HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #4081  
Old Posted Dec 9, 2016, 1:24 PM
pico pico is offline
Registered User
 
Join Date: Apr 2016
Posts: 12
uOttawa station, and campus. MacDonald Hall is gone!

     
     
  #4082  
Old Posted Dec 9, 2016, 1:54 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by Uhuniau View Post
Not all green spaces, plazas, or monuments are wastes of space.

But most of them are, especially the junk green spaces that Ottawa's been building in the post-war period and in the suburbs. And the endless monuments-by-committee are stultifying, dull, anywhereseville place-killers. I'd rather have another Tim Hortons than street-killing, life-sucking, pointless empty space.

Everyone who wants anything to be replaced with space (cf. the debate over the Daly site) should be forced to spend two hours some winter Saturday watching how people use one of the existing pointless open spaces.

(Hint: they don't.)
I tend to agree. While in some places spaces are done really well (the courtyards in the market, the plaza in front of WEP) or ok (city hall, National Gallery) in most cases they are windswept and boring. In Europe (or much of North America) public spaces are full of activity (markets, buskers, patios, people selling food) in Ottawa they tend to be a bunch of grass or pavement with maybe a 14-pack of flags and not much else going on (Confederation Square, the foot of the portage bridge, the war museum, york street, the future national geographic pavilion, bank of canada, nelson mandela square, sparks street, Tunney's pasture).
     
     
  #4083  
Old Posted Dec 9, 2016, 4:28 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by acottawa View Post
I tend to agree. While in some places spaces are done really well (the courtyards in the market, the plaza in front of WEP) or ok (city hall, National Gallery) in most cases they are windswept and boring. In Europe (or much of North America) public spaces are full of activity (markets, buskers, patios, people selling food) in Ottawa they tend to be a bunch of grass or pavement with maybe a 14-pack of flags and not much else going on (Confederation Square, the foot of the portage bridge, the war museum, york street, the future national geographic pavilion, bank of canada, nelson mandela square, sparks street, Tunney's pasture).
York and Sparks are OK, and have the key to a successful open space: that it actually be closed. That is, enclosed; surrounded by tightly-knit, dense, fine-grained non-open spaces. Buildings. Things human beings use and do.

That's why parks like Dundonald or Minto are so great. It's also why edge-vacuum parks and plazas are so dull and city-killing. Some of them may have other merits, such as shoreline protection or other environmental values, but people places, they are not.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #4084  
Old Posted Dec 9, 2016, 5:14 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
so about that light rail transit system we're building...
     
     
  #4085  
Old Posted Dec 9, 2016, 5:48 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,685
Construction Update
Week of December 5


This week, crews mobilize to begin concrete final lining pours in Parliament Station cavern, drill micro-piles at Lees Station, and begin installing the composite panels at Cyrville Station. The Overhead Catenary System continues to be energized in phases for ongoing vehicle testing along the guideway between Belfast Yard and Blair Station.




West Stations

Tunney’s Pasture Station: Crews continue drilling caissons in preparation for the next phase of station construction.

Bayview Station: Station foundation construction activities are progressing with crews forming columns, continuing underground mechanical and electrical work, and building the retaining wall.

Pimisi Station: Crews continue forming and pouring the lower concourse slab, installing grade beams, backfilling and constructing footings.




Lyon Station cavern: The station continues to take shape with crews forming outside walls, installing steel posts and beginning to layout the masonry block walls in the mechanical room, part of architectural work. In the transition, rebar is installed for the concourse wall.

Lyon Station west entrance: Crews continue constructing station and elevator walls by installing formwork and rebar, followed by concrete pours. Work at the east vent shaft is ongoing and includes rock removals, rock bolt installation and concrete work.

Lyon Station east entrance: Construction of the station entrance progresses with concrete work for the ground floor slab and beams for the escalators. Work at the HVAC shaft includes insulation and installation of the winter protection.

Parliament Station cavern: Work includes installing rebar for footing and walls, and ongoing formwork on the columns, which are followed by concrete pours this week. Concrete final lining mobilization also occurs. In the running tunnel, crews continue final work on the invert and construction of the starter wall.

Parliament Station west entrance: Crews continue to mobilize for future masonry and glazing for the station’s head house. Rock support and installation of rock bolts occur at the east vent shaft.




Rideau Station cavern: Station construction progresses and includes rebar installation and concrete work for station walls in addition to waterproofing activities. Clean-ups also take place to begin the next phase of concrete work in the station.

Rideau Station west entrance: Crews build insulated walls inside the Rideau Centre, part of integrated entrance construction and begin shoring. Excavation and installation of reinforcements occur outside at the HVAC shaft. Shoring also begins for the west vent shaft.

Rideau Station east entrance: Concrete pours are ongoing at the entrance, including for station and elevators walls, as well as slabs and stairs.

Rideau Street, currently closed 24/7 to vehicular traffic to permit works to advance, including jet grouting activities, is anticipated to reopen as early as December 16.

uOttawa Station: Foundation work, electrical rough-ins, and construction of station walls and slabs are ongoing, in anticipation of structural steel installation in the new year.

East Portal: Crews mine the ramp and begin installing rebar and formwork the next section of mud slab.




East Stations

Lees Station: Station construction advances with crews micro-piling, installing rebar and pouring concrete for foundation walls.

Hurdman Station: This week, crews mobilize to begin installing structural steel for the station, and continue welding and installing steel on stairs. Other station activities include electrical and mechanical work, as well as work on the roof. The bus operators’ building continues to take shape with ceiling framing and panel installations.




Tremblay Station: Crews begin working on the station roof, in addition to painting the basement rooms and ongoing mechanical rough-ins.

St-Laurent Station: The station continues to take shape with ongoing steel installation for the plenum, work on the elevators and final work on the hydro room.

Cyrville Station: Station construction progresses with crews installing metal composite panels this week, working on the station elevators, continuing glazing and installing porcelain panels on the auxiliary building.

Blair Station: Crews waterproof the stairs and install porcelain tiles in sections as well as continue framing and installing composite panels. Other station activities include electrical work on the elevators and escalator and conduit installation at the platform level. Roofing begins at the bus operators’ building.




Tunnel Excavation and Support

Reinforcements and mining of the last section of running tunnel west of Rideau Station is ongoing.




Guideway

Tunney’s Pasture Station to West Portal: Guideway construction advances and includes the installation of Overhead Catenary System foundations, electrical work for the traction power sub stations, and ongoing removal of parapet walls just west and east of Bayview Bridge.

Mann Avenue Bridge: Bridge construction is ongoing and includes work on parapet and wing walls

Mann Avenue Bridge to west of Tremblay Station: Crews complete the Overhead Catenary System foundations west of Lees Station, install concrete ties, pull rail and continue tamping in sections along the guideway.

The Overhead Catenary System continues to be energized in phases for ongoing vehicle testing along the guideway between Belfast Yard and Blair Station.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Lyon Station west vent shaft work resumes.
  • Rideau Street reopens to bus traffic
  • Structural steel installation at uOttawa Station.
  • Installation of the traction power sub station on the guideway west of Lees Station and east of Hurdman Station.
  • Fencing installation on guideway just west of Tremblay Station.

http://www.ligneconfederationline.ca/construction/construction-update-102/
     
     
  #4086  
Old Posted Dec 9, 2016, 6:12 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by rocketphish View Post
Construction Update
Week of December 5





Guideway

Tunney’s Pasture Station to West Portal: Guideway construction advances and includes the installation of Overhead Catenary System foundations, electrical work for the traction power sub stations, and ongoing removal of parapet walls just west and east of Bayview Bridge.

Mann Avenue Bridge: Bridge construction is ongoing and includes work on parapet and wing walls

Mann Avenue Bridge to west of Tremblay Station: Crews complete the Overhead Catenary System foundations west of Lees Station, install concrete ties, pull rail and continue tamping in sections along the guideway.

The Overhead Catenary System continues to be energized in phases for ongoing vehicle testing along the guideway between Belfast Yard and Blair Station.

http://www.ligneconfederationline.ca/construction/construction-update-102/
I'm hoping it's just the angle that this photo was taken from, but this picture makes it look like the platform is going to be too high for the doors on the train. A normal person would say "there's no way they could make such an obvious mistake", but the cynic in me noticed it.
     
     
  #4087  
Old Posted Dec 9, 2016, 6:30 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Some of these photos should be printed off and sent to any other city that's building a BRT system on the false promise of its cheap-and-easy future conversion to LRT.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #4088  
Old Posted Dec 9, 2016, 6:52 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,697
Quote:
Originally Posted by kmcamp View Post
I'm hoping it's just the angle that this photo was taken from, but this picture makes it look like the platform is going to be too high for the doors on the train. A normal person would say "there's no way they could make such an obvious mistake", but the cynic in me noticed it.
It's an optical illusion. The bottom half below the dark line is a horizontal surface, only the part above is the vertical rise.

Having said that, they really should invest in better cameras to document a $2.1 billion project
     
     
  #4089  
Old Posted Dec 9, 2016, 7:01 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Uhuniau View Post
Some of these photos should be printed off and sent to any other city that's building a BRT system on the false promise of its cheap-and-easy future conversion to LRT.
Counter-point, we didn't actually have to go to a full-scale-metro-with-lrt-vehicles, we could have kept the original transitway stations, and gone with a Citadis model meant for tighter curves. We could have even kept it dual mode with buses. We chose (rightly or wrongly) to go the path with the most extensive conversion.
     
     
  #4090  
Old Posted Dec 9, 2016, 7:54 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Uhuniau View Post
Some of these photos should be printed off and sent to any other city that's building a BRT system on the false promise of its cheap-and-easy future conversion to LRT.
Like Mississauga and Winnipeg?
     
     
  #4091  
Old Posted Dec 9, 2016, 7:57 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by Uhuniau View Post
Some of these photos should be printed off and sent to any other city that's building a BRT system on the false promise of its cheap-and-easy future conversion to LRT.
If you think $2.1 billion for a 12 station line that's fully grade separated is expensive, you should go visit Toronto and ask them about a little something called the "one stop Scarborough subway."

We're doing not so bad in the grand scheme of things.
     
     
  #4092  
Old Posted Dec 9, 2016, 9:11 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by acottawa View Post
I tend to agree. While in some places spaces are done really well (the courtyards in the market, the plaza in front of WEP) or ok (city hall, National Gallery) in most cases they are windswept and boring. In Europe (or much of North America) public spaces are full of activity (markets, buskers, patios, people selling food) in Ottawa they tend to be a bunch of grass or pavement with maybe a 14-pack of flags and not much else going on (Confederation Square, the foot of the portage bridge, the war museum, york street, the future national geographic pavilion, bank of canada, nelson mandela square, sparks street, Tunney's pasture).
I agree on a few fronts, but Confederation Square is an iconic part of Ottawa. And out of respect for what the War Memorial represents, there isn't much we can do to "activate" the space.

Bank of Canada's Square was an empty, barren area, but with the new additions like the museum's entrance, it is greatly improve.
     
     
  #4093  
Old Posted Dec 9, 2016, 10:31 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by J.OT13 View Post
I agree on a few fronts, but Confederation Square is an iconic part of Ottawa. And out of respect for what the War Memorial represents, there isn't much we can do to "activate" the space.

Bank of Canada's Square was an empty, barren area, but with the new additions like the museum's entrance, it is greatly improve.
That is a good point, the northern part of the square could be treated differently than the southern half, with "animation" going south of sparks.
     
     
  #4094  
Old Posted Dec 9, 2016, 10:46 PM
FFX-ME's Avatar
FFX-ME FFX-ME is offline
Registered User
 
Join Date: Oct 2006
Posts: 1,053
Quote:
Originally Posted by swimmer_spe View Post
Like Mississauga and Winnipeg?
And Quebec city now.
     
     
  #4095  
Old Posted Dec 10, 2016, 5:38 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by FFX-ME View Post
And Quebec city now.
I didn't think they started construction yet.
     
     
  #4096  
Old Posted Dec 11, 2016, 6:40 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,697
I'm a little puzzled by the discrepancy between the Lyon station renders and the construction photos. In the renders they show bulky columns down the centre but it seems like they're not building it that way. Or is this a different part of the concourse?



     
     
  #4097  
Old Posted Dec 11, 2016, 10:25 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Kitchissippi View Post
I'm a little puzzled by the discrepancy between the Lyon station renders and the construction photos. In the renders they show bulky columns down the centre but it seems like they're not building it that way. Or is this a different part of the concourse?



Maybe those columns are not going to actually support anything. Or, maybe, they no longer need them and will not have them.
     
     
  #4098  
Old Posted Dec 12, 2016, 5:08 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by J.OT13 View Post
I agree on a few fronts, but Confederation Square is an iconic part of Ottawa. And out of respect for what the War Memorial represents, there isn't much we can do to "activate" the space.
Agree. There's space in a city, esp. a capital, for monumental space, and apart from the horriblosity that is the NAC, Confederation Square serves that purpose quite admirably. (There's nothing wrong with the NAC that the current renovation will fix.)

Quote:
Bank of Canada's Square was an empty, barren area, but with the new additions like the museum's entrance, it is greatly improve.
I'm not convinced. The Bank square did OK during the summer when office workers ate their lunches there. Could have been improved, but not sure that the renos are the answer. An outdoor restaurant - perhaps on a rotating basis, with different kitchens or different culinary themes - might have been a good project there.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #4099  
Old Posted Dec 12, 2016, 5:11 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by passwordisnt123 View Post
If you think $2.1 billion for a 12 station line that's fully grade separated is expensive, you should go visit Toronto and ask them about a little something called the "one stop Scarborough subway."

We're doing not so bad in the grand scheme of things.
I don't think $2.1-billion for the current Ottawa LRT is expensive; it's actually a pretty cost-effective project, esp. considering a good chunk of it is actually thinly-veiled road projects.

The issue is that the 1980s-era BRT that is the foundation of the LRT project was sold as cheap-and-easy-to-convert-to-rail, which it was neither. Ottawa ought to have gone with LRT from the beginning, and not wasted so much cash or three decades of city-building.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #4100  
Old Posted Dec 12, 2016, 2:30 PM
HighwayStar's Avatar
HighwayStar HighwayStar is online now
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
Quote:
Originally Posted by Uhuniau View Post
I don't think $2.1-billion for the current Ottawa LRT is expensive; it's actually a pretty cost-effective project, esp. considering a good chunk of it is actually thinly-veiled road projects.

The issue is that the 1980s-era BRT that is the foundation of the LRT project was sold as cheap-and-easy-to-convert-to-rail, which it was neither. Ottawa ought to have gone with LRT from the beginning, and not wasted so much cash or three decades of city-building.
Well.... I would suspect that a very healthy chunk of the $2.1B is for the tunnel, which is absolutely the correct thing to do now, but would have been completely impractical and infeasible back in the 1980s.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:12 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.