Quote:
Originally Posted by Millennium2002 View Post
On the switching part, Vancouver doesn't quite work like this. IIRC we use an older switching system that trips when the bus draws more current.
Those types of switches are typically used for situations where the bus can't be turning when the poles go over the switch. For example, ahead of a left turn lane where the bus must go through the switch well before the intersection.

The other type of switch is called a "Selectric" switch and it's used at corners where the trolley will cross the switch in the middle of a turn (if it's turning). The contactors ahead of the switch are staggered, and the switch will only activate if the trolley is at a substantial turn angle so that both poles cross the contactors at the same time. See this Wikipedia article.
     
     
  #15922  
Old Posted Jan 17, 2017, 2:17 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,684
     
     
  #15923  
Old Posted Jan 17, 2017, 5:55 PM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Just in:

Announcement on the 10 year investment plan to be live streamed on Facebook at 10:30am.

EDIT:
Imstagram story reveals that consultation for Broadway Extension and Surrey LRT are going to start January 24.

Last edited by Express691; Jan 17, 2017 at 6:05 PM.
     
     
  #15924  
Old Posted Jan 17, 2017, 7:57 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,717
Quote:
Originally Posted by Express691 View Post
Just in:

Announcement on the 10 year investment plan to be live streamed on Facebook at 10:30am.

EDIT:
Imstagram story reveals that consultation for Broadway Extension and Surrey LRT are going to start January 24.
The pictures on this tweet show that the Surrey LRT is only talking about the King George / 104 Avenue "L" LRT. The Surrey-to-Langley line doesn't mention LRT, which gives me hope that SkyTrain is still on the table for that phase.
     
     
  #15925  
Old Posted Jan 17, 2017, 10:44 PM
jacobparry jacobparry is offline
Registered User
 
Join Date: Sep 2015
Posts: 16
Anyone notice anything new in the TransLink Strategy Phase 1? I see some goodies promised by the Yes campaign in the referendum (B-line from Richmond to Metrotown), but not a whole lot else.

edit: so far I've spotted B-Lines on 41st Ave, Hastings, Fraser Hwy in Surrey and Marine Drive (from Dundarave to Phibbs) on the North Shore
by 2019, and in terms of capital projects from 2017-2018: a $61-million Burrard Stn upgrades and $168-million on new SkyTrain/Canada Line cars.

Last edited by jacobparry; Jan 17, 2017 at 11:05 PM.
     
     
  #15926  
Old Posted Jan 18, 2017, 12:11 AM
nickbeaulieu nickbeaulieu is offline
Registered User
 
Join Date: Dec 2013
Posts: 257
The LRT is such an idiotic choice. :/ hopefully the line out to langley is skytrain. Since it's just one straight run it would be nice if it's just an continuation of the expo line.

Quote:
Originally Posted by CanSpice View Post
The pictures on this tweet show that the Surrey LRT is only talking about the King George / 104 Avenue "L" LRT. The Surrey-to-Langley line doesn't mention LRT, which gives me hope that SkyTrain is still on the table for that phase.
     
     
  #15927  
Old Posted Jan 18, 2017, 1:13 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,964
Skytrain is still on the table. I believe currently the province and Langley both prefer Skytrain for the line out to Langley.

Again, everyone should just let the L line go, give Surrey their bone, but focus all energy on ensuring that the Langley extension is built as Skytrain (Expo Line). LRT to Langley makes no sense at all.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #15928  
Old Posted Jan 18, 2017, 1:15 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
I'm not completely opposed to LRT along the Surrey "L-line". My biggest concern is that we will end up essentially with a streetcar line, and not a proper LRT. In other words, I think we will be getting a system that is 100% at-grade, instead of a mix of over/underpasses where needed.

I think grade-separation will be needed at major crossings such as along King George at Fraser Highway, 96 Ave, 88 Ave and 72 Ave. The Surrey Central section will also be very slow if there isn't some significant separation through that area.

I'll post some maps of what I'm thinking when I get a chance...
     
     
  #15929  
Old Posted Jan 18, 2017, 1:19 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by urbancanadian View Post
I'm not completely opposed to LRT along the Surrey "L-line". My biggest concern is that we will end up essentially with a streetcar line, and not a proper LRT. In other words, I think we will be getting a system that is 100% at-grade, instead of a mix of over/underpasses where needed.

I think grade-separation will be needed at major crossings such as along King George at Fraser Highway, 96 Ave, 88 Ave and 72 Ave. The Surrey Central section will also be very slow if there isn't some significant separation through that area.

I'll post some maps of what I'm thinking when I get a chance...
that's exactly what Surrey is proposing: a glorified streetcar/tram that's rebranded as a LRT. It might have its own lane, but at the cost of existing road space so 104th will be down to 1 lane each way. There's no room to build overpass/underpass at all those intersections. Plus it'll drive the cost even higher.
     
     
  #15930  
Old Posted Jan 18, 2017, 1:26 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,653
Quote:
Originally Posted by ilikeredheads View Post
that's exactly what Surrey is proposing: a glorified streetcar/tram that's rebranded as a LRT. It might have its own lane, but at the cost of existing road space so 104th will be down to 1 lane each way. There's no room to build overpass/underpass at all those intersections. Plus it'll drive the cost even higher.
Quite honestly, TransLink should get their thumbs out of their asses and at least put traffic light priority on their B-Line attempt at bus rapid transit. Bus routes run with articulated buses, limited stops, and 5 minute frequencies is hardly trying.
     
     
  #15931  
Old Posted Jan 18, 2017, 1:40 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by jacobparry View Post
...so far I've spotted B-Lines on 41st Ave...
Oh wow, that's great. Right now I only get express service during rush hours when the #43 UBC B-Line is running.

I wonder if the #41 B-Line will replace the #43? Seems likely.
     
     
  #15932  
Old Posted Jan 18, 2017, 1:50 AM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Quote:
Originally Posted by cganuelas1995 View Post
Quite honestly, TransLink should get their thumbs out of their asses and at least put traffic light priority on their B-Line attempt at bus rapid transit. Bus routes run with articulated buses, limited stops, and 5 minute frequencies is hardly trying.
There's a few things - firstly, signal priority requires lower frequencies to work properly - cross traffic needs time to cross. And that cross traffic includes a not-insignificant number of Buses 20, 22, 8, 19, 3, 15, 17, 10, 16, 2, 7 & 4, and it's not unlikely to be the case that delaying those buses would cost translink more than delaying the packed-to-the-rafters 99 does
     
     
  #15933  
Old Posted Jan 18, 2017, 2:13 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
http://tenyearvision.translink.ca/phase-one/

there's 2 pdfs (one summary and the other is the full one) if you want to take a look.

skytrain and seabus improvemnts are already in effect since yesterday. Page 67 of the full pdf also includes a list of planned improvements to select bus routes.
     
     
  #15934  
Old Posted Jan 18, 2017, 2:39 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
As much as I dislike LRT, Surrey is not proposing a "glorified streetcar," it's proposing a bonafide LRT. The only difference between LRT and streetcars is that LRT's make fewer stops and travel in their own lane. That's it. So not having grade separation at major intersections does not make it less of an LRT. In fact, it's exactly what a typical LRT system would look like.
     
     
  #15935  
Old Posted Jan 18, 2017, 2:40 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by aberdeen5698 View Post
Oh wow, that's great. Right now I only get express service during rush hours when the #43 UBC B-Line is running.

I wonder if the #41 B-Line will replace the #43? Seems likely.
They've previously mentioned somewhere that yes, it will replace the 43. In practice, that just means the 43 would run all day under a different name. They're also likely to remove the Carnarvon Street stop too.
     
     
  #15936  
Old Posted Jan 18, 2017, 2:51 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by ilikeredheads View Post
http://tenyearvision.translink.ca/phase-one/

there's 2 pdfs (one summary and the other is the full one) if you want to take a look.
A couple things I've spotted so far:

* Update the 2011 assessment of a future high-capacity transit connection between SkyTrain and Burnaby Mountain campus. (pg 24)

* Undertake a major field study on coordinated bridge and road tolling options that improve on the existing system of uncoordinated bridge tolls. (pg 28)

* This Plan proposes the establishment of a new region-wide development fee to fund transit and transportation investments. The development fee would take the form of a Development Cost Charge (DCC) (pg 43)
     
     
  #15937  
Old Posted Jan 18, 2017, 2:54 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by GlassCity View Post
As much as I dislike LRT, Surrey is not proposing a "glorified streetcar," it's proposing a bonafide LRT. The only difference between LRT and streetcars is that LRT's make fewer stops and travel in their own lane. That's it. So not having grade separation at major intersections does not make it less of an LRT. In fact, it's exactly what a typical LRT system would look like.
The Surrey LRT plan does not have it travel in it's own lane - it's in shared center lanes. If they've changed that show me where.
     
     
  #15938  
Old Posted Jan 18, 2017, 3:21 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Sheba View Post
The Surrey LRT plan does not have it travel in it's own lane - it's in shared center lanes. If they've changed that show me where.
They've never changed it, because it was always intended to travel in exclusive lanes in the centre of the road. The only exception was that it was to travel in shared lanes through Green Timbers Park along Fraser Highway in order to avoid having to widen it. Really not sure where you heard that it would be running in shared lanes. I'd love for you to show me anywhere it says that. A couple sources include:

The LRT Page on Surrey's website:
"LRT will run along 104 Avenue, King George, and Fraser Highway, in its own dedicated lane in the centre of the road separate from traffic"
http://www.surrey.ca/city-services/19185.aspx

YouTube video from 5 years ago clearly highlighting exclusive lanes in the centre of the road:
Video Link


They had more detailed design in the Surrey Rapid Transit Study Design Guide, but that document seems to have been taken down from TransLink's website. I'm trying to find a cached copy now, but for now, the two examples above clearly show that as flawed as Surrey's LRT plans are, you really can't call it a glorified streetcar. It is legit LRT. The issue is that LRT sucks.

Last edited by GlassCity; Jan 18, 2017 at 3:45 AM.
     
     
  #15939  
Old Posted Jan 18, 2017, 3:25 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,964
Wow, the shared portion through the park makes the Langley LRT extension idea look that much worse... Seriously, it is a 16 km journey from King Edward to Langley.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #15940  
Old Posted Jan 18, 2017, 4:33 AM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Quote:
Originally Posted by GlassCity View Post
They've never changed it, because it was always intended to travel in exclusive lanes in the centre of the road. The only exception was that it was to travel in shared lanes through Green Timbers Park along Fraser Highway in order to avoid having to widen it. Really not sure where you heard that it would be running in shared lanes. I'd love for you to show me anywhere it says that. A couple sources include:

The LRT Page on Surrey's website:
"LRT will run along 104 Avenue, King George, and Fraser Highway, in its own dedicated lane in the centre of the road separate from traffic"
http://www.surrey.ca/city-services/19185.aspx

YouTube video from 5 years ago clearly highlighting exclusive lanes in the centre of the road:
Video Link


They had more detailed design in the Surrey Rapid Transit Study Design Guide, but that document seems to have been taken down from TransLink's website. I'm trying to find a cached copy now, but for now, the two examples above clearly show that as flawed as Surrey's LRT plans are, you really can't call it a glorified streetcar. It is legit LRT. The issue is that LRT sucks.
Wait, is running in a shared lane in Green Timbers still a thing?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.