Quote:
Originally Posted by Sheba
The number of trains going through for the whole route vs short turning was arbitrary and I have no idea what they'd choose. At a guess they'd probably choose to just short turn some of the trains from Waterfront only, which would reduce the frequency out to Langley. I'll leave the spur to Production Way and all the math to their computers.
|
Well, it doesn't really matter how many you short turn or don't. 1 in 2, 2 in 3, whatever, every train being routed to Production Way is one that isn't going to Surrey/Langley. That's the real chokepoint. Route more trains to Surrey and Langley (but keep headways on the Production spur under 5 minutes), and you get enough frequency to make short-tuning viable.
... But short-turning is still a bad idea.
Quote:
Originally Posted by Sheba
I wasn't suggesting skipping any stations, and how is the train going to be wrong railing? At the Langley end it could just travel to the tail track and come back on the proper side (just like they do at King George Station now) and at King George / Gateway / Scott Road (whichever station is chosen) it has the ability to switch tracks.
|
No matter how many tracks the train switches, the Surrey stations only have two platforms. If the short-turned Skytrain pulls into the westbound platform (to Waterfront), there's a potential conflict with other westbound trains coming in from Langley.
So our train stops on the eastbound platform (to Langley), waits a bit, then turns around and heads back west. Also a bad idea, since many people don't bother to read displays: expect a lot of complaints from people who see the train, hop on expecting to go to Langley, then are unpleasantly surprised when it heads back to Waterfront - and from more intelligent people who have to wait another 2-3 minutes for the next one.
TransLink could build a third platform, but that would be equally confusing for similar reasons. Might as well let every train terminate at Langley.