Quote:
Originally Posted by J_M_Tungsten
The Sinclair
The new Jewel is topped out. I assume that will open much sooner than the tower.
|
Yes, I think completion of the Jewel & garage superstructure (not including facade or interior) was scheduled for early August, and the tower superstructure will be in December/January. Moving fast!
Here (scroll down one screen) is a great time-lapse cam btw:
http://sinclairapts.com