Quote:
Originally Posted by esquire
I'm not saying that you or your relative are full of it, but it would seem extremely unlikely that Hydro would operate a 100,000 sf+ building for the purpose of accommodating the workspace preferences of some of its employees.
|
I had heard there was actually significant design issues with the Hydro tower which exactly prevented specific work units from being able to function in the Portage Ave building. An example would be HR. Due to the relatively open design and high ceilings conversations in meeting rooms can be overheard by people outside the room. If you are for example having a meeting to discuss an employees performance you do not necessarily want the whole workgroup hearing it. This reportedly lead to people that normally work at Portage Ave scheduling meetings with only other Portage Ave employees at the Taylor building. From what I heard it caused some interesting dynamics for Hydro employees...
The take away here is that TNSE will need to put some careful consideration into its final building design to avoid lots of issues when it is completed. The issues with Hydro, although less public, would be similar the major post-occupancy renovations at IGF or how the move in date for the police HQ was delayed when pumps failed to remove water from the building after a heavy summer storm.