Quote:
Originally Posted by Urban recluse
So one tower gets built there--sooner, great. They can move on to another of the many, many sites around the downtown which need developing.
|
True. But will they? Or will they say "it's easier to do this in Toronto"? I'm inclined to think they may only do this one property in Winnipeg. Or if they planned for 4, now just 2. Theoretically, since this is all forum speculation, I think Winnipeg benefits most if they can make a big project happen. However, I don't want Winnipeg to lose a project altogether if 44 storeys becomes unfeasible.
Quote:
Originally Posted by design25
Really? Build a shorter building so it can be built sooner? What a ridiculous concept. What do they tell the 30+ people who have bought units on the top 5 floors? "Sorry, we're in a hurry, so you need to forget about living here. Here's your 2 million dollars in deposits back"
Anyone who has bought a condo at SkyCity knows that it is planned to be completed in October of 2019. It's right there in black and white in the contract. This is the timeline every last one of the residents has planned for. There is still plenty of time to sell the less than 30 more units they had planned to sell before the end of 2016.
|
Doesn't matter when they PLAN to complete it... Construction financing requires 50% presales, and only then can they build. They've been sitting in this 150-160 (advertised) range for a while. Keep in mind, they still have to SELL A LOT of units past that to actually profit... depending on their bonds/financial exit strategy.
Nonetheless, if the top floors are selling well, they'l keep those. They'll instead Jenga out some less desired floors below.
Quote:
Originally Posted by Urban recluse
Hurry? This project was announced years ago. It would not be the first project in history to be reduced in scale for construction to be realized. Aspirations are great, but shaving off a few floors is no big deal. It is critical to get people living here sooner.
|
Yes. 100%
Quote:
Originally Posted by drew
For the price they paid on the lot, I don't think they can go with a smaller building. They would need to sell enough units at a certain price to get their profit out.
If they did make the building smaller, the price per unit would likely have to increase to compensate.
|
Correct me if i'm wrong, but I thought they got the lot at some flea market type price? No idea where I heard that from. Either way, I figured perhaps that's why they could sell some units under 200k.
Quote:
Originally Posted by design25
If they cut 5 floors, there would no longer be a 41, 42, 43, 44 or 45th floor. That's what I meant.
It's extremely unlikely that they will shorten the building in any case. Just because one forum member
posited this idea doesn't mean it's likely to happen. How do these ideas gain traction? sheesh
|
It's just an idea that we all know won't reach the ears of the developers.
Nonetheless, it's VERY common for a developer to downsize, and downtown Winnipeg is a size-me-down market