Quote:
Originally Posted by Coldrsx
NW corner of their site I presume and?
|
I think so. This is from their
Comprehensive Institutional Plan:
"The City Centre Campus's west parcel of land has been remediated of rail yard contaminants with the exception of two small areas (4,047 and 800 square metres respectively). The larger contaminated area contains hydrocarbons, metals and polycyclic aromatic hydrocarbons while the smaller area contains metals.
The larger parcel is located north of the proposed Centre for Arts and Culture building and west of the Student Residence.
...
The larger site will be restored for surface parking with the reuse of acceptable granular material and the application of new, acceptable make-up material."