HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9741  
Old Posted Jul 10, 2016, 10:33 PM
Genauso's Avatar
Genauso Genauso is offline
A hole being Doug
 
Join Date: Dec 2013
Posts: 498
edit: moving this to the General Transit thread

Last edited by Genauso; Jul 10, 2016 at 10:39 PM. Reason: parallel discussions
     
     
  #9742  
Old Posted Jul 10, 2016, 10:46 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Genauso View Post
edit: moving this to the General Transit thread
Please provide a link to where we can follow it.
     
     
  #9743  
Old Posted Jul 11, 2016, 2:02 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,093
Quote:
Originally Posted by swimmer_spe View Post
Please provide a link to where we can follow it.
How many Metro Vancouver general transit discussions do you think we have?
     
     
  #9744  
Old Posted Jul 13, 2016, 8:03 PM
Large Cat's Avatar
Large Cat Large Cat is offline
Vancouver Bus Driver
 
Join Date: Oct 2014
Location: Vancouver, BC
Posts: 396
Quote:
Originally Posted by swimmer_spe View Post
You are right, the cost to build the bridge would be quite high.

The travel time is not bad on the Seabus, yet. I could see a Line going through North Vancouver being built. It could simply connect the Seabus Terminal to the other places on the North Shore. Lonsdale Quay could become what the Waterfront Station is today.

This makes a lot of sense to me. The seabus travel time is fine, it's just the frequency mixed with the bus connections that sucks. The frequency can be improved with more boats, and an E-W Skytrain on the north shore from park royal to phibbs area can take care of the transfers. High frequency on both sides and in the middle. No need to build a bridge.
     
     
  #9745  
Old Posted Jul 14, 2016, 4:47 AM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
Has a final decision been made on where trains coming off the Expo line will terminate before going back to rejoin the line at Columbia? I heard Lougheed but also University.
     
     
  #9746  
Old Posted Jul 14, 2016, 5:16 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
Quote:
Originally Posted by Trainguy View Post
Has a final decision been made on where trains coming off the Expo line will terminate before going back to rejoin the line at Columbia? I heard Lougheed but also University.
According to all the recent diagrams, Expo Line trains will turn back at Production Way-University.
     
     
  #9747  
Old Posted Jul 15, 2016, 7:52 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
They have 2 Mark II trains on the Evergreen Line in Coquitlam today for testing & commissioning. 201-202 and 203-204, in addition to the existing Mark I trains.
     
     
  #9748  
Old Posted Jul 16, 2016, 10:59 PM
mrtinvan mrtinvan is offline
Registered User
 
Join Date: Aug 2015
Posts: 19
Quote:
Originally Posted by dpogue View Post
They have 2 Mark II trains on the Evergreen Line in Coquitlam today for testing & commissioning. 201-202 and 203-204, in addition to the existing Mark I trains.
Are they running fully automated trains yet or just running them manually?
     
     
  #9749  
Old Posted Aug 2, 2016, 6:29 PM
SkytrainCar026's Avatar
SkytrainCar026 SkytrainCar026 is offline
Registered User
 
Join Date: Jul 2016
Location: Richmond, BC
Posts: 95
I checked the Evergreen Line construction camera website and found that one of the cameras had taken some pictures of test trains!

This one was taken at 11am today (looking North on Pinetree)


This one was taken at 10:30am on Pinetree (looking south)


Source: http://wcs.pbaeng.com/projects/R1_Transit

Last edited by SkytrainCar026; Aug 2, 2016 at 6:31 PM. Reason: I fixed the "captions" for the photos, which stated that the picture looking North was actually south and vice versa.
     
     
  #9750  
Old Posted Aug 2, 2016, 7:41 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,733
Cool, thanks.
I guess the tracks through the tunnel are still unfinished and they had to truck the MKII over? (like they did for the MKI)?
     
     
  #9751  
Old Posted Aug 2, 2016, 7:43 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,098
Quote:
Originally Posted by officedweller View Post
Cool, thanks.
I guess the tracks through the tunnel are still unfinished and they had to truck the MKII over? (like they did for the MKI)?
They finished the track before the tunnel. The line was already physically connected more than a months ago.
     
     
  #9752  
Old Posted Aug 2, 2016, 8:33 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,733
Thanks.
So if the track was in place but no systems infrstructure, I guess they just towed it through the tunnel.
     
     
  #9753  
Old Posted Aug 2, 2016, 8:37 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
When is the line expected to be operational?
     
     
  #9754  
Old Posted Aug 2, 2016, 10:18 PM
SkytrainCar026's Avatar
SkytrainCar026 SkytrainCar026 is offline
Registered User
 
Join Date: Jul 2016
Location: Richmond, BC
Posts: 95
Quote:
Originally Posted by swimmer_spe View Post
When is the line expected to be operational?
The Evergreen line will be open in "Early 2017." That could mean anywhere between January and April, I'm assuming.
     
     
  #9755  
Old Posted Aug 2, 2016, 10:46 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,098
Quote:
Originally Posted by SkytrainCar026 View Post
The Evergreen line will be open in "Early 2017." That could mean anywhere between January and April, I'm assuming.
By the way things are going right now, I wouldn't be surprised if it will be earlier than that
     
     
  #9756  
Old Posted Aug 2, 2016, 11:01 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,593
Quote:
Originally Posted by nname View Post
By the way things are going right now, I wouldn't be surprised if it will be earlier than that
They'll open it Dec 31 and have free service that evening
     
     
  #9757  
Old Posted Aug 2, 2016, 11:40 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
Word on the street is December.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #9758  
Old Posted Aug 3, 2016, 1:21 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
They are actively finishing the tunnel section at the north portal where the TBM access was created. Lots of rebar and lots of concrete. Anyone know what is going to be left once this staging area is no longer required? I guess the site could be used for housing or a park.
     
     
  #9759  
Old Posted Aug 4, 2016, 10:19 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,098
Quote:
Originally Posted by SOSS View Post
They are actively finishing the tunnel section at the north portal where the TBM access was created. Lots of rebar and lots of concrete. Anyone know what is going to be left once this staging area is no longer required? I guess the site could be used for housing or a park.
They will restore the street that used to be run through that area.


Quote:
Originally Posted by SkytrainCar026 View Post
I checked the Evergreen Line construction camera website and found that one of the cameras had taken some pictures of test trains!
Lately they are testing regular service both directions using 2-car trains every 6-7 minutes, with station stoppings, door open/close, etc. On the second image, there would be an eastbound train just left Coquitlam Central station
     
     
  #9760  
Old Posted Aug 4, 2016, 10:36 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
If they could open the Evergreen Line on December 11, then it would be exactly 31 years to the day (and if they could do the time) of when the Expo line opened.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:55 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.