Quote:
Originally Posted by red-paladin
Has Surrey zoned enough land for actual office buildings in Surrey Centre though?
Sure seems like it's going to be built out with a lot of medium sized residential towers and it'll be impossible to be a proper secondary downtown.
|
CD allows for zoning just office. So the hubs around Gateway, Surrey Central, and King George can have dedicated just office towers. Or mixed use. It comes down to the developer. It seems right now developers are opting for mix use aka Retail/Office at the bottom, residential at the top.
But there are a few projects still technically on the books that are full office including Holland Point across the street from King George Station, and Phase C of The HUB next to King George which both call for 2 dedicated office towers. Phase B of The HUB is also a little closer to just office but it still has residential in it.
There's plenty of space though and if I were educated guessing, if Surrey starts to see Office Tower construction it will be around King George or Surrey Central nearer to the mall. That said, mixed use seems to be the flavor of the month now and quite frankly I don't see a huge deal with it. A lot of major cities are moving away from having dedicated "Office" districts. And quite frankly the "Office" district in downtown Vancouver is dead after 7pm. You can fire a canon around Burrard Station and not hit anyone in the evening. So from a vibrancy standpoint, I think having mixed use makes a central core more robust.
But CD zoning allows for it I guess is the short answer for you.