High quality basement quoted at $50,000, broken out as follows:

- $25,000 suppliers
- $15,000 labour
- $10,000 (20%) management fee / claimed profit

The supplies are $25,000, but 30% goes back to the outfit, a total of an extra $7,500. The labour quoted at $15,000 based on outsourcing, but the outfit hires direct at half the rate, so another extra $7,500 back to the outfit. So not $10,000 profit, but $25,000 profit - a fully 100% on top of actual costs. But here is the additional backstory. The supplies, had for $17,500 (charged $25,000) could have been had for $15,000, but because the alternate supplier only kicked back 20%, which would only be $3,000 in the pocket of the construction mafia, the outfit will never go there, and you will never be told.

Back to the library please.

So you're calling contractor pricing a kickback? Contractors get better pricing and then are able to charge retail pricing to a customer in order to make money while doing business. Otherwise, why be in business?
Reply With Quote
     
     
  #937  
Old Posted Jan 23, 2017, 1:09 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Rollerstud98 View Post
So you're calling contractor pricing a kickback? Contractors get better pricing and then are able to charge retail pricing to a customer in order to make money while doing business. Otherwise, why be in business?
In essence it is the same thing. I've had people bidding for projects come to me and explain their "profit" leaving out all the of the kickbacks. Indeed it is a kickback as was explained by another forum member who correctly highlighted that part of it was to ensure loyalty. Buy my inflated price material and I'll give you a bigger cut, and together we will screw the customer.

Last edited by suburbia; Jan 23, 2017 at 7:29 PM.
Reply With Quote
     
     
  #938  
Old Posted Jan 23, 2017, 6:25 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,123
Quote:
Originally Posted by suburbia View Post
Not a surprise. Calgary's construction industry is inept and can't measure / calculate. Challenges with The Bow's plates, building a bridge that was the wrong size over Shagganappi, and now this.
You're an idiot.
__________________
Git'er done!
Reply With Quote
     
     
  #939  
Old Posted Jan 23, 2017, 7:29 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Calgarian View Post
You're an idiot.
That was uncalled for.
Reply With Quote
     
     
  #940  
Old Posted Jan 23, 2017, 8:49 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by suburbia View Post
In essence it is the same thing. I've had people bidding for projects come to me and explain their "profit" leaving out all the of the kickbacks. Indeed it is a kickback as was explained by another forum member who correctly highlighted that part of it was to ensure loyalty. Buy my inflated price material and I'll give you a bigger cut, and together we will screw the customer.
That's not my experience. When I tendered a project, I would contact several contractors for each sub-trade, have a brief conversation about their capacity (i.e. could they meet our schedule?), if our product fit within their wheelhouse, some other admin stuff (safety, insurance, etc) and then would send them a tender package with drawings, specifications, preliminary schedule etc. Then everyone was told to give their best price. Then we make a decision based on their price, capacity, quality of work (if we had worked with them before, or what their references said about them) and our budget. If a supplier or contractor wants to lower their price to get the volume of sales from the job, that's their prerogative. Not sure where the kickbacks come in.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 7:06 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.