Quote:
Originally Posted by mersar
It was mentioned a year or so back in a city report to council I believe that there actually is a breakout panel in the tunnel west of Westbrook station to allow the spur to be built eventually, but thats it. Of course if they are going back on that now it makes me wonder what the truth actually is.
|
Says the above-linked report:
Quote:
|
The preferred location for a turnout connecting WLRT to 37 Street SW would be from the tunnel section west of the Westbrook Station. However, there is a 224m vertical curve in this location that precludes installation of a turnout. Accommodating a turnout at this point would entail reconstruction of the existing tunnel section of the LRT, a lengthy, disruptive and expensive proposition. The existing LRT tunnel box would have to be exposed and the track grade would need to be re-profiled from west of Westbrook Station to about 39 Street. This construction disruption would likely be in excess of one year and cost over $100 million.
|
Obviously accommodating it inside the tunnel at construction time wouldn't have cost $100 million, but that gives some insight as to why they
may have avoided it at the time.