HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #1301  
Old Posted Jun 29, 2016, 9:45 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
A) Just because SkyTrain is expanding doesn't mean it's the only thing in the budget. If there's $120M allocated to an SFU gondola, $200M for a light rail line in between SkyTrain projects seems more than doable.

B) Those are the present numbers. Once the city's transit backbone gets extended down Broadway, you're going to see a lot more West Side north-south ridership from people trying to get to the Millennium - especially along the Corridor, which is getting a whole crapload of townhomes and zero rapid transit.
A) Just because it seems doable does not mean it is a priority. AFAIK The UBC line, the Gondola and the Surrey LRT are the next priorities. These are places that have no real rapid transit and the numbers speak well to adding rapid transit.

B) While that may become the case, I am almost willing to bet that even with those townhomes, there will still not be the need for rapid transit in that area for at least the next 25-50 years.

Why would the government waste money for a line that is not heavily used as a bus route?
Reply With Quote
     
     
  #1302  
Old Posted Jun 29, 2016, 10:01 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by swimmer_spe View Post
A) Just because it seems doable does not mean it is a priority. AFAIK The UBC line, the Gondola and the Surrey LRT are the next priorities. These are places that have no real rapid transit and the numbers speak well to adding rapid transit.

B) While that may become the case, I am almost willing to bet that even with those townhomes, there will still not be the need for rapid transit in that area for at least the next 25-50 years.

Why would the government waste money for a line that is not heavily used as a bus route?
But TransLink's priorities after those ones are...? I'm guessing a 41st/49th line, a Willingdon line (possibly to North Van), several B-Lines, and one side project which is probably going to be the Downtown Streetcar.

Once that gets built, it makes sense to already have part of the Corridor reserved to extend the Streetcar through mid-density neighbourhoods, ending at Marine Drive. I hate to repeat this ad nauseum, but a line from Stanley Park through downtown through False Creek through the West Side, with five SkyTrain connections, will definitely have the ridership.
Reply With Quote
     
     
  #1303  
Old Posted Jun 29, 2016, 10:09 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
But TransLink's priorities after those ones are...? I'm guessing a 41st/49th line, a Willingdon line (possibly to North Van), several B-Lines, and one side project which is probably going to be the Downtown Streetcar.

Once that gets built, it makes sense to already have part of the Corridor reserved to extend the Streetcar through mid-density neighbourhoods, ending at Marine Drive. I hate to repeat this ad nauseum, but a line from Stanley Park through downtown through False Creek through the West Side, with five SkyTrain connections, will definitely have the ridership.
Lets look at this with some history. Priorities have changed. They likely didn't do the UBC line before Evergreen because of the bad feelings on the construction of the Canada line.

In 15-20 years, after the UBC, Surrey, SFU and North Van lines are built, there will be other lines that will demand construction.

Arbutus is just not in the right location to make spending tax dollars on it realistic.
Reply With Quote
     
     
  #1304  
Old Posted Jun 30, 2016, 4:13 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i have never been a fan of at-grade transit, such as a street car/LRT. i find they don't improve anything all that much. but, having said that, the Arbutus ROW is one of the ONLY places where at grade transit actually makes sense since it is quite close to being grade separated.

it would be a shame if the city got rid of some of the ROW. it would be wonderful to have a LRT Line akin to the Olympic Line running from the East Fraser Lands, to Marine Gateway, down arbutus into Kerrisdale, through to Broadway/Millennium Line, down connecting to Granville Island, down to Olympic Village, to Main Street-Science World, and over to Yaletown.

it is sad that they sold off the ROW Spur that went to Kits Beach. it would have been quite nice to connect Kits Beach into that network. who knows, maybe one day the city can buy the Spur back and recreate it. the city did used to buy property along Point Grey Road, hence all the parks.

map i made, i used an original map from the old Inter-Urban Line to pick the station locations.
Reply With Quote
     
     
  #1305  
Old Posted Jun 30, 2016, 5:34 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Looks like VancouverOfTheFuture covered all the major points. I'll just add the City's ideas to his:



This, down Arbutus, all the way to Marine Drive Station (possibly further) - now that's a rapid transit line.

Quote:
Originally Posted by swimmer_spe View Post
In 15-20 years, after the UBC, Surrey, SFU and North Van lines are built, there will be other lines that will demand construction.
That's why I say "side project," and keep using the SFU Gondola as an analogy. A $200M price tag means any streetcar can be built at the same time as one or two Skytrain lines without the projects cannibalizing funds from each other. Unless the Mayors get involved, of course, but that''s another story.

Quote:
Originally Posted by swimmer_spe View Post
Arbutus is just not in the right location to make spending tax dollars on it realistic.
And if Skytrain was the tech in question, I'd agree with you - Arbutus is way too close to the Canada Line for an RRT line. But we're talking about an LRT line to complement and extend the RRT backbone, not duplicate it.

I'm not saying we should build said line now (and if I did, I apologize), but we should reserve some space for it. Once the downtown streetcar gets built, an extension down Arbutus is the logical next step. The ROW is already there, the cost is relatively low, and it'd be easy to build - it'd be a shame if the entire Corridor is wasted as a 20m-wide sidewalk.
Reply With Quote
     
     
  #1306  
Old Posted Jun 30, 2016, 6:03 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Migrant_Coconut View Post
And if Skytrain was the tech in question, I'd agree with you - Arbutus is way too close to the Canada Line for an RRT line. But we're talking about an LRT line to complement and extend the RRT backbone, not duplicate it.

I'm not saying we should build said line now (and if I did, I apologize), but we should reserve some space for it. Once the downtown streetcar gets built, an extension down Arbutus is the logical next step. The ROW is already there, the cost is relatively low, and it'd be easy to build - it'd be a shame if the entire Corridor is wasted as a 20m-wide sidewalk.
By "reserve space" I presume you mean "don't let any properties encroach on the ROW again" vs CoV's plan for a greenbelt.

I'll maintain that a streetcar/LRT is still a bad idea. If the CoV wants to keep bylaw 8,242.73 on the books without repealing section 2.1.a.(v) then there is no point even thinking about anything but a greenway, as the way the bylaw is worded right now only allows for "rail" without limitations "except" above-grade. It doesn't explicitly say "streetcar" or "light rail" any more than it says "subway", so the likely thing to be built is a subway when it's necessary rather than share the space with an at-grade train that would reduce the "greenway."

As mentioned before, once something is built, it's very hard to replace it with something else due to the outcry of wasteful spending. I don't see the City of Vancouver operating a streetcar/LRT independent of Translink so nothing is going to be built unless the CoV decides to sell/donate it to Translink.
Reply With Quote
     
     
  #1307  
Old Posted Jun 30, 2016, 6:14 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
Looks like VancouverOfTheFuture covered all the major points. I'll just add the City's ideas to his:



This, down Arbutus, all the way to Marine Drive Station (possibly further) - now that's a rapid transit line.

That's why I say "side project," and keep using the SFU Gondola as an analogy. A $200M price tag means any streetcar can be built at the same time as one or two Skytrain lines without the projects cannibalizing funds from each other. Unless the Mayors get involved, of course, but that''s another story.

And if Skytrain was the tech in question, I'd agree with you - Arbutus is way too close to the Canada Line for an RRT line. But we're talking about an LRT line to complement and extend the RRT backbone, not duplicate it.

I'm not saying we should build said line now (and if I did, I apologize), but we should reserve some space for it. Once the downtown streetcar gets built, an extension down Arbutus is the logical next step. The ROW is already there, the cost is relatively low, and it'd be easy to build - it'd be a shame if the entire Corridor is wasted as a 20m-wide sidewalk.
We can start talking when they start building the downtown streetcar lines. Till then, this is a dream and everyone knows it.

The line is not needed. The area does not have the ridership. Give a viable reason for it to ever be built. Otherwise that is $200 million that could go to more pressing transit matters.
Reply With Quote
     
     
  #1308  
Old Posted Jul 4, 2016, 5:34 PM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,210
Quote:
Originally Posted by swimmer_spe View Post
We can start talking when they start building the downtown streetcar lines. Till then, this is a dream and everyone knows it.

The line is not needed. The area does not have the ridership. Give a viable reason for it to ever be built. Otherwise that is $200 million that could go to more pressing transit matters.
I hate streetcars, but I will admit that a line from VCC-Clark or Main Steet to Kitsilano via Granville Island would do wonders in terms of improving transit. The ROW is already there and BNSF will probably be abandoning operations in the yard near VCC-Clark….but it seems like the COV is solely concerned about appeasing NIMBY’s so it looks like we’ll have to deal with packed 84’s or multiple transfers for the foreseeable future. In fact, the COV is looking to tear up or cover up the spur along False Creek in the fall...go figure.
Reply With Quote
     
     
  #1309  
Old Posted Jul 4, 2016, 11:26 PM
Genauso's Avatar
Genauso Genauso is offline
A hole being Doug
 
Join Date: Dec 2013
Posts: 498
Because a streetcar line won't be completed within the next 10 years, any new system implemented by Translink ought to be driverless. It is a huge savings in operational costs.

The two reasons for promoting grade separation are decoupling the reliability from the road network's traffic jams, and the controlled environment has allowed safe driverless systems with the computing & networking available decades ago.

Any development along the Arbutus ROW should have the requirement for building the segment of underground tunnel first. Because having a second layer to the road transportation network will be important in resiliency through disasters, as well as allow room to grow without being extorted by anyone's veto power.


Honestly, the real priority should be a smarter network of traffic lights. I get the impression they are individually programmed, have no sense of context, and often intentionally disrupt the smooth flow of traffic (on Pacific Blvd in particular, stop&go is bad for the environment, bad for mental health, and encourages excessive acceleration/speeding).

Contrast that with LA and I think I saw a feature about how theirs are all connected now, to enable smart things like shepherding a traffic jam around an accident. Think about the buried cable loops to sense the metal car frames, each one has to cost at least $10,000-20,000 in installation -- video cameras that do a better job would cost what, 1/5th or 1/10th the price?

We don't look at the system as a whole often enough. Overspending on a pet project is a win, and bottleneck is something to ignore until the complaints stop -- why have a bureaucracy if you don't use its power to deflect blame. Translink should have the most mindless job in the world, reduce or eliminate bottlenecks as efficiently as possible. That current arguments are about all the wrong things, is just a symptom of people who want to feel good, since they've given up on doing good.

An LRT vs Bus along Arbutus will not make any significant improvement for speed or costs. Yet the arguments remain. If you want to be controversial, try removing the Patullo instead of doing expensive emergency repairs and boost traffic on the Port Mann.
Reply With Quote
     
     
  #1310  
Old Posted Jul 5, 2016, 5:10 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by Genauso View Post
Because a streetcar line won't be completed within the next 10 years, any new system implemented by Translink ought to be driverless. It is a huge savings in operational costs.

The two reasons for promoting grade separation are decoupling the reliability from the road network's traffic jams, and the controlled environment has allowed safe driverless systems with the computing & networking available decades ago.
I'll concede Skytrain's lower operating cost, but I don't understand this fixation on grade separation - not when the Corridor's ROW practically makes it grade-separated already.

The main reason why most of the forum (myself included) has been against the Broadway/Surrey light rail plans is that they have the trains running right through the middle of an important arterial street and in conflict with all the traffic on it - at best slowing the trains down, at worst causing collisions. That would be bad.

Except that this is the closest the Arbutus tracks get to the road.



Completely independent of Arbutus Street/West Boulevard/West 6th/etc and all their intersections by 10-20 metres. I don't see much room for a collision; even less, given relatively inexpensive signals and barriers that would make cross-street traffic a non-issue, and allow a tram/LRT to go at regular speeds. Seems unnecessary to spend $2 billion to replace the tracks with a very expensive tunnel, not when leaving said tracks in place and spending a fraction of that price gets you the exact same thing.
Reply With Quote
     
     
  #1311  
Old Posted Jul 5, 2016, 5:46 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Migrant_Coconut View Post
I'll concede Skytrain's lower operating cost, but I don't understand this fixation on grade separation - not when the Corridor's ROW practically makes it grade-separated already.
The "serious" reason is that most people on this forum see it as going backwards.

But a lot of it also comes from some fans of the BCER/SRY and streetcars who hate on the Skytrain, so the only thing that can be answered with is "please stop irrationally hating the Skytrain".

Ever notice how most people don't object to the West Coast Express, or even running another West Coast Express service? The main fight is between people trying to suggest that a streetcar somehow is better than a subway (Patrick Condon's school of thought) versus people who see the WCE and Subway/Skytrain options as increasing mobility, not destroying it like the street-car light rail proponents desire.
Reply With Quote
     
     
  #1312  
Old Posted Jul 5, 2016, 6:34 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by Kisai View Post
The main fight is between people trying to suggest that a streetcar somehow is better than a subway (Patrick Condon's school of thought) versus people who see the WCE and Subway/Skytrain options as increasing mobility, not destroying it like the street-car light rail proponents desire.
On the Globe & Mail/Province/Metro/etc comment pages, absolutely.

So far the fight here, on the other hand, seems to be about whether Vancouver's rapid transit network should be a mix of high-capacity Skytrain and LRT feeder lines, or Skytrain throughout. Many Skytrain-only proponents seem to have (understandably) jumped from "middle-of-the-road LRT like Broadway and Surrey is a very bad idea" to "all LRT is a very bad idea."
Reply With Quote
     
     
  #1313  
Old Posted Jul 5, 2016, 6:43 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,006
I am a huge skytrain supporter, I feel that both Broadway and the extension to Langley need to be grade separated, and i feel that far too many cities in North America are using at grade LRT as a one-size-fits-all solution (which, it doesn't).

That said, I agree 100 percent that the Arbutus corridor is perfect for at grade LRT. This is because the current ROW allows such an LRT to be more akin to a traditional heavy rail commuter train than a slower / more dangerous ON STREET at grade LRT.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #1314  
Old Posted Jul 5, 2016, 2:52 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,093
Well we could always try to stall city hall and their agenda until both are booted onto the street.
Reply With Quote
     
     
  #1315  
Old Posted Jul 5, 2016, 2:56 PM
Genauso's Avatar
Genauso Genauso is offline
A hole being Doug
 
Join Date: Dec 2013
Posts: 498
Quote:
Originally Posted by Migrant_Coconut View Post
I'll concede Skytrain's lower operating cost, but I don't understand this fixation on grade separation - not when the Corridor's ROW practically makes it grade-separated already.
I'm fine with a streetcar running down Arbutus corridor. My one caveat is that it flows smoothly -- which means integrating timing of crossings with nearby traffic lights so the train minimizes stops and cars don't miss a green light.

My thinking is that if for political reasons this can't happen in the next 10 years, and such a semi-controlled environment could be automated with nothing more than the 'Tesla autopilot' TODAY (well, it affordably could have been automated in 2000).... why not just put the money into automating bus routes one at a time. Start with simpler routes like on university campus or the C## shuttle buses around False Creek. Gain something unique/worthwhile/useful (fully separated route), and don't just spend money to look pretty.

As it is, the bus route does a better job than the train route simply because wherever the road and ROW diverge, the stops on the road would be more popular because they're near where people want to depart/arrive.

(fyi: our electric buses are amazing in energy efficiency per passenger
https://en.wikipedia.org/wiki/Energy_efficiency_in_transportation#Buses
Better than trains on dedicated track, given how many people fit standing)

To me, LRT is just an arbitrary vehicle. I don't care if it is rails, wheels, feet, flying.

Investing in grade separation is a fundamental asset. You can send vehicles down the fully separated ROW as fast as you want, as often as you want. You control everything about it together. Even if you have one crossing on a ROW, that can be the spot that shuts down the entire line.

It is separate from the road/sidewalk network. You don't have to negotiate who has what priority when -- which leads to fewer longer trains to minimize disruption of crossings. You keep flowing even when the road network is 'jammed' (traffic everywhere slows at once, perhaps due to a single bottleneck)

It's important to consider Grade Separation an asset in its own. Consider highway tunnels: how much smaller/cheaper can they be if all vehicles using them are electric? what if they were a zone where all vehicles were controlled by a computer in harmony? It's not transit/trains vs. cars.

Look at a map and generally you'll see a grid of perpendicular roads, such that the entire 2D surface is connected by roads. This is smart, it's exponentially better than everyone having to traverse a single ring road. Well adding another layer of traffic, say tunneled or elevated grade separated ROWs allow more than 2D connections. If you build a lot of them, you span 3D space and traveling between any 2 points becomes exponentially faster/cheaper which is another definition of overall capacity.

In a way, sidewalks are an extra dimension on our road network. Pedestrians do have to stop and wait to cross traffic normally. But in a traffic jam someone in a Taxi will automatically abandon the ride and walk to their destination. It's faster because the sidewalk network can disconnect from the road network, and walk through the stopped cars.
Reply With Quote
     
     
  #1316  
Old Posted Jul 5, 2016, 10:17 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,163
Quote:
Originally Posted by Genauso View Post
My thinking is that if for political reasons this can't happen in the next 10 years, and such a semi-controlled environment could be automated with nothing more than the 'Tesla autopilot' TODAY (well, it affordably could have been automated in 2000).... why not just put the money into automating bus routes one at a time. Start with simpler routes like on university campus or the C## shuttle buses around False Creek. Gain something unique/worthwhile/useful (fully separated route), and don't just spend money to look pretty.
Automated buses aren't going to happen in 10 years any more than light rail - and how are you going to get separated routes unless you close off the lane?
While I support procuring driverless vehicles to expand the fleet, procuring to replace the existing fleet seems inadvisable. They aren't any faster or larger (from what I've seen, sometimes smaller) than our current buses. Translink already took flak for spending $125 million on 45 LNG buses; spending the same amount on similar ones for the sole purpose of saving $3 million a year on driver's salaries (45 drivers, $30/hr) - to say nothing of the backlash from the drivers' union - would be inadvisable. By the time Translink recouped their investment, it'd already be time to retire the vehicles.

Quote:
Originally Posted by Genauso View Post
As it is, the bus route does a better job than the train route simply because wherever the road and ROW diverge, the stops on the road would be more popular because they're near where people want to depart/arrive.
And yet tying rapid transit to the road network brings you to the same problem as the Broadway/Surrey streetcar plans – you're always stuck at a red light. The ROW means a tram can move freely at whichever speed it needs to.

Quote:
Originally Posted by Genauso View Post
Better than trains on dedicated track, given how many people fit standing)
How so? Our trolleys' passageways aren't any larger than a tram – and the tram can have two sections, not just one.

Quote:
Originally Posted by Genauso View Post
Investing in grade separation is a fundamental asset. You can send vehicles down the fully separated ROW as fast as you want, as often as you want. You control everything about it together. Even if you have one crossing on a ROW, that can be the spot that shuts down the entire line.

It is separate from the road/sidewalk network. You don't have to negotiate who has what priority when -- which leads to fewer longer trains to minimize disruption of crossings. You keep flowing even when the road network is 'jammed' (traffic everywhere slows at once, perhaps due to a single bottleneck)
We agree on that. That's where proper traffic signals and/or barriers come in - which will probably be added as part of the greenway anyhow. Cross-traffic is stopped at the white line when the light changes (ideally, optimized to time with the city's grid), and we get the same vehicle speeds as a subway for a fraction of the money.

Quote:
Originally Posted by Genauso View Post
Look at a map and generally you'll see a grid of perpendicular roads, such that the entire 2D surface is connected by roads. This is smart, it's exponentially better than everyone having to traverse a single ring road. Well adding another layer of traffic, say tunneled or elevated grade separated ROWs allow more than 2D connections. If you build a lot of them, you span 3D space and traveling between any 2 points becomes exponentially faster/cheaper which is another definition of overall capacity.
Again, we agree. Yet there's only so much 3D space underground. Any Skytrain under the Corridor would have to wait in line behind, among other RRT projects, the Broadway extension and an inevitable 41st/49th Line. After those are built, an Arbutus Line would have to be dug deeper just to go under them, making it more expensive.
The entire point of grade separation is to make transit independent of road vehicles. Understandable for Broadway and 41st, having heavy cross-regional traffic and no parallel ROWs; for Arbutus, which doesn't have those problems, it's a bit ridiculous to need to wait 60-70 years and dig a $2+ billion tunnel in order to get something that the Corridor already provides.

Last edited by Migrant_Coconut; Jul 5, 2016 at 10:29 PM.
Reply With Quote
     
     
  #1317  
Old Posted Jul 6, 2016, 5:38 AM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Quote:
Originally Posted by GlassCity View Post
I simply don't believe in at-grade rapid transit, especially on rails. Accidents can shut down the line, and you affect both vehicle traffic as well as the rail line's speed and efficiency. Grade-separated metro or bust. The Canada Line can't be the only true north-south rapid transit line in the city forever. Eventually, you'll need others to help it out, and this seems like a great candidate.
Given what is happening in Metrotown, Brentwood, and now Joyce-Collingwood, and heck the Playland Expansion that is proposed, I have a feeling the city will need a North-South along Boundary Road far sooner than anything along Arbutus. I just have a feeling that in 30 years the Arbutus corridor will look largely the same as it does today. A few new things here or there sure, but more or less the same.

Not necessarily a bad thing.
Reply With Quote
     
     
  #1318  
Old Posted Jul 6, 2016, 7:07 AM
gkz gkz is offline
Registered User
 
Join Date: Jul 2013
Posts: 71
Quote:
Originally Posted by jhausner View Post
Given what is happening in Metrotown, Brentwood, and now Joyce-Collingwood, and heck the Playland Expansion that is proposed, I have a feeling the city will need a North-South along Boundary Road far sooner than anything along Arbutus. I just have a feeling that in 30 years the Arbutus corridor will look largely the same as it does today. A few new things here or there sure, but more or less the same.
I agree - Arbutus is a dead end. On the other hand, line going North-South along Willingdon up until Hastings, and then along Hastings to Downtown Vancouver, connects Metrotown, Brentwood, PNE/Playland, and a whole lot of high development potential land in Burnaby and along Hastings.

What significant development potential exists along the Arbutus corridor? Do you think the local NIMBYs will allow for increased density?
Reply With Quote
     
     
  #1319  
Old Posted Jul 8, 2016, 2:02 AM
Trainguy Trainguy is offline
Registered User
 
Join Date: Apr 2016
Posts: 689
The Arbutus ROW will become a multi-use path and stay that way pretty much. I can't see a tram of any sort flowing back and forth along there any time soon. There has to be a strong case for lots of passengers going north-south along that corridor. If the buses are crowded and demand is there, it will be built. Otherwise, not happening.
Reply With Quote
     
     
  #1320  
Old Posted Jul 9, 2016, 3:03 AM
zivan56 zivan56 is offline
Registered User
 
Join Date: Oct 2005
Location: Vancouver
Posts: 1,207
Found this video on YouTube from 2 days ago. The removal is basically done up until Marine Dr (minus removing the old ties near the end). Skip to 1 minute in to skip the Burrard Bridge.
Video Link
(posted by RLR)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:37 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.