  #3401  
Old Posted Jun 25, 2016, 6:29 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
Smell of paving tar fills air at Rideau and Sussex

Norman Provencher, Ottawa Citizen
Published on: June 25, 2016 | Last Updated: June 25, 2016 1:34 PM EDT




The pungent, yet welcome scent of hot paving tar greeted pedestrians on Rideau Street near Sussex Avenue Saturday as work crews move to the final stage of repair of the dramatic sinkhole that struck June 8.

Crews have been determinedly working around the clock infilling the gaping pit, as well as pumping out water from an LRT tunnel below the hole.

Despite the encouraging signs on Saturday of paving trucks and rollers, it’s still not 100-per-cent certain the stretch will be open when U.S. President Barack Obama and Mexican President Enrique Peña Nieto arrive in town for the annual Three Amigos summit with Prime Minister Justin Trudeau in mid-week.

Work crews have repaired the damaged infrastructure and service has been restored to all affected businesses.

Steve Cripps, head of the city’s light rail implementation office had guesstimated reconstruction could be complete early next week.

But the intersection can’t reopen until engineers have inspected it and given their sign-off, he added.

“Our target is to open it as soon as we can, but of course safety is our priority,” Cripps said.

The city’s initial estimate for reopening the roads was one to two weeks.

http://ottawacitizen.com/news/local-news...aving-tar-fills-air-at-rideau-and-sussex
     
     
  #3402  
Old Posted Jun 26, 2016, 12:54 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by 1overcosc View Post
Climate change will actually make the problem easier as our winter cold is much more of a concern than our fairly tame summer heat.
It is a myth that climate change will make our winters warmer (stemming back from when it was misleadingly called global warming). What we will see are more weather extremes so it is quite possible that the number of days below -30 increases.

Quote:
Furthermore, summer heat is much easier to deal with as simple shading reduces much of its impact whereas cold is kind of everywhere.
The problem is there is so much glass in the stations that instead of providing shade, they will act like a greenhouse.

Quote:
Huh, I sit corrected. I could have sworn the all time record low was -36C.. perhaps the source I originally read it from was a different weather station.
If you look at the chart, it says that it was recorded in Ottawa, not at the Ottawa Airport. At some point NAV Canada switched the readings to the airport as they needed more accurate weather conditions than Environment Canada was giving them (NAV Canada now provides weather data to EC).

Quote:
That temperature was probably recorded at 3 in the morning, when trains wouldn't run anyway. In any case, actual temperatures below -30C are very, very rare in Ottawa.
Temperature lows are typically recorded just before sunrise, which in late December (when the low was recorded) is around 7:40 AM. Trains will definitely be running then.

Having said that, the temperature was probably picked because it matched the specifications of the train-set they wanted to buy.
     
     
  #3403  
Old Posted Jun 26, 2016, 6:28 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,650
So with the new configuration for Tunney’s Pasture Station now in place, I expect to see a new bridge being built soon. This will eventually be the extension of Goldenrod out to Scott Street. It will run perpendicular to the Transitway across the ‘flat’ section at the top of the ‘angled’ ramp in the following picture:

(from CBC Website)

Goldenrod will be extended over the old trench, just to the west (left) of the word “Closed”, for buses to directly access Scott without clogging Holland/Tunney’s Pasture Parkway. A new set of traffic control signals will be added at Goldenrod/Smirle and Scott. After the LRT opens, this new connection will be made public, but until then it is restricted to buses only.
     
     
  #3404  
Old Posted Jun 27, 2016, 3:11 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
The Three Amigos will be able to use Rideau Street this week

Meghan Hurley, Ottawa Citizen
Published on: June 26, 2016 | Last Updated: June 26, 2016 8:03 PM EDT




Rideau Street is expected to reopen to visiting dignitaries for this week’s North American Leaders’ Summit following repairs to damage caused by a sinkhole earlier this month.

“We were really targeting to get this done before the North America Leaders’ Summit and especially Canada Day,” city manager Steve Kanellakos said Sunday night.

U.S. President Barack Obama and Mexican President Enrique Peña Nieto will be in town with Prime Minister Justin Trudeau for the annual Three Amigos Summit, which takes place Wednesday at the National Gallery of Canada.

Kanellakos wrote in a memo that, as of Sunday afternoon, motorists and cyclists would be allowed to travel east on Rideau Street and turn left onto Sussex.

The city said in a statement that northbound Elgin Street was also reopening Sunday between Albert and Rideau streets, as was eastbound Wellington Street between Elgin to Rideau streets.

The repairs are almost complete, the city said, but southbound Sussex between George and Rideau streets will remain closed to motorists, cyclists and pedestrians. Kanellakos said that northbound Colonel By Drive was also to remain closed. Rideau Street between Sussex Drive and Waller Street also remained closed.

Kanellakos said he anticipates to have the final engineer’s report signed off on by Tuesday, just in time for the visit by the presidents.

He said that a majority of the sidewalks on Rideau have opened, allowing access to businesses in the area before the July 1 holiday that is likely to be one of the busiest days of the year. By Canada Day, the city hopes pedestrians will be able to walk on Rideau, which will be re-opened to OC Transpo buses and taxis on July 2.

On the weekend, the smell of hot paving tar greeted pedestrians on Rideau near Sussex as crews continued to repair the sinkhole.

Crews have been working around the clock infilling the gaping pit, as well as pumping out water from an LRT tunnel below the hole.

“I’m really happy with the progress,” Kanellakos said.

— With files from Norman Provencher

[email protected]
Twitter.com/meghan_hurley

http://ottawacitizen.com/news/local-news...l-be-able-to-use-rideau-street-this-week
     
     
  #3405  
Old Posted Jun 27, 2016, 3:38 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by roger1818 View Post
It is a myth that climate change will make our winters warmer (stemming back from when it was misleadingly called global warming). What we will see are more weather extremes so it is quite possible that the number of days below -30 increases.
Specific effects of climate charge are notoriously hard to predict, but according to most models, the most likely result for our region is that the overall average temperature rises, but that winter will warm much more than summer will. The region is expected to warm by 3C overall; however, this is most likely to end up being something like 5-6 degrees added to fall and winter temperatures with spring and summer temperatures only going up by 1-2 degrees. So our winters will be much milder but our summers won't be that much hotter.

This has been the trend with the climate change that's already happening:

Look at how the 1961-1990 climate data (http://climate.weather.gc.ca/climate_nor...txtCentralLongSec=0&stnID=938&dispBack=0) differs from the 1981-2010 climate data, just twenty years later (http://climate.weather.gc.ca/climate_nor...xtCentralLongSec=0&stnID=4333&dispBack=0

Here's the average afternoon temperature for each month, in the two data sets:

Month 1961-1990 1981-2010 Increase
January -6.4 -5.8 +0.6
February -4.5 -3.1 +1.4
March 1.8 2.4 +0.6
April 10.8 11.4 +0.6
May 18.6 19.0 +0.4
June 23.6 24.1 +0.5
July 26.4 26.6 +0.2
August 24.7 25.4 +0.7
September 19.7 20.5 +0.8
October 12.8 12.8 0.0
November 4.8 5.5 +0.7
December -3.6 -2.0 +1.6
Annual Average 10.7 11.4 +0.7

The most dramatic increases in temperature were in December and February, while July was almost unchanged.

Applying an increase of 5-6C to winter temperatures is interesting; it pushes all of our winter months to the point where temperatures above zero are typical in the afternoon, and will likely mean the end of consistent snow cover.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3406  
Old Posted Jun 28, 2016, 3:38 AM
concrete06 concrete06 is offline
Registered User
 
Join Date: Aug 2006
Posts: 81
End of the line at Tunney's...

     
     
  #3407  
Old Posted Jun 28, 2016, 3:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,003
Quote:
Originally Posted by zzptichka View Post
I think there is.
There has to be some kind of connection to that entrance on the South side too
What about Wellington though, why does it end at Booth abruptly. Should it be there at all?

Quote:
Originally Posted by Hybrid247 View Post
Its hard to tell, but seems like that specific area is uncovered based on the render. The covered portion on the side closest to the aqueduct only appears to begin where the Pimisi station's roof ends.



Here's a third angle.



It's the pedestrian underpass heading N/S under the station that I'm wondering about (as per the red dotted lines of zzptichka's post).
     
     
  #3408  
Old Posted Jun 28, 2016, 11:55 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
Operations for LRT tunnel secret for VIP visits to Ottawa

Jon Willing, Ottawa Citizen
Published on: June 28, 2016 | Last Updated: June 28, 2016 5:41 PM EDT


The city won’t say if it will ever have to close the Confederation Line LRT tunnel during visits by a U.S. president or other VIPs after the $2.1-billion rail system opens in 2018.

A city spokeswoman chalked it up to “security reasons” Tuesday after consulting with the Ottawa Police Service.

Part of the 2.5-kilometre tunnel is under Queen Street, just a couple of blocks from Parliament Hill.

On Wednesday the city is closing downtown streets north of Albert Street as a security precaution while U.S. President Barack Obama meets with Prime Minister Justin Trudeau and Mexican President Enrique Pena Nieto. Obama will be addressing Parliament.

OC Transpo is detouring a few bus routes away from the street closures in the core.

Stephanie Carvin, an assistant professor of international affairs at Carleton University and a former national security analyst, said the city will need to consider how it will operate LRT during a visit by a VIP the stature of a U.S. president.

“We might see an LRT shutdown during future visits. I wouldn’t rule that out at all,” Carvin said, noting the city will need to balance the importance of running the transit system with any security threats identified by law enforcement agencies.

“We don’t want to turn our LRT into Fort Knox,” Carvin said.

Christopher Stoney, the academic director for the new Transportation Policy Innovation Centre at Carleton, said he expects the centre will be exploring these kinds of issues.

Stoney believes the LRT won’t pose a significant threat to visiting dignitaries, particularly since they wouldn’t go anywhere near the rapid transit system. Major cities “do not have the luxury of shutting down the subway or underground for the day,” Stoney said in an e-mail.

The more significant risk would be violence, such as an explosion, underground or along the cavalcade route, Stoney said.

Carvin said the city and law enforcement agencies would work together to assess threats before making a decision on LRT operations.

“It should really depend on the context and what intelligence suggests this is a likely event to occur,” Carvin said. “Usually the most important thing is to provide the most accurate information as to what that threat is.”

The LRT project framework approved by council in 2012 included a “railway delegation agreement” giving the feds authority to take actions in case of security threats.

The agreement also touches on security during construction of the 12.5-kilometre LRT line.

The city wouldn’t say if the North American Leaders Summit on Wednesday will force any LRT-related work to stop in the tunnel. The city, again, cited security reasons.

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news/operations-for-lrt-tunnel-secret-for-vip-visits-to-ottawa
     
     
  #3409  
Old Posted Jun 29, 2016, 12:55 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
Rideau Street set to reopen between Sussex and William

Meghan Hurley, Ottawa Citizen
Published on: June 28, 2016 | Last Updated: June 28, 2016 8:43 PM EDT




Rideau Street will reopen to pedestrian traffic from Sussex Drive to William Street on Canada Day following repairs to damage caused by a sinkhole earlier this month, the city says.

City manager Steve Kanellakos said the street was declared safe to reopen by the contractor, Rideau Transit Group, late Tuesday afternoon.

Buses won’t be allowed back on Rideau Street until July 2, after this week’s North American leaders’ summit and Canada Day celebrations.

A majority of sidewalks on Rideau Street have already opened, allowing access to businesses in the area before the July 1 holiday that is likely to be one of the busiest days of the year.

http://ottawacitizen.com/news/local-news/rideau-street-reopens-between-sussex-and-william
     
     
  #3410  
Old Posted Jun 29, 2016, 1:08 AM
OhioGuy OhioGuy is offline
Registered User
 
Join Date: Jul 2004
Location: DC
Posts: 7,774
Quote:
Originally Posted by rocketphish View Post
Operations for LRT tunnel secret for VIP visits to Ottawa

Jon Willing, Ottawa Citizen
Published on: June 28, 2016 | Last Updated: June 28, 2016 5:41 PM EDT


The city won’t say if it will ever have to close the Confederation Line LRT tunnel during visits by a U.S. president or other VIPs after the $2.1-billion rail system opens in 2018.

A city spokeswoman chalked it up to “security reasons” Tuesday after consulting with the Ottawa Police Service.

Part of the 2.5-kilometre tunnel is under Queen Street, just a couple of blocks from Parliament Hill.

On Wednesday the city is closing downtown streets north of Albert Street as a security precaution while U.S. President Barack Obama meets with Prime Minister Justin Trudeau and Mexican President Enrique Pena Nieto. Obama will be addressing Parliament.

OC Transpo is detouring a few bus routes away from the street closures in the core.

Stephanie Carvin, an assistant professor of international affairs at Carleton University and a former national security analyst, said the city will need to consider how it will operate LRT during a visit by a VIP the stature of a U.S. president.

“We might see an LRT shutdown during future visits. I wouldn’t rule that out at all,” Carvin said, noting the city will need to balance the importance of running the transit system with any security threats identified by law enforcement agencies.

“We don’t want to turn our LRT into Fort Knox,” Carvin said.

Christopher Stoney, the academic director for the new Transportation Policy Innovation Centre at Carleton, said he expects the centre will be exploring these kinds of issues.

Stoney believes the LRT won’t pose a significant threat to visiting dignitaries, particularly since they wouldn’t go anywhere near the rapid transit system. Major cities “do not have the luxury of shutting down the subway or underground for the day,” Stoney said in an e-mail.

The more significant risk would be violence, such as an explosion, underground or along the cavalcade route, Stoney said.

Carvin said the city and law enforcement agencies would work together to assess threats before making a decision on LRT operations.

“It should really depend on the context and what intelligence suggests this is a likely event to occur,” Carvin said. “Usually the most important thing is to provide the most accurate information as to what that threat is.”

The LRT project framework approved by council in 2012 included a “railway delegation agreement” giving the feds authority to take actions in case of security threats.

The agreement also touches on security during construction of the 12.5-kilometre LRT line.

The city wouldn’t say if the North American Leaders Summit on Wednesday will force any LRT-related work to stop in the tunnel. The city, again, cited security reasons.

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news/operations-for-lrt-tunnel-secret-for-vip-visits-to-ottawa
The Metro here in DC doesn't shut down when the President is in a motorcade up above. The Metro also passes under Lafayette Park, which occupies the block directly north of The White House. I would think it's unnecessary to close the Confederation Line due to movement of certain VIPs above. So day to day operations are generally fine here. Certain stations are closed at times for big events, such as the Smithsonian station on The Mall for Independence Day, and the Convention Center station during the Nuclear Summit a couple months ago and during the Inaugural Ball that's held there. The rail lines continued operating through those areas, it was only those specific stations that were skipped/closed.
     
     
  #3411  
Old Posted Jun 29, 2016, 1:54 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by OhioGuy View Post
The Metro here in DC doesn't shut down when the President is in a motorcade up above. The Metro also passes under Lafayette Park, which occupies the block directly north of The White House. I would think it's unnecessary to close the Confederation Line due to movement of certain VIPs above. So day to day operations are generally fine here. Certain stations are closed at times for big events, such as the Smithsonian station on The Mall for Independence Day, and the Convention Center station during the Nuclear Summit a couple months ago and during the Inaugural Ball that's held there. The rail lines continued operating through those areas, it was only those specific stations that were skipped/closed.
The used to use the Transitway for the motorcades to go between the airport in Ottawa and the Parliament Buildings. That is why the questions now.
     
     
  #3412  
Old Posted Jun 29, 2016, 8:51 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by J.OT13 View Post
Here's a third angle.



It's the pedestrian underpass heading N/S under the station that I'm wondering about (as per the red dotted lines of zzptichka's post).
See the pretty little stone bridge on the right of the Lebreton renderings and left of the LRT rendering? There's a road directly above & hiding the bridge in the LRT rendering (Rd is at a different spot on the Lebreton rendering), and it looks like people can enter the station from that road instead.
     
     
  #3413  
Old Posted Jun 29, 2016, 5:18 PM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by OhioGuy View Post
The Metro here in DC doesn't shut down when the President is in a motorcade up above. The Metro also passes under Lafayette Park, which occupies the block directly north of The White House. I would think it's unnecessary to close the Confederation Line due to movement of certain VIPs above. So day to day operations are generally fine here. Certain stations are closed at times for big events, such as the Smithsonian station on The Mall for Independence Day, and the Convention Center station during the Nuclear Summit a couple months ago and during the Inaugural Ball that's held there. The rail lines continued operating through those areas, it was only those specific stations that were skipped/closed.
That makes sense to me. No need to shutdown the line but close access to certain stations if deemed necessary.
     
     
  #3414  
Old Posted Jun 30, 2016, 4:43 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
Construction Update
Week of June 27




Rideau Street has been repaved

Central Stations


Update on Rideau Street infrastructure failure:

Repair works are proceeding well on Rideau Street. A majority of sidewalks have re-opened, Rideau Street has been repaved, utility repair works are nearly complete, watermain replacements have been completed and the reinstatement of permanent watermain connections is well underway.

City engineers have confirmed that the intersection of Rideau Street and Sussex Drive is safe to re-open. Partial re-opening of the intersection has taken place, as some additional work is required near the roadway that will cause some traffic impacts.

Rideau Station west entrance: crews continue station excavation, material removals and install reinforcements.

Rideau Station cavern: station work continues and includes waterproofing, installing rebar and concrete pours. At the East Portal ramp, sheet piling is ongoing overnight for the next several weeks in preparation for future guideway work.

Rideau Station east entrance: the station entrance progresses as waterproofing and rebar installation continue, part of foundation work.

Traffic restrictions on Rideau Street remain in effect.



West Portal ramp excavation

Lyon Station cavern: work on the station concourse level is ongoing as crews pour concrete and continue work on the arch final lining.

Here you see the West Portal ramp, where excavation and reinforcements occur in preparation for future guideway work.

Lyon Station west entrance: crews complete final stages of excavation; activities include hoe ramming and material removals. Work begins on the mud slabs.

Lyon Station east entrance: work on the station concourse level continues as crews install formwork and rebar in preparation for concrete pours. Crews also install formwork for the elevator walls and begin preparations for structural steel and concourse slab work.



Removals at the uOttawa Station pedestrian tunnel

Parliament Station cavern: station construction is ongoing as crews install rebar and pour concrete at the future site of the station elevators.

Parliament Station west entrance: crews install falsework, rebar and pour the concrete slab as work on the stairs and foundation is ongoing. At street level, crews excavate and install reinforcements. Work on the vents shafts continues across the downtown integrated stations.

Parliament Station east entrance: crews continue rebar installation, concrete pours and structural steel installation as part of work on the station concourse level and stairs.

Traffic restrictions on Queen and O’Connor streets remain in effect.

uOttawa Station: crews continue excavating and pouring the mud slab, part of preliminary station construction. Utility work begins and includes plumbing and duct bank installation.


Tunnel Excavation

Mining of the running tunnel bench continues east of Parliament.



Excavation at Pimisi Station

West Stations


Tunney’s Pasture Station: crews continue work at the Tunney’s Pasture temporary bus loop as the final portion of the guideway between Merton Street and Tunney’s Pasture is now closed; activities include light installations.

Bayview Station: crews drill and pour caissons as part of station foundation work. During lifting operations currently underway as part of Bayview Station work and for the safety of all Bayview pathway users, short-term closures will be required. Flaggers are onsite to assist.

Here you see Pimisi Station, where initial station foundation work continues as crews excavate the station footings.



Hurdman Station

East Stations


Lees Station: crews begin drilling caissons, part of initial station foundation work.

Closure of Transitway pedestrian access from Lees to uOttawa stations.

Here you see Hurdman Station, where station foundation work is ongoing; activities include installing grade beams and rebar, and pouring concrete.

Crews install duct banks and prepare to pour concrete platforms, part of permanent bus loop construction. At the bus operators’ building, backfilling and electrical installations are ongoing.

Tremblay Station: the station continues to take shape as crews install structural steel and begin formwork for the concourse. Crews also continue electrical installations and prepare to begin masonry work for the station.



Crews install structural steel and falsework at Cyrville Station

St-Laurent Station: crews finalize station utilities including duct bank installation and plumbing. Crews backfill, pour concrete and begin masonry work.

Here you see Cyrville Station, where the station continues to progress as crews install station concourse falsework and rebar for the concrete slab. Electrical work for the TPSS and structural steel installations continue.

Blair Station: the station continues to take shape as crews pour concrete for the station walls and footings, install structural steel and work on the station’s elevators. Station utility work is ongoing including plumbing and pouring concrete for duct banks.



Guideway west of Tremblay Station ready for trackwork

Guideway – Bayview CPR Bridge to Preston Street, Mann Avenue Bridge to west of Lees Station, Rideau River Transitway Bridge to east of Hurdman Station and west of Tremblay Station to Blair Station

Bayview CPR Bridge to Preston Street: excavation, asphalt removals and grading are ongoing as part of initial guideway work.

Mann Avenue Bridge to west of Lees Station: crews begin installing OCS pole foundations and continue sewer work.

Rideau River Transitway Bridge to east of Hurdman Station: backfilling and asphalt removals continue as part of initial guideway work. At the structure east of the Hurdman Station bus loop, crews backfill the approach slab and construct the embankment.

Hurdman Station Elevated Guideway: the elevated guideway continues to take shape as crews pour the deck.

Belfast Yard to west of Tremblay Station: grading is completed west of
Tremblay Station. Trackwork continues in preparation for vehicle testing as early as the fall; activities include ballast installation and pulling rail.

St-Laurent Station to Blair Station: final trackwork occurs in preparation for vehicle testing as early as the fall; activities include welding and final tamping.



Demolition and caisson installation at the CPR Bridge near Bayview Station

Other Activities


Here you see CPR Bridge near Bayview Station, where crews continue drilling caissons and begin mobilization for column work as part of bridge renewal. During lifting operations currently underway as part of Bayview Station work and for the safety of all Bayview pathway users, short-term closures will be required. Flaggers are onsite to assist.

Booth Street Bridge: the bridge continues to progress as crews finalize work on the approach slabs.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Tunney’s Pasture Station construction.
  • Bayview Station construction.
  • Blasting at Parliament Station east entrance.
  • Final concrete work in Parliament Station cavern.
  • Mann Avenue Bridge rehabilitation.
  • Watermain work near St-Laurent Station, along the guideway.
  • TPSS deliveries along the alignment.
  • Bus operators’ building construction and catch basin/landscaping work at Blair Station.

http://www.ligneconfederationline.ca/news/construction-update-79/
     
     
  #3415  
Old Posted Jul 6, 2016, 1:40 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Booth Street bridge will be completed and re-opened to traffic on September 4th.

The Preston street extension will be closed on the same day and Preston will once again end at Albert. This connection is planned to be rebuilt (to proper standards; the extension we have now was built to shoddy standards on purpose because it was intended to be temporary) as part of the Lebreton redevelopment.

The temporary Lebreton Transitway stop will be moved from Albert & Preston to Albert & Booth. This will be the third temporary Lebreton stop.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3416  
Old Posted Jul 7, 2016, 3:12 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,649
Construction Update
Week of July 4




Progress at Rideau Station east entrance

Central Stations


Rideau Station west entrance: excavation is nearly completed and crews continue installing whaler beams as part of reinforcement work. Crews also install formwork in preparation for pouring the concrete slab.

Rideau Station cavern: the station continues to progress as crews waterproof and install rebar. Crews pour the invert, or base level of the tunnel. At the East Portal ramp, sheet piling continues overnight.

The Rideau Station east entrance, shown here, continues to take form as crews install rebar for the station slab. Electrical and mechanical work is ongoing.

Traffic restrictions on Rideau Street remain in effect.



Concrete pours at Parliament Station west entrance

Parliament Station cavern: crews continue installing rebar and pouring concrete for the slab, part of station foundation work.

Pictured here, the Parliament Station west entrance begins to take shape as crews complete falsework and rebar, and prepare to pour concrete. At street level, excavation and reinforcements occur.

Parliament Station east entrance: work continues on the concourse level as crews install rebar and pour concrete for the stairs. Preparations to install structural steel begin.

Traffic restrictions on Queen and O’Connor streets remain in effect.



Excavation at uOttawa Station

Lyon Station cavern: in the station, crews continue installing rebar and formwork for the concrete slab and station columns. Arch final lining concrete pours are ongoing. At the West Portal ramp, crews excavate and install reinforcements.

Lyon Station west entrance: the station entrance work continues as crews waterproof, install reinforcements and pour the mud slab.

Lyon Station east entrance: crews install rebar and pour concrete on the station’s concourse level. On the ground floor, crews continue demolition and install formwork for the elevator walls. Final mechanical works occur.

At uOttawa Station, seen here, construction progresses; activities include excavation for the watermain, and waterproofing and utility installation, part of foundation work.



Tunnel Excavation and Support

Running tunnel east of Parliament: mining of the running tunnel bench is ongoing.



Preparing for foundation work at Pimisi Station

West Stations

At Pimisi Station, seen here, crews excavate station footings and mobilize to begin caisson installation, part of initial station foundation work.

Bayview Station: station foundation work is ongoing as crews drill and pour caissons. During lifting operations currently underway as part of Bayview Station work and for the safety of all Bayview pathway users, short-term closures of the multi-use pathway will be required. Flaggers are onsite to assist.

Tunney’s Pasture Station: at the temporary bus loop, crews complete final works including electrical installations.



Backfilling and rebar installation at Tremblay Station

East Stations


Lees Station: crews continue working on the station foundation including drilling caissons.

Closure of Transitway pedestrian access from Lees to uOttawa stations.

Hurdman Station: the station foundation is taking shape as crews continue installing grade beams and pier caps. At the permanent bus loop, work occurs on the platforms and crews pour the concrete floor slab, and begin installing masonry at the bus operators’ building.

At Tremblay Station, shown here, the station continues to progress as crews install structural steel, backfill the platform area and prepare to begin masonry. Electrical installations and waterproofing are ongoing.



Coring the fixation slab at St-Laurent Station

Pictured here is St-Laurent Station, where crews continue grading and pouring concrete for the escalator. Work for the electrical room, watermain relocation and masonry are ongoing. Trackwork crews continue coring* the fixation slab.



Completing the roof deck at Blair Station

Cyrville Station: crews continue to install formwork and rebar on the concourse level. At the west end of the station, structural steel installation begins.

At Blair Station, shown here, crews pour concrete, install structural steel, complete the metal roof deck and work on the station elevators. Plumbing installation and concrete pours for duct banks continue as part of station utility work. Trackwork crews complete tamping activities at the station.



Sewer work and grading west of Lees Station

Guideway Construction – Tunney’s Pasture moving east, Bayview CPR Bridge to Preston Street, Mann Avenue Bridge to west of Lees Station, Rideau River Transitway Bridge to east of Hurdman Station and west of Tremblay Station to Blair Station

Tunney’s Pasture moving east: crews begin line drilling and hoe ramming to prepare for the TPSS installation just east of Tunney’s Pasture Station, part of initial guideway work.

Bayview CPR Bridge to Preston Street: crews continue rock removals and begin laying granular as part of guideway work.

Shown here is the area between Mann Avenue Bridge and Lees Station, where crews continue sewer work in preparation for future trackwork along this section of the guideway.

Rideau River Transitway Bridge to east of Hurdman Station: initial guideway work continues with backfilling, asphalt removals and preparations to construct the embankment east of the elevated guideway.

Hurdman Station Elevated Guideway: final work on the concrete deck is being completed and crews begin work on the parapet walls and west abutment.

West of Tremblay Station to Blair Station: crews continue installing ballast and prepare to pull rail west of Tremblay Station. Between St-Laurent and Blair stations, crews complete final alignment and surveying in preparation for vehicle testing as early as the fall.



Progress at the Booth Street Bridge

Other Activities

CPR Bridge near Bayview Station: crews finalize caisson drilling and mobilize to begin column installation, part of bridge renewal work. During lifting operations currently underway, and for the safety of all Bayview pathway users, short-term pathway closures will be required. Flaggers are onsite to assist.

At the Booth Street Bridge, pictured here, work to reinstate the Booth Street Bridge continues and crews begin utility work.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Tunney’s Pasture Station construction.
  • Bayview Station construction and short-term pathway realignments.
  • Blasting at Parliament Station east entrance.
  • Final concrete work in Parliament Station cavern.
  • Mann Avenue Bridge rehabilitation.
  • Watermain work near St-Laurent Station, along the guideway.
  • TPSS deliveries along the alignment.
  • Bus operators’ building construction and catch basin/landscaping work at Blair Station.

http://www.ligneconfederationline.ca/construction/construction-update-80/
     
     
  #3417  
Old Posted Jul 7, 2016, 9:21 PM
condo_dreams condo_dreams is offline
Registered User
 
Join Date: Mar 2010
Posts: 46
Quote:
Originally Posted by 1overcosc View Post
Booth Street bridge will be completed and re-opened to traffic on September 4th.

The Preston street extension will be closed on the same day and Preston will once again end at Albert. This connection is planned to be rebuilt (to proper standards; the extension we have now was built to shoddy standards on purpose because it was intended to be temporary) as part of the Lebreton redevelopment.

The temporary Lebreton Transitway stop will be moved from Albert & Preston to Albert & Booth. This will be the third temporary Lebreton stop.
Would you have a source for this by any chance?
     
     
  #3418  
Old Posted Jul 7, 2016, 10:57 PM
YOWflier's Avatar
YOWflier YOWflier is offline
Melissa: fabulous.
 
Join Date: Apr 2005
Location: YOW/CYOW/CUUP
Posts: 3,193
Noting the non-photos of tunnel cavern/stations in recent construction updates ... hmmm.

Also, for anyone following @ottawacity/#OttLRT on Twitter, some nice pics are often posted:


https://twitter.com/ottawacity/status/751184083271688192


https://twitter.com/CounterClick/status/750522020404744192

etc.
     
     
  #3419  
Old Posted Jul 8, 2016, 7:21 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by condo_dreams View Post
Would you have a source for this by any chance?
Hearsay from connections at OC.

I imagine the city will be putting out a press release soon.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3420  
Old Posted Jul 8, 2016, 9:34 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,650
Correct me if I am wrong, but this photo from the last construction update looks to me like the section immediately south of Lees Ave., not “Sewer work and grading west of Lees Station”, as described.



(I’m not complaining, since I sometimes get west and east mixed up too, but just trying to ensure accuracy.)
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:39 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.