Quote:
Originally Posted by SOSS
They are actively finishing the tunnel section at the north portal where the TBM access was created. Lots of rebar and lots of concrete. Anyone know what is going to be left once this staging area is no longer required? I guess the site could be used for housing or a park.
|
They will restore the street that used to be run through that area.
Quote:
Originally Posted by SkytrainCar026
I checked the Evergreen Line construction camera website and found that one of the cameras had taken some pictures of test trains!
|
Lately they are testing regular service both directions using 2-car trains every 6-7 minutes, with station stoppings, door open/close, etc. On the second image, there would be an eastbound train just left Coquitlam Central station