Quote:
Originally Posted by MalcolmTucker
I'm sure they will finish a new system of connections to the High Level just in time for the High Level pedestrian paths to be closed for full life cycle and expansion. It is the Edmonton way.
|
Likely. They also stopped the 100 ave lanes at the arbitrary Downtown border rather than making the rational connections west to the existing bike route past 116St.
It's a start, that's all.