HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #8581  
Old Posted Sep 17, 2016, 8:52 AM
Rico Rommheim's Avatar
Rico Rommheim Rico Rommheim is offline
 
Join Date: Jun 2007
Posts: 13,933
Quote:
Originally Posted by SkahHigh View Post
AMT's new Mansfield Terminal under construction.

Prime real estate for a 200+ tower. Maybe one day they could build on top of what I presume will be a very underwhelming structure.
     
     
  #8582  
Old Posted Sep 17, 2016, 1:12 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
 
Join Date: Jul 2013
Posts: 3,794
Quote:
Originally Posted by Rico Rommheim View Post
Prime real estate for a 200+ tower. Maybe one day they could build on top of what I presume will be a very underwhelming structure.
It's temporary after all... I doubt it'll be useful when the REM opens.
     
     
  #8583  
Old Posted Sep 17, 2016, 2:23 PM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
 
Join Date: Aug 2005
Posts: 11,375
Doesn't this project seem to be moving a bit fast? It seems like we only heard about it a few months ago.
     
     
  #8584  
Old Posted Sep 17, 2016, 2:48 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
 
Join Date: Jul 2013
Posts: 3,794
Quote:
Originally Posted by Nouvellecosse View Post
Doesn't this project seem to be moving a bit fast? It seems like we only heard about it a few months ago.
The REM or the Mansfield Terminal?
     
     
  #8585  
Old Posted Sep 17, 2016, 3:54 PM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
 
Join Date: Aug 2005
Posts: 11,375
Oh I was thinking the Mansfield terminal was part of the REM project. Never mind...
     
     
  #8586  
Old Posted Sep 18, 2016, 5:54 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
 
Join Date: Jul 2013
Posts: 3,794
Quote:
Originally Posted by Nouvellecosse View Post
Oh I was thinking the Mansfield terminal was part of the REM project. Never mind...
It's a temporary AMT bus terminal for South Shore buses because the one under 1000 de la Gauchetiere is over capacity. Once the REM is operational, most buses won't cross the Champlain Bridge so that terminal will probably be useless.
     
     
  #8587  
Old Posted Sep 18, 2016, 6:38 PM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
 
Join Date: Aug 2005
Posts: 11,375
Ok, that makes more sense, thanks!
     
     
  #8588  
Old Posted Sep 19, 2016, 6:43 AM
Kokkei Mizu's Avatar
Kokkei Mizu Kokkei Mizu is offline
 
Join Date: Aug 2010
Posts: 447
High Level Bridge Streetcar in Edmonton:

• Video Link
     
     
  #8589  
Old Posted Sep 20, 2016, 4:35 AM
CalgaryCheese CalgaryCheese is offline
 
Join Date: Aug 2016
Posts: 80
Awesome! ^^^
     
     
  #8590  
Old Posted Sep 20, 2016, 2:11 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
 
Join Date: Aug 2002
Posts: 34,204
There will be a crossover at the tunnel on Eglinton, so if there is an issue like this in Scarborough, the entire line will not have to shut down.

http://www.cbc.ca/beta/news/canada/calga...railment-tuscany-lrt-sept-2016-1.3770235

Things like this remind me why I hate Scarborough, I should hate Etobicoke too, but it doesn't even take up a third of the space.
     
     
  #8591  
Old Posted Sep 20, 2016, 2:39 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
 
Join Date: Sep 2002
Posts: 22,898
I really hope they include a few more crossovers and storage tracks on the Eglinton line. I recall Scarborough being about 50% bigger than Etobicoke with 100% more population. It definitely was not 3 plus times bigger than Etobicoke.
     
     
  #8592  
Old Posted Sep 20, 2016, 2:53 PM
niwell's Avatar
niwell niwell is offline
 
Join Date: Nov 2004
Posts: 11,657
Whoa, that LRV in Calgary must have had a fair amount of speed to derail that far past the end of the tracks. It looks like fully 2/3rds of the train made it off. Curious as to how that would happen - I would have thought the signalling system would have automatically engaged the brakes. Which could be completely wrong!
     
     
  #8593  
Old Posted Sep 20, 2016, 11:15 PM
People.talking's Avatar
People.talking People.talking is offline
 
Join Date: Feb 2016
Posts: 236
Quote:
Originally Posted by niwell View Post
Whoa, that LRV in Calgary must have had a fair amount of speed to derail that far past the end of the tracks. It looks like fully 2/3rds of the train made it off. Curious as to how that would happen - I would have thought the signalling system would have automatically engaged the brakes. Which could be completely wrong!
The train got to 60 kph before it derailed.
     
     
  #8594  
Old Posted Sep 21, 2016, 2:27 AM
CalgaryCheese CalgaryCheese is offline
 
Join Date: Aug 2016
Posts: 80
Quote:
Originally Posted by niwell View Post
Whoa, that LRV in Calgary must have had a fair amount of speed to derail that far past the end of the tracks. It looks like fully 2/3rds of the train made it off. Curious as to how that would happen - I would have thought the signalling system would have automatically engaged the brakes. Which could be completely wrong!
I may be wrong, but apparently they sometimes park trains rather close together on that section of track and that regular running trains shouldn't be there anyway, and because they often park trains rather close together they didn't have some of the safety stuff there.
     
     
  #8595  
Old Posted Sep 21, 2016, 8:26 PM
Kisai Kisai is offline
 
Join Date: Jun 2014
Posts: 1,154
Quote:
Originally Posted by niwell View Post
Whoa, that LRV in Calgary must have had a fair amount of speed to derail that far past the end of the tracks. It looks like fully 2/3rds of the train made it off. Curious as to how that would happen - I would have thought the signalling system would have automatically engaged the brakes. Which could be completely wrong!
It has a driver, people are fallible. Does the C-train have any kind of protection signalling or is it just to prevent the trains from running into each other?
     
     
  #8596  
Old Posted Sep 21, 2016, 9:00 PM
red-paladin red-paladin is offline
 
Join Date: Sep 2008
Posts: 3,626
Skytrain routes are changing in advance of the Evergreen Extension opening in December:

• Video Link


     
     
  #8597  
Old Posted Sep 21, 2016, 9:01 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
 
Join Date: Sep 2002
Posts: 22,898
Quote:
Originally Posted by Kisai View Post
It has a driver, people are fallible. Does the C-train have any kind of protection signalling or is it just to prevent the trains from running into each other?
So what if people are fallible. So to can automation.
     
     
  #8598  
Old Posted Sep 21, 2016, 10:11 PM
GreaterMontréal's Avatar
GreaterMontréal GreaterMontréal is offline
 
Join Date: Dec 2013
Posts: 4,628
     
     
  #8599  
Old Posted Sep 22, 2016, 12:27 AM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
 
Join Date: Nov 2014
Posts: 10,726
     
     
  #8600  
Old Posted Sep 27, 2016, 8:23 PM
thmx
 
Posts: n/a
Content removed
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 1:37 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.